Permit #2020110408

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7016-00120-0420
CONDITIONED SPACE: 2016 sqft
GARAGE: 451 sqft
OPENED PORCH (WITH ROOF) : 250 sqft
OPENED PORCH (WITH ROOF) : 116 sqft
Total Square Footage: 2833 sqft
Block: 00120
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 386-447-7007
Location Address: 6 CLEMENT CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/12/2021
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: AGAT LLC

Address

6 FLAMINGO DR

PALM COAST, FL 32137

Lot: 0420
Contracted Stated Job Value: ¤284,000.00
Job Description: Single Home Residence
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
FERNANDO MEZA SR
Status Location Address State License Number Phone
CANCEL

457 CHELSEA PLACE AV

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2022) 570-575-8139

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 06/07/2022 APPROVED - AS NOTED EMADISON
Note: ** MET BUILDER ON SITE AS HE WAS FINISHING UP SEDIMENT REMOVAL FROM CANAL. TOLERANCES HAVE BEEN MET 4' FROM TOP OF SEA WALL TO BOTTOM. RIGHT SIDE FILLED IN RUTS CAUSED BY EROSION ON SLOP, WILL BE SODDED SETTING UP A TEMPORARY SILT FENCING ON SLOPE UNTIL NEW SOD AND GRASS TAKES ROOT. * NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION SEDIMENT HAS NOT BEEN REMOVED * RIGHT SIDE PROPERT DEVELOPING A LARGE WASHOUT CINTINUING TO WASH SEDIMENT INTO THE CANAL THIS NEEDS BE ADDRESSED SO AS TO NOT HAVE A NEGATIVE IMPACT ON THE CANAL. NOTE TO INSPECTOR: Remove the large pile of sediment that washed into the canal on BOTH rear property lines. Match the surrounding bottom grade.
ROW - FINAL APRON (AFTER POUR) 06/06/2022 APPROVED - AS NOTED EMADISON
Note: ** CORRECTIONS MADE Clean Culvert Ends
BLD - BUILDING FINAL 06/06/2022 FINAL APPROVED MKRASKI
Note:
ROW - STORMWATER FINAL 06/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: * NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION SEDIMENT HAS NOT BEEN REMOVED * RIGHT SIDE PROPERT DEVELOPING A LARGE WASHOUT CINTINUING TO WASH SEDIMENT INTO THE CANAL THIS NEEDS BE ADDRESSED SO AS TO NOT HAVE A NEGATIVE IMPACT ON THE CANAL. NOTE TO INSPECTOR: Remove the large pile of sediment that washed into the canal on BOTH rear property lines. Match the surrounding bottom grade.
BLD - BUILDING FINAL 05/31/2022 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION 1. Hallway outlet loose ( left of entry). 2. Front right bedroom outlet loose ( right wall). 3. Laundry walll outlet loose. 4. Master bedroom outlets loose. 5. Master bathroom shower water does not work. 6. Master bed room smoke covered. 7. No insulation. 8. Energy calcs do not match either units. 9. Garage door ceiling wire not sealed. 5-31-22 Garage door ceiling wire still not sealed.
ROW - DRAINAGE 05/09/2022 APPROVED - AS NOTED RGROSS
Note: Inspect the silt in the canal and take appropriate action THIS IS A REINSPECTION There is alot of sediment in the saltwater canal that needs to be removed. Personaly I would remove this before building the slab. 5/9/22 - This drainage issue is being addressed on the Final Stormwater Inspection.
ROW - STORMWATER FINAL 05/06/2022 Disapproved -FEE REQUIRED RGROSS
Note: Remove the large pile of sediment that washed into the canal on BOTH rear property lines. Match the surrounding bottom grade.
U -UTILITY RESIDENTIAL FINAL 05/06/2022 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 05/06/2022 Disapproved - NO FEE RGROSS
Note: Clean Culvert Ends
BLD - BUILDING FINAL 05/06/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 1. Hallway outlet loose ( left of entry). 2. Front right bedroom outlet loose ( right wall). 3. Laundry walll outlet loose. 4. Master bedroom outlets loose. 5. Master bathroom shower water does not work. 6. Master bed room smoke covered. 7. No insulation. 8. Energy calcs do not match either units. 9. Garage door ceiling wire not sealed.
FINAL SURVEY (OFFICE USE ONLY) 05/05/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION This inspection is for a "Final" survey not a "Foundation" survey.
ROW FIELD SURVEY /GRADING CERTIFICATION 05/05/2022 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 05/04/2022 Disapproved - NO FEE RGROSS
Note: This inspection is for a "Final" survey not a "Boundery" survey.
U-CROSS CONNECTION 04/19/2022 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 03/03/2022 APPROVED RGROSS
Note: READY TO POUR
GRAVITY SEWER TEST 01/26/2022 APPROVED MGIBSON
U - SEWER TIE IN 01/26/2022 APPROVED MGIBSON
ELECTRIC - EARLY POWER 11/29/2021 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION House needs to be unlocked 11/29/21 Emailed FPL at 10:55 am
ELECTRIC - EARLY POWER 11/24/2021 Disapproved - NO FEE JMUNSON
Note: House needs to be unlocked
U - SEWER TIE IN 11/22/2021 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 11/02/2021 APPROVED LMILLER
INSULATION 10/11/2021 APPROVED FWILLIS
Note: Need the following by insulation.... Slider door
ALL ROUGH 10/05/2021 APPROVED - AS NOTED LMILLER
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION cancelled per MIke 9-29-21... 1. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 a 1 2. 1 1/4 FROM EDGE, WHERE WIRING IS RUNS ALONG EDGE OF WOOD FBC E3802.1 WIRING SHALL NOT BE LESS THAN 1.25 inches AWAY FROM WOOD MEMBER 3. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 4. NEED TO SEAL DRYER DUCT AT ROOF WITH MASTIC..FBC.. M1502.4.2 AND M1601.4.1… Need the following by insulation.... Slider door 10-5-21... 1. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) Need the following by insulation.... Slider door
ALL ROUGH 09/29/2021 Disapproved -FEE REQUIRED LMILLER
Note: New inspection due to canceled inspection THIS IS A REINSPECTION cancelled per MIke 9-29-21... 1. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 a 1 2. 1 1/4 FROM EDGE, WHERE WIRING IS RUNS ALONG EDGE OF WOOD FBC E3802.1 WIRING SHALL NOT BE LESS THAN 1.25 inches AWAY FROM WOOD MEMBER 3. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 4. NEED TO SEAL DRYER DUCT AT ROOF WITH MASTIC..FBC.. M1502.4.2 AND M1601.4.1… Need the following by insulation.... Slider door
ALL ROUGH 09/28/2021 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION cancelled per MIke
ALL ROUGH 09/22/2021 CANCELLED BY APPLICANT LMILLER
Note: cancelled per MIke
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/07/2021 APPROVED JPI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION 1. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 2. need revision for engineers repair of altered trusses (highlighted an plans) 3. missing strapps (highlighted an plans) 902021... still need revision for engineers repair of altered trusses (highlighted an plans) 9-3-21... still need revision (revision musrt be approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/03/2021 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION 1. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 2. need revision for engineers repair of altered trusses (highlighted an plans) 3. missing strapps (highlighted an plans) 902021... still need revision for engineers repair of altered trusses (highlighted an plans) 9-3-21... still need revision (revision musrt be approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/02/2021 Disapproved - NO FEE WMILLER
Note: New inspection due to canceled inspection THIS IS A REINSPECTION 1. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 2. need revision for engineers repair of altered trusses (highlighted an plans) 3. missing strapps (highlighted an plans) 902021... still need revision for engineers repair of altered trusses (highlighted an plans)
ROOF VALLEY & METAL 08/30/2021 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/30/2021 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION 1. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 2. need revision for engineers repair of altered trusses (highlighted an plans) 3. missing strapps (highlighted an plans)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/20/2021 Disapproved -FEE REQUIRED WMILLER
Note: 1. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 2. need revision for engineers repair of altered trusses (highlighted an plans) 3. missing strapps (highlighted an plans)
ELEV CERT-FOUNDATION APPROVAL 08/18/2021 APPROVED JMYERS
TIE BEAM / LINTEL 07/27/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION Approved Documents need to be on site for inspection 107.3,1. 7-27-21... Notes above resolved
TIE BEAM / LINTEL 07/26/2021 Disapproved -FEE REQUIRED WMILLER
Note: NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION Approved Documents need to be on site for inspection 107.3,1.
FOUND SURVEY APPROVED (OFFICE) 07/08/2021 APPROVED TBAKER
MONOLITHIC SLAB 06/10/2021 APPROVED BGREVE
PLUMBING 1ST ROUGH UNDERGROUND 06/08/2021 APPROVED JGIBSON
RETAINING WALL FOUNDATION 05/06/2021 APPROVED BGREVE
FOOTER 04/14/2021 Disapproved -FEE REQUIRED BGREVE
Note: no approved drawings onsite no drawing for retaining wall footing onsite
FOOTER 04/14/2021 APPROVED BGREVE
Note: contractor brought plans to the site and i returned to complete inspection THIS IS A REINSPECTION no approved drawings onsite no drawing for retaining wall footing onsite
FOOTER 04/13/2021 Disapproved - NO FEE BGREVE
Note: no drawing for retaining wall footing onsite
ROW - DRAINAGE 03/19/2021 Disapproved -FEE REQUIRED KRUTH
Note: THIS IS A REINSPECTION There is alot of sediment in the saltwater canal that needs to be removed. Personaly I would remove this before building the slab.
ROW - DRAINAGE 03/15/2021 Disapproved - NO FEE KRUTH
Note: There is alot of sediment in the saltwater canal that needs to be removed. Personaly I would remove this before building the slab.
ROW - DRAINAGE 03/08/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION Per builder, calling to have a silt fence across the rear sea wall immediately to prevent sediment washout into the Canal. Next inspection 3/8/21. Corrections made next inspection 3/15/21
ROW - DRAINAGE 03/04/2021 Disapproved - NO FEE RGROSS
Note: Per builder, calling to have a silt fence across the rear sea wall immediately to prevent sediment washout into the Canal. Next inspection 3/8/21.
WATER METER INSTALLATION REQUEST 01/14/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 08/26/2021 08/27/2021
Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM
PLFM COMPLETE 08/17/2021 08/18/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The building elevation certificate has been approved. However, at final please list the BFE in B9 as 7.0' not 7 feet so as to match elevations in Section C.
ENGIN1 COMPLETE 06/18/2021 06/18/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2021 06/19/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN HOLD 03/15/2021 03/15/2021
Note: Held By: JEANNE MONTARULI - - jmontaruli@ci.palm-coast.fl.us Please specify what the revisions are and what departments need to review it
BADMIN COMPLETE 03/15/2021 03/15/2021
Note: Released By: JEANNE MONTARULI - - jmontaruli@ci.palm-coast.fl.us
BLD COMPLETE 03/15/2021 03/22/2021
Note: Released By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us Revision - added retaining wall. Refer to revised plans dated 3/15/21
PLFM COMPLETE 01/04/2021 01/04/2021
Note: Released By: JMYERS The construction elevation certificate has been accepted. However, on the building elevation certificate, please list the BFE in B9 as 7.0' not 7 feet.
PLFM HOLD 12/29/2020 12/29/2020
Note: Held By: JMYERS In Section A1. there needs to be a building owner's name. In Section A8. a,b,c and A9. b,c needs to be N/A not 0 if there are no flood openings. Section B1, B2, and B3 are blank, they need to be completed. In Section B8 and B9 please only list the AE zone and the 7.0' as the Base Flood Elevation. In Section C2, you need to list the Benchmark Utilized and the Vertical Datum.
ZON COMPLETE 12/29/2020 12/29/2020
Note: Released By: ELENS
BLD COMPLETE 12/14/2020 12/15/2020
Note: Released By: PBUCKLEY You are advised to upload the mullion product approval number as a revision sometime before window inspection so as not to be delayed by an inspection failure for not having it on your product aproval worksheet.
SWALE COMPLETE 12/02/2020 02/12/2021
Note: Released By: TBAKER
ZON HOLD 12/01/2020 12/01/2020
Note: Held By: ELENS Please provide rear setback on the site plan.
PLFM HOLD 12/01/2020 12/01/2020
Note: Held By: JMYERS According to the updated Site Plan, the structure will fall inside of the Special Flood Hazard Area. Elevation certificates will be required at construction, foundation, and final.
ENGIN1 COMPLETE 12/01/2020 12/02/2020
Note: Released By: TBAKER
MECH COMPLETE 12/01/2020 12/01/2020
Note: Released By: CPISCITELLI
ELEC COMPLETE 12/01/2020 12/01/2020
Note: Released By: JMUNSON
BLD HOLD 12/01/2020 12/03/2020
Note: Held By: JPI repeating comments 1. Sheet 9-S calls out 15# felt underlayment, roofing worksheet calls out 30# and the Product Approval sheet has no underlayment listed. Please cure. 2. Product approval sheet has no mullions listed and the project appears to contain them. Please cure.
BLD HOLD 11/10/2020 11/17/2020
Note: Held By: JPI 1. Sheet 9-S calls out 15# felt underlayment, roofing worksheet calls out 30# and the Product Approval sheet has no underlayment listed. Please cure. 2. Product approval sheet has no mullions listed and the project appears to contain them. Please cure.
CUSVC COMPLETE 11/10/2020 11/13/2020
Note: Released By: HHAND
ELEC HOLD 11/10/2020 11/13/2020
Note: Held By: JMUNSON Provide floor plan showing square footage of home
ENGIN1 HOLD 11/10/2020 11/11/2020
Note: Held By: TBAKER No benchmark on ssurvey
LOCATE COMPLETE 11/10/2020 11/13/2020
Note: Released By: CSTONE
MECH HOLD 11/10/2020 11/12/2020
Note: Held By: CPISCITELLI Provide floor plan showing square footage of home
PLUM COMPLETE 11/10/2020 11/17/2020
Note: Released By: JPI
SW1 COMPLETE 11/10/2020 11/17/2020
Note: Released By: KRUTH
ZON HOLD 11/10/2020 11/10/2020
Note: Held By: ELENS Site plan: Need to upload a site plan that contains: - Legal description - Setbacks to all property lines (including the setback from the A/C pad) - FEMA map panel number and flood zone - Easements - Driveway width and material (including driveway width at the garage door) - Lot dimensions and total lot area Landscape plan - 8 foundation plantings are required across the front, 4 on each side (in addition to the A/C screening), and 4 in the rear facing the public right of way. Floor plan - Not provided. Please upload a floor plan so that Zoning may complete the review. (FYI- The foundation plan garage orientation does not match the site plan and landscape plan)
PLFM HOLD 11/10/2020 11/10/2020
Note: Held By: JMYERS Please provide an updated survey and Site Plan that shows the proposed building and the Special Flood Hazard Area that resides on the lot. Should the structure or accessory machinery fall within the SFHA, 3 elevation certificates will be required. One at construction, foundation, and final.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/09/2022
SW ENG REINSPECTION 20 ¤20.00 06/09/2022
SW ENG REINSPECTION 20 ¤20.00 06/09/2022
REINSPECTION RESIDENTIAL ¤40.00 09/30/2021
REINSPECTION RESIDENTIAL ¤40.00 09/30/2021
REINSPECTION RESIDENTIAL ¤40.00 09/30/2021
CONTRACTOR CHANGE ¤40.00 09/30/2021
CONTRACTOR CHANGE ¤40.00 08/04/2021
CONTRACTOR CHANGE ¤40.00 08/04/2021
CONTRACTOR CHANGE ¤40.00 08/04/2021
REINSPECTION FEE ¤40.00 08/04/2021
REINSPECTION FEE ¤40.00 08/04/2021
STORMWATER REINSPECTION FEE ¤40.00 08/04/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 01/12/2021
SEWER CREDIT (¤1,146.12) 01/12/2021
SEWER INSPECTION ¤25.00 01/12/2021
SEWER CAPITAL FACILITY ¤4,664.55 01/12/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 01/12/2021
NEW RESIDENTIAL INSPECTIONS ¤568.00 01/12/2021
SITE PLAN 20 ¤20.00 01/12/2021
SURCHARGE FS 533.721 ¤2.00 01/12/2021
SURCHARGE - FS 468.631 ¤2.00 01/12/2021
STORM WATER PERMIT FEES ¤80.00 01/12/2021
CONNECTION FEES ¤1,017.83 01/12/2021
CONTRACTOR CHANGE ¤40.00 01/12/2021
METER - DEPOSIT ¤60.00 01/12/2021
WATER- TURN ON ¤25.00 01/12/2021
ADMIN FEE ¤20.00 01/12/2021
BUILDING DISCOUNT 100% (¤1,392.80) 01/12/2021
ELECTRIC FEE ¤230.40 01/12/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/12/2021
IMPACT FEE FIRE ¤367.00 01/12/2021
IMPACT FEE PARKS ¤1,199.12 01/12/2021
IMPACT FEE SCHOOL ¤3,600.00 01/12/2021
IMPACT FEE TRANSPORTATION ¤1,674.00 01/12/2021
MECHANICAL FEE ¤230.40 01/12/2021
WATER -IRRIGATION INSPECTION ¤25.00 01/12/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/12/2021
PLAN CHECK FEE ¤113.60 01/12/2021
PLUMBING FEE ¤230.40 01/12/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,462.63