I want to search for...
Permit #2020110550
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00420-0030 |
| CONDITIONED SPACE: 2722 sqft |
| GARAGE: 467 sqft |
| OPENED PORCH (WITH ROOF) : 397 sqft |
| OPENED PORCH (WITH ROOF) : 275 sqft |
| Total Square Footage: 3861 sqft |
| Block: 00420 |
| Subdivision: 2214 - SECTION 19-WYNNFIELD |
| Job Phone: (386)445-9393 |
| Location Address: 8 WALNUT PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/05/2021 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: PIRRO SANIYE TRUSTEE |
|
Address PO BOX 350525 PALM COAST, FL 32135 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/18/2022 | FINAL APPROVED | MKRASKI |
| U -UTILITY RESIDENTIAL FINAL | 10/18/2022 | FINAL APPROVED | LFITZGERALD |
| Note: 10/14/2022 - PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 10/14/2022 | CANCELLED BY APPLICANT | DHANEY |
| BLD - BUILDING FINAL | 10/14/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No hot water in home 2. low voltage wiring coming out by meter can needs to be sealed 3. No numbers on home | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/13/2022 | APPROVED | GBERTOLA |
| Note: 10/13/22= correction were made ......................................................................................................................................................................................................... | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/13/2022 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 10/13/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 10/13/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/03/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 10/03/22= no changes on the finel survey The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. ......................................................................................................................................................................................................... The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. CHECK FINAL SURVEY FOR DETAIL | |||
| U-CROSS CONNECTION | 09/07/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/02/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. CHECK FINAL SURVEY FOR DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 04/22/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ELECTRIC - EARLY POWER | 04/14/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: 1. Dw outlet can not be behind dw need to move by final. NEC 2017 422.16 2. Emailed FPL at 9:38 am | |||
| GRAVITY SEWER TEST | 12/17/2021 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 12/17/2021 | APPROVED | MGIBSON |
| INSULATION | 10/05/2021 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 09/30/2021 | APPROVED | KSANDOE |
| ALL ROUGH | 09/27/2021 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 09/24/2021 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/17/2021 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 04/13/2021 | APPROVED | BGREVE |
| FOUND SURVEY APPROVED (OFFICE) | 03/19/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/26/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/19/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 01/27/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/18/2021 | 03/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | COMPLETE | 03/18/2021 | 03/18/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/30/2020 | 12/30/2020 |
| Note: Released By: ELENS | |||
| ZON | HOLD | 12/29/2020 | 12/29/2020 |
| Note: Held By: ELENS Please provide the original termination of easements agreement for recording. | |||
| ZON | HOLD | 12/21/2020 | 12/22/2020 |
| Note: Held By: AMOBLEY Emailed termination of easement agreement. Once received we can release permit. | |||
| ZON | HOLD | 12/16/2020 | 12/17/2020 |
| Note: Held By: AMOBLEY This is in a trust so we will need a copy of the trust to make sure the termination paperwork is worded correctly. We have paperwork and will have to create the termination agreement for owner to sign. Please specify types of trees that are being planted for review Additional shrub required on each side to total four shrubs along each side | |||
| BLD | COMPLETE | 12/16/2020 | 12/19/2020 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 12/16/2020 | 12/19/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 11/16/2020 | 02/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| BLD | HOLD | 11/13/2020 | 11/23/2020 |
| Note: Held By: JPI 1. Lintels not on Product Approval list | |||
| CUSVC | COMPLETE | 11/13/2020 | 11/23/2020 |
| Note: Released By: HHAND Original fees were paid in 2006. Builder must pay the current years rates less the rates that were already paid. | |||
| ELEC | COMPLETE | 11/13/2020 | 11/17/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 11/13/2020 | 11/16/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 11/13/2020 | 11/17/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 11/13/2020 | 11/16/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 11/13/2020 | 11/23/2020 |
| Note: Held By: JPI 1. No plumbing isometric attached | |||
| SW1 | COMPLETE | 11/13/2020 | 11/17/2020 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 11/13/2020 | 11/17/2020 |
| Note: Held By: AMOBLEY Please provide the termination of easement application with the 3 utility letters releasing the easement. Once we receive those we will create the agreement and send to City Utilities to release the easement as well. Please provide a full landscape plan showing all the required trees. Should be 11 total with at least 2 of them being shade trees. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 01/05/2021 |
| METER - DEPOSIT | (¤60.00) | 01/05/2021 |
| WATER- TURN ON | ¤25.00 | 01/05/2021 |
| WATER- TURN ON | (¤25.00) | 01/05/2021 |
| ADMIN FEE | ¤20.00 | 01/05/2021 |
| CONNECTION FEES | ¤1,017.83 | 01/05/2021 |
| CONNECTION FEES | (¤750.00) | 01/05/2021 |
| BUILDING DISCOUNT 100% | (¤1,665.80) | 01/05/2021 |
| ELECTRIC FEE | ¤269.40 | 01/05/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/05/2021 |
| IMPACT FEE FIRE | ¤367.00 | 01/05/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/05/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/05/2021 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 01/05/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 01/05/2021 |
| MECHANICAL FEE | ¤269.40 | 01/05/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/05/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/05/2021 |
| PLAN CHECK FEE | ¤139.60 | 01/05/2021 |
| PLUMBING FEE | ¤269.40 | 01/05/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤698.00 | 01/05/2021 |
| SITE PLAN 20 | ¤20.00 | 01/05/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/05/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/05/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/05/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 01/05/2021 |
| SEWER INSPECTION | ¤25.00 | 01/05/2021 |
| SEWER INSPECTION | (¤25.00) | 01/05/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 01/05/2021 |
| SEWER CAPITAL FACILITY | (¤417.00) | 01/05/2021 |
| WATER CAPITAL FACILITY FEE | (¤2,160.00) | 01/05/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 01/05/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,687.25 |