I want to search for...

Permit #2020110550

Permit Details

Status: COED

Parcel Id: 07-11-31-7019-00420-0030
CONDITIONED SPACE: 2722 sqft
GARAGE: 467 sqft
OPENED PORCH (WITH ROOF) : 397 sqft
OPENED PORCH (WITH ROOF) : 275 sqft
Total Square Footage: 3861 sqft
Block: 00420
Subdivision: 2214 - SECTION 19-WYNNFIELD
Job Phone: (386)445-9393
Location Address: 8 WALNUT PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/05/2021
NOC: RECORDED
Applicant name: ANTONIO JR AMARAL
Owner: PIRRO SANIYE TRUSTEE

Address

PO BOX 350525

PALM COAST, FL 32135

Lot: 0030
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL HOMES & POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

13 Utility Drive

PALM COAST, FL 32137

CBC058062 (Exp: 08/31/2026) (386)445-9393

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/18/2022 FINAL APPROVED MKRASKI
U -UTILITY RESIDENTIAL FINAL 10/18/2022 FINAL APPROVED LFITZGERALD
Note: 10/14/2022 - PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 10/14/2022 CANCELLED BY APPLICANT DHANEY
BLD - BUILDING FINAL 10/14/2022 Disapproved - NO FEE MKRASKI
Note: 1. No hot water in home 2. low voltage wiring coming out by meter can needs to be sealed 3. No numbers on home
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/13/2022 APPROVED GBERTOLA
Note: 10/13/22= correction were made .........................................................................................................................................................................................................
ROW FIELD SURVEY /GRADING CERTIFICATION 10/13/2022 APPROVED GBERTOLA
ROW - STORMWATER FINAL 10/13/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 10/13/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/03/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/03/22= no changes on the finel survey The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. ......................................................................................................................................................................................................... The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. CHECK FINAL SURVEY FOR DETAIL
U-CROSS CONNECTION 09/07/2022 APPROVED - AS NOTED LFITZGERALD
Note: well irrigation-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/02/2022 Disapproved - NO FEE GBERTOLA
Note: The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. CHECK FINAL SURVEY FOR DETAIL
ROW- PRE-APRON (PRE-POUR) 04/22/2022 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ELECTRIC - EARLY POWER 04/14/2022 APPROVED - AS NOTED JMUNSON
Note: 1. Dw outlet can not be behind dw need to move by final. NEC 2017 422.16 2. Emailed FPL at 9:38 am
GRAVITY SEWER TEST 12/17/2021 APPROVED MGIBSON
U - SEWER TIE IN 12/17/2021 APPROVED MGIBSON
INSULATION 10/05/2021 APPROVED KSANDOE
LATH/BRICK/ WATER BARRIER 09/30/2021 APPROVED KSANDOE
ALL ROUGH 09/27/2021 APPROVED KSANDOE
ROOF VALLEY & METAL 09/24/2021 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/17/2021 APPROVED FWILLIS
TIE BEAM / LINTEL 04/13/2021 APPROVED BGREVE
FOUND SURVEY APPROVED (OFFICE) 03/19/2021 APPROVED TBAKER
MONOLITHIC SLAB 02/26/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 02/19/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 01/27/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/18/2021 03/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON COMPLETE 03/18/2021 03/18/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 12/30/2020 12/30/2020
Note: Released By: ELENS
ZON HOLD 12/29/2020 12/29/2020
Note: Held By: ELENS Please provide the original termination of easements agreement for recording.
ZON HOLD 12/21/2020 12/22/2020
Note: Held By: AMOBLEY Emailed termination of easement agreement. Once received we can release permit.
ZON HOLD 12/16/2020 12/17/2020
Note: Held By: AMOBLEY This is in a trust so we will need a copy of the trust to make sure the termination paperwork is worded correctly. We have paperwork and will have to create the termination agreement for owner to sign. Please specify types of trees that are being planted for review Additional shrub required on each side to total four shrubs along each side
BLD COMPLETE 12/16/2020 12/19/2020
Note: Released By: JPI
PLUM COMPLETE 12/16/2020 12/19/2020
Note: Released By: JPI
SWALE COMPLETE 11/16/2020 02/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
BLD HOLD 11/13/2020 11/23/2020
Note: Held By: JPI 1. Lintels not on Product Approval list
CUSVC COMPLETE 11/13/2020 11/23/2020
Note: Released By: HHAND Original fees were paid in 2006. Builder must pay the current years rates less the rates that were already paid.
ELEC COMPLETE 11/13/2020 11/17/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 11/13/2020 11/16/2020
Note: Released By: TBAKER
LOCATE COMPLETE 11/13/2020 11/17/2020
Note: Released By: CSTONE
MECH COMPLETE 11/13/2020 11/16/2020
Note: Released By: CPISCITELLI
PLUM HOLD 11/13/2020 11/23/2020
Note: Held By: JPI 1. No plumbing isometric attached
SW1 COMPLETE 11/13/2020 11/17/2020
Note: Released By: KRUTH
ZON HOLD 11/13/2020 11/17/2020
Note: Held By: AMOBLEY Please provide the termination of easement application with the 3 utility letters releasing the easement. Once we receive those we will create the agreement and send to City Utilities to release the easement as well. Please provide a full landscape plan showing all the required trees. Should be 11 total with at least 2 of them being shade trees.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 01/05/2021
METER - DEPOSIT (¤60.00) 01/05/2021
WATER- TURN ON ¤25.00 01/05/2021
WATER- TURN ON (¤25.00) 01/05/2021
ADMIN FEE ¤20.00 01/05/2021
CONNECTION FEES ¤1,017.83 01/05/2021
CONNECTION FEES (¤750.00) 01/05/2021
BUILDING DISCOUNT 100% (¤1,665.80) 01/05/2021
ELECTRIC FEE ¤269.40 01/05/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/05/2021
IMPACT FEE FIRE ¤367.00 01/05/2021
IMPACT FEE PARKS ¤1,199.12 01/05/2021
IMPACT FEE SCHOOL ¤3,600.00 01/05/2021
RECORDING FEE REIMBURSE DOC ¤35.50 01/05/2021
IMPACT FEE TRANSPORTATION ¤1,674.00 01/05/2021
MECHANICAL FEE ¤269.40 01/05/2021
WATER -IRRIGATION INSPECTION ¤25.00 01/05/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/05/2021
PLAN CHECK FEE ¤139.60 01/05/2021
PLUMBING FEE ¤269.40 01/05/2021
NEW RESIDENTIAL INSPECTIONS ¤698.00 01/05/2021
SITE PLAN 20 ¤20.00 01/05/2021
SURCHARGE FS 533.721 ¤2.00 01/05/2021
SURCHARGE - FS 468.631 ¤2.00 01/05/2021
STORM WATER PERMIT FEES ¤80.00 01/05/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 01/05/2021
SEWER INSPECTION ¤25.00 01/05/2021
SEWER INSPECTION (¤25.00) 01/05/2021
SEWER CAPITAL FACILITY ¤4,664.55 01/05/2021
SEWER CAPITAL FACILITY (¤417.00) 01/05/2021
WATER CAPITAL FACILITY FEE (¤2,160.00) 01/05/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 01/05/2021
Fees Total Due: ¤0.00 Total Paid: ¤12,687.25