Permit #2020110816
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7028-00740-0360 |
| GARAGE: 450 sqft |
| Total Square Footage: 450 sqft |
| Block: 00740 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-547-8383 |
| Location Address: 9 POINBURY DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 11/30/2020 |
| NOC: RECORDED |
| Applicant name: MICHAEL P CANNON |
| Owner: SILVA, ROBERTO S & ISABEL SILVA |
|
Address JTWROS PALM COAST, FL 32164 |
|
Address 9 POINBURY DRIVE PALM COAST, FL 32164 |
| Lot: 0360 |
| Contracted Stated Job Value: ¤57,000.00 |
| Job Description: ATTACHED GARAGE |
| Type: CN |
Contractor
CANNON HOME SERVICES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
39 PUTTER DR PALM COAST, FL 32164 |
CBC1259826 (Exp: 08/31/2026) | 386-547-8383 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/08/2021 | FINAL APPROVED | JWALKER |
| U -UTILITY RESIDENTIAL FINAL | 06/08/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 06/03/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 06/03/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 04/28/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION 1)Upper driveway need to shave down minimum requirements is 4 inch Land Development Code Technical Manual, Section 900.04 (A) 2)Repair the wash out on the pour area. 3)Remove the water at the end of the pipe A minimum footer of six (6) inches by six (6) is required under each culvert end, not to extend past the end of the MES. (A) Land Development Code Technical Manual, Drawing 300.E Section A-A 4)Colvert pipe elevation is good 04/28/2021=AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW - FINAL INSPECTION | 04/27/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: IT'S A WRONG INSPECTION THEY NEED A PRE POUR NO THE ROW FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | 04/27/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: 1)Upper driveway need to shave down minimum requirements is 4 inch Land Development Code Technical Manual, Section 900.04 (A) 2)Repair the wash out on the pour area. 3)Remove the water at the end of the pipe A minimum footer of six (6) inches by six (6) is required under each culvert end, not to extend past the end of the MES. (A) Land Development Code Technical Manual, Drawing 300.E Section A-A 4)Colvert pipe elevation is good | |||
| ALL ROUGH | 03/17/2021 | APPROVED | MMESSER |
| LATH/BRICK/ WATER BARRIER | 03/17/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/05/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 02/02/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/21/2021 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 01/07/2021 | APPROVED | MMESSER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/01/2021 | 02/02/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/01/2021 | 02/01/2021 |
| Note: Released By: TDOAK | |||
| SWALE | COMPLETE | 11/20/2020 | 02/25/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| BLD | COMPLETE | 11/19/2020 | 11/30/2020 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 11/19/2020 | 11/20/2020 |
| Note: Released By: JMUNSON | |||
| SW1 | COMPLETE | 11/19/2020 | 11/19/2020 |
| Note: Released By: KRUTH | |||
| ZON | COMPLETE | 11/19/2020 | 11/20/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 11/19/2020 | 11/23/2020 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 11/30/2020 |
| BUILDING DISCOUNT 100% | (¤382.20) | 11/30/2020 |
| ELECTRIC FEE | ¤94.20 | 11/30/2020 |
| PLAN CHECK FEE | ¤40.00 | 11/30/2020 |
| REMODEL/ADDITION/ACCES INSPECT | ¤228.00 | 11/30/2020 |
| SITE PLAN 20 | ¤20.00 | 11/30/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/30/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/30/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/30/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤104.00 |