Permit #2020111118

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00510-0340
CONDITIONED SPACE: 1265 sqft
CONDITIONED SPACE: 1265 sqft
GARAGE: 475 sqft
GARAGE: 475 sqft
OPENED PORCH (WITH ROOF) : 158 sqft
OPENED PORCH (WITH ROOF) : 158 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
Total Square Footage: 3912 sqft
Block: 00510
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 386-585-2654
Location Address: 18 PROSPERITY LN
Type: DU - DUPLEX
Issue Date: 04/19/2021
NOC: RECORDED
Applicant name: DESIDERIO CARLOS CARREIRO
Owner: VISONE JOSEPH

Address

1732 AVIATION BLVD #304

REDONDO BEACH, CA 90278

Lot: 0340
Contracted Stated Job Value: ¤200,000.00
Job Description: DUPLEX
Type: CN

Contractor

RED LINE CONSTRUCTION CO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DESIDERIO CARLOS CARREIRO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/24/2022 Disapproved - NO FEE KSANDOE
Note: Provide access for inspection. House is locked. FBC 110.1
BLD - BUILDING FINAL 06/24/2022 FINAL APPROVED KSANDOE
U -UTILITY RESIDENTIAL FINAL 06/24/2022 APPROVED - AS NOTED LFITZGERALD
Note: in future if sewer clean out cap is in close proximity to driveway plase incorperate into the concrete so as to act like a collar(2ft square) to protect from damage from car travelling over(AND if in concrete use a brass cap)
U-CROSS CONNECTION 06/23/2022 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW - FINAL APRON (AFTER POUR) 06/23/2022 APPROVED RGROSS
U - SEWER TIE IN 06/23/2022 APPROVED MGIBSON
ROW - FINAL INSPECTION 06/23/2022 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 06/22/2022 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 06/22/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet.
FINAL SURVEY (OFFICE USE ONLY) 05/26/2022 Disapproved - NO FEE GBERTOLA
Note: The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet.
ROW- PRE-APRON (PRE-POUR) 05/05/2022 APPROVED - AS NOTED GBERTOLA
Note: 05/05/22=correction were made AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. CULVERTS PIPES CULVERT PIPE IS OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – CULVERTS PIPES BOTH OUT OF THE TOLERANCE . PLEASE RESET THE PIPE ACCORDING SWALE PLAN A.Land Development Code Technical Manual, Drawing 300.C (1) –Niether CULVERTS PIPES ARE 8 FT FROM THE EDGE OF THE ROAD CHECK THAT THE PIPE CENTER IS 8 FT FROM ROAD EDGE. A.Land Development Code Technical Manual, Drawing 300.C (2)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)
ROW- PRE-APRON (PRE-POUR) 05/03/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: CULVERTS PIPES CULVERT PIPE IS OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – CULVERTS PIPES BOTH OUT OF THE TOLERANCE . PLEASE RESET THE PIPE ACCORDING SWALE PLAN A.Land Development Code Technical Manual, Drawing 300.C (1) –Niether CULVERTS PIPES ARE 8 FT FROM THE EDGE OF THE ROAD CHECK THAT THE PIPE CENTER IS 8 FT FROM ROAD EDGE. A.Land Development Code Technical Manual, Drawing 300.C (2)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)
ROW- PRE-APRON (PRE-POUR) 04/29/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: CULVERTS PIPES BOTH OUT OF THE TOLERANCE . PLEASE RESET THE PIPE ACCORDING SWALE PLAN A.Land Development Code Technical Manual, Drawing 300.C (1) –Niether CULVERTS PIPES ARE 8 FT FROM THE EDGE OF THE ROAD CHECK THAT THE PIPE CENTER IS 8 FT FROM ROAD EDGE. A.Land Development Code Technical Manual, Drawing 300.C (2)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)
GRAVITY SEWER TEST 04/14/2022 APPROVED KSANDOE
ELECTRIC - EARLY POWER 04/13/2022 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @1037. Release power
INSULATION 01/19/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION Notes from All Rough 5ft head unit B Failed. Bathroom exhaust fan ducting needs to be taped at the fan, not zip tied. Both units Interior electrical panel must be installed. Unit B. 1/14/22 - Annular hole for washer drain vent needs to be sealed with fire foam. Oulet and water supply holes in walls need to be filled with gap foam in both units
LATH/BRICK/ WATER BARRIER 01/14/2022 APPROVED KSANDOE
INSULATION 01/14/2022 Disapproved - NO FEE KSANDOE
Note: Notes from All Rough 5ft head unit B Failed. Bathroom exhaust fan ducting needs to be taped at the fan, not zip tied. Both units Interior electrical panel must be installed. Unit B. 1/14/22 - Annular hole for washer drain vent needs to be sealed with fire foam. Oulet and water supply holes in walls need to be filled with gap foam in both units
ALL ROUGH 01/03/2022 APPROVED - AS NOTED KSANDOE
Note: 5ft head unit B Failed. Bathroom exhaust fan ducting needs to be taped at the fan, not zip tied. Both units Interior electrical panel must be installed. Unit B.
ALL ROUGH 12/28/2021 CANCELLED BY APPLICANT WEB
FIREWALL FINAL 12/02/2021 APPROVED RMARTIN
FIREWALL DRYWALL NAILING 11/10/2021 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/05/2021 APPROVED KSANDOE
ROOF VALLEY & METAL 11/05/2021 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 11/04/2021 APPROVED TBAKER
TIE BEAM / LINTEL 10/07/2021 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 09/08/2021 APPROVED CSTONE
MONOLITHIC SLAB 08/17/2021 APPROVED JPI
PLUMBING 1ST ROUGH UNDERGROUND 07/27/2021 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/03/2021 11/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/03/2021 11/03/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 12/08/2020 12/15/2020
Note: Released By: FREODICA
MECH COMPLETE 12/08/2020 12/08/2020
Note: Released By: CPISCITELLI
BLD HOLD 12/07/2020 12/07/2020
Note: Held By: PBUCKLEY Removed comments regarding no penetration in roof within four feet of party wall and advisory comment indiating penetrations through party wall must follow NFPA 12.96.6 Please respond to the remaining comment below. 1. Product Approval list missing Mullions and underlayment
SW1 COMPLETE 12/02/2020 12/02/2020
Note: Released By: GBERTOLA
SWALE COMPLETE 12/01/2020 03/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON COMPLETE 11/30/2020 12/01/2020
Note: Released By: ELENS
BLD HOLD 11/30/2020 12/04/2020
Note: Held By: JPI 1. Product Approval list missing Mullions and underlayment 2. Need note regarding no penetration of in roof within 4 feet of party wall FBC 706.6.3 3. All penetrations through party wall must follow NFPA 12.96.6
CUSVC COMPLETE 11/30/2020 12/02/2020
Note: Released By: HHAND
ELEC COMPLETE 11/30/2020 12/01/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 11/30/2020 12/01/2020
Note: Released By: TBAKER
LOCATE COMPLETE 11/30/2020 12/02/2020
Note: Released By: CSTONE
MECH HOLD 11/30/2020 12/01/2020
Note: Held By: CPISCITELLI Energy Calcs need to be signed by the builder
PLUM COMPLETE 11/30/2020 12/04/2020
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 06/24/2022
SW ENG REINSPECTION 30 ¤30.00 06/24/2022
STORM WATER PERMIT FEES ¤80.00 04/19/2021
3% TRANS IMPACT FEE CREDIT (¤77.94) 04/19/2021
SEWER CREDIT (¤2,016.00) 04/19/2021
SEWER INSPECTION ¤25.00 04/19/2021
SEWER CAPITAL FACILITY ¤9,329.10 04/19/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 04/19/2021
METER - DEPOSIT ¤120.00 04/19/2021
WATER- TURN ON ¤50.00 04/19/2021
ADMIN FEE ¤20.00 04/19/2021
BUILDING DISCOUNT 100% (¤1,619.60) 04/19/2021
ELECTRIC FEE ¤262.80 04/19/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 04/19/2021
IMPACT FEE SCHOOL ¤7,200.00 04/19/2021
IMPACT FEE TRANSPORTATION ¤2,598.00 04/19/2021
MECHANICAL FEE ¤262.80 04/19/2021
WATER -IRRIGATION INSPECTION ¤50.00 04/19/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 04/19/2021
PLAN CHECK FEE ¤135.20 04/19/2021
PLUMBING FEE ¤262.80 04/19/2021
NEW RESIDENTIAL INSPECTIONS ¤676.00 04/19/2021
SITE PLAN 20 ¤20.00 04/19/2021
SURCHARGE FS 533.721 ¤2.00 04/19/2021
SURCHARGE - FS 468.631 ¤2.00 04/19/2021
IMPACT FEE PARKS ¤2,398.24 04/08/2021
IMPACT FEE FIRE ¤734.00 02/24/2021
CONNECTION FEES ¤2,035.66 02/24/2021
Fees Total Due: ¤0.00 Total Paid: ¤29,364.99