Permit #2020120047
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00550-0470 |
| CONDITIONED SPACE: 1280 sqft |
| CONDITIONED SPACE: 1280 sqft |
| GARAGE: 250 sqft |
| GARAGE: 250 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 3420 sqft |
| Block: 00550 |
| Subdivision: 2169 - SECTION 65-KANKAKEE RUN |
| Job Phone: 386-447-7007 |
| Location Address: 4 KARLSTAD PL |
| Type: DU - DUPLEX |
| Issue Date: 02/02/2021 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: LAGARE LAND TRUST |
|
Address 29 LAGARE ST PALM COAST, FL 32137 |
| Lot: 0470 |
| Contracted Stated Job Value: ¤312,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/30/2022 | FINAL APPROVED | TSTAUFFACHER |
| ROW - FINAL APRON (AFTER POUR) | 03/30/2022 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 03/30/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 03/29/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 3/29/22 looks good at time of inspection Need have seed and straw or pine straw on all bare areas of vacant lot ot left of home | |||
| ROW - FINAL INSPECTION | 03/25/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: Need have seed and straw or pine straw on all bare areas of vacant lot ot left of home | |||
| U-CROSS CONNECTION | 03/25/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/24/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Need to inverts of culverts on final survey Need to make elevations darker to be able to read better | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/21/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: Need to inverts of culverts on final survey Need to make elevations darker to be able to read better | |||
| ROW- PRE-APRON (PRE-POUR) | 02/09/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THIS IS A REINSPECTION New Pre pour created by Inspector from Canceled by Inspector on 10/13/21. 2/4/22 - Right side not completely formed yet. 2/9/22 - its the builders reposiblity to check pipe elev. befor pouring concrete | |||
| ROW- PRE-APRON (PRE-POUR) | 02/04/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: New Pre pour created by Inspector from Canceled by Inspector on 10/13/21. 2/4/22 - Right side not completely formed yet. | |||
| ELECTRIC - EARLY POWER | 10/21/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Main breakers need to labeled A and B 2. Everything needs to be safed off 10/20/21 Main breakers have to be labeled A and B must be visible or FPL will not set meters. 10/21/21 Emailed FPL at 8:15 am | |||
| ELECTRIC - EARLY POWER | 10/20/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: THIS IS A REINSPECTION 1. Main breakers need to labeled A and B 2. Everything needs to be safed off 10/20/21 Main breakers have to be labeled A and B must be visible or FPL will not set meters. | |||
| ELECTRIC - EARLY POWER | 10/18/2021 | Disapproved - NO FEE | JMUNSON |
| Note: 1. Main breakers need to labeled A and B 2. Everything needs to be safed off | |||
| ROW- PRE-APRON (PRE-POUR) | 10/13/2021 | CANCELLED BY INSPECTOR | RGROSS |
| Note: NOTE: Builder just wanted to have inspector evaluation of the culvert set on site. Left side needs 22* Elbow. Right side straight pipe. NOTE TO BUILDER: Neither mitered end should go over the property line. | |||
| U - SEWER TIE IN | 09/29/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/29/2021 | APPROVED | MGIBSON |
| INSULATION | 08/30/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Inspector note: check door screw pattern, doors were back ordered at time of all rough. 08/25/2021:: No depth markers installed Add cardboard stop at ceiling height cahnges between volume ceiling and flat ceilings | |||
| FIREWALL FINAL | 08/27/2021 | APPROVED | TSTAUFFACHER |
| INSULATION | 08/25/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Inspector note: check door screw pattern, doors were back ordered at time of all rough. 08/25/2021:: No depth markers installed Add cardboard stop at ceiling height cahnges between volume ceiling and flat ceilings | |||
| PEP TANK INSTALLATION REQUEST | 08/06/2021 | APPROVED - AS NOTED | CSTONE |
| ALL ROUGH | 07/28/2021 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 07/28/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 06/25/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Work not done. No drip edge etc. | |||
| ROOF VALLEY & METAL | 06/15/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Work not done. No drip edge etc. | |||
| COLUMN POST/BEAM/TIE DOWN CONNECTOR | 06/08/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/07/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Roof sheathing, wall sheathing and fill cells approved OKAY TO DRY IN HOME Failure// Trusses T-10, T-11, and T-15 need 1 additional MTS 24 strap added at mid point location according to plans. The plans are highlighted to show location. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/04/2021 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: Roof sheathing, wall sheathing and fill cells approved OKAY TO DRY IN HOME Failure// Trusses T-10, T-11, and T-15 need 1 additional MTS 24 strap added at mid point location according to plans. The plans are highlighted to show location. | |||
| TIE BEAM / LINTEL | 05/10/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 04/09/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/25/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… (6TH EDITION) R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) | |||
| MONOLITHIC SLAB | 03/16/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… (6TH EDITION) R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/08/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/03/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/23/2022 | 03/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 11/03/2021 | 11/03/2021 |
| Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM THE BLOWER DOOR TEST HAS TO BE THE 2020 AND 7 EDITION NOT 2017 GO TO OUR WEBSITE AND GET THE UPDATED BLOWER DOOR TEST | |||
| BADMIN | COMPLETE | 11/03/2021 | 11/03/2021 |
| Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/08/2021 | 04/08/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/08/2021 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/11/2021 | 01/11/2021 |
| Note: Released By: GBERTOLA | |||
| SW1 | HOLD | 12/29/2020 | 12/29/2020 |
| Note: Held By: GBERTOLA All drainage and topographical features must be clearly depicted including easements and top of bank locations. (G | |||
| BLD | COMPLETE | 12/22/2020 | 01/03/2021 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 12/22/2020 | 12/22/2020 |
| Note: Released By: CPISCITELLI | |||
| ELEC | COMPLETE | 12/22/2020 | 12/22/2020 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 12/22/2020 | 12/22/2020 |
| Note: Released By: ELENS | |||
| SW1 | HOLD | 12/04/2020 | 12/04/2020 |
| Note: Held By: GBERTOLA The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. (A) A.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(5) E.Florida Building Code, Residential, Chapter 4, R401.3F. Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) R404.1.6E.Florida Building Code, Residential, Chapter 4, R401.3 When not feasible a 5% slope shall be provided to an approved drainage feature. (F) 3F.Florida Building Code, Building, Chapter 18, 1804.4 The Lot Grading Plan must identify how any low spots on the property (including property lines) are drained. (J) J.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(8-10) NEED MORE ELEVATION AROUND THE BACK AREA | |||
| ZON | HOLD | 12/03/2020 | 12/03/2020 |
| Note: Held By: ELENS Held By: ELENS The minimum driveway width is 16 feet. The site plan needs to contain the following information: - Driveway width and material - FEMA Map panel number and flood zone - Legal Description (Please note that the legal description on the survey is missing the Section number.) - Please provide the setback from the driveway on the left to the side property line. (It cannot encroach in the easement.) - Setback to rear property line | |||
| SWALE | COMPLETE | 12/02/2020 | 03/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| BLD | HOLD | 12/01/2020 | 12/04/2020 |
| Note: Held By: JPI 1. Amend plans to depict CO detector in vicinity of master bedrooms 2. Add a detail/ drawing with notes regarding party wall. Presume to be on missing sheet 5 | |||
| CUSVC | COMPLETE | 12/01/2020 | 12/02/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 12/01/2020 | 12/03/2020 |
| Note: Held By: JMUNSON Need to combo smoke alarm outside of back bedroom. FBC 2017 314.3 315.1 | |||
| ENGIN1 | COMPLETE | 12/01/2020 | 12/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/01/2020 | 12/02/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 12/01/2020 | 12/02/2020 |
| Note: Held By: CPISCITELLI Energy Calc needs to be signed by the builder | |||
| PLUM | COMPLETE | 12/01/2020 | 12/04/2020 |
| Note: Released By: JPI |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/30/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/07/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/02/2021 |
| REINSPECTION FEE | ¤40.00 | 11/02/2021 |
| REINSPECTION FEE | ¤40.00 | 11/02/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤638.00 | 02/02/2021 |
| SITE PLAN 20 | ¤20.00 | 02/02/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/02/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/02/2021 |
| CONNECTION FEES | ¤2,035.66 | 02/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 02/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 02/02/2021 |
| BUILDING DISCOUNT 100% | (¤1,539.80) | 02/02/2021 |
| ELECTRIC FEE | ¤251.40 | 02/02/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 02/02/2021 |
| IMPACT FEE FIRE | ¤734.00 | 02/02/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 02/02/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 02/02/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,598.00 | 02/02/2021 |
| MECHANICAL FEE | ¤251.40 | 02/02/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 02/02/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 02/02/2021 |
| PLAN CHECK FEE | ¤127.60 | 02/02/2021 |
| PLUMBING FEE | ¤251.40 | 02/02/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/02/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤77.94) | 02/02/2021 |
| SEWER CREDIT | (¤2,016.00) | 02/02/2021 |
| SEWER INSPECTION | ¤25.00 | 02/02/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 02/02/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 02/02/2021 |
| METER - DEPOSIT | ¤120.00 | 02/02/2021 |
| WATER- TURN ON | ¤50.00 | 02/02/2021 |
| ADMIN FEE | ¤20.00 | 02/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,594.99 |