I want to search for...
Permit #2020120294
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-1370 |
| CONDITIONED SPACE: 3042 sqft |
| GARAGE: 833 sqft |
| OPENED PORCH (WITH ROOF) : 449 sqft |
| OPENED PORCH (WITH ROOF) : 84 sqft |
| GARAGE: 170 sqft |
| Total Square Footage: 4578 sqft |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 173 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/22/2020 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: CISTRELLI, ROBER & PEGGY |
|
Address 53 RIVERS EDGE LANE PALM COAST, FL 32137 |
| Lot: 137 |
| Contracted Stated Job Value: ¤514,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
THELMA JOANNA SAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
8222 S. ORANGE AVE CRESCENT CITY, FL 32112 |
LQ24872 (Exp: 09/16/2027) | 407-855-1903 |
DONALD R DILLARD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
411 6TH ST HOLLY HILL, FL 32117 |
01612 (Exp: 05/19/2016) | 386-252-5555 | 386-255-6657 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 05/05/2022 | APPROVED | MGIBSON |
| BLD - BUILDING FINAL | 05/05/2022 | FINAL APPROVED | LMILLER |
| U-CROSS CONNECTION | 05/05/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: re-use irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/05/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 05/04/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: LOOKS GOOD AT TIME OF INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 05/04/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/04/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 05/04/2022 | APPROVED | PFLANAGAN |
| GAS ROUGH | 04/18/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ANOTHER INSPECTION WILL NEED TO WHEN TANK IS SET AND RAN TO THE HOUSE | |||
| ROW- PRE-APRON (PRE-POUR) | 02/22/2022 | APPROVED | RGROSS |
| ROW - DRAINAGE | 02/22/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Please reestablish Silt fence | |||
| ROW- PAVER RESTRAINTS | 02/14/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: Ready to pour concrete for paver restraints Please repair curbing in front of driveway Recommend you fix and repair reclaim water line | |||
| ROW - DRAINAGE | 02/14/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: Please reestablish Silt fence next inspection on 2/22/22 | |||
| ELECTRIC - EARLY POWER | 09/28/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 11:04 am | |||
| WINDOW NAILING | 09/13/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need installation documents on site for arched window to check fasteners 9/10/21 STILL NEED DOCUMENTS ON SITE | |||
| WINDOW NAILING | 09/10/2021 | Disapproved - NO FEE | RMARTIN |
| Note: THIS IS A REINSPECTION need installation documents on site for arched window to check fasteners 9/10/21 STILL NEED DOCUMENTS ON SITE | |||
| LATH/BRICK/ WATER BARRIER | 08/27/2021 | APPROVED | WMILLER |
| WINDOW NAILING | 08/24/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: need installation documents on site for arched window to check fasteners | |||
| U - SEWER TIE IN | 07/22/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: APPROVED 7/21/21 | |||
| GRAVITY SEWER TEST | 07/22/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED 7/21/21 | |||
| INSULATION | 07/12/2021 | APPROVED | WMILLER |
| GAS ROUGH | 07/09/2021 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION ANOTHER INSPECTION WILL NEED TO WHEN TANK IS SET AND RAN TO THE HOUSE | |||
| ALL ROUGH | 07/09/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION box in range vent from prior inspection box plumbing out at garage area from prior inspection seal off all window and door openings to keep water out. told contractor the windows and doors uinder covered lania area could be sealed off with plastic to allow some light into house THIS IS A REINSPECTION 1. NAIL PLATES FOR PLUMBING P2603.2.1 (top plates in baths) 2. box out around range vent 3, plumbing out of wall (bearing wall close to garage) 4. windows and doors need to be installed by all-rough or openings properly boarded and sealed. 5. FIREBLOCKING MATERIALS R302.11.1 (1-8) 6. roof needs to be complete by all-rough 7-8-21... FIREBLOCKING MATERIALS R302.11.1 (1-8) Range hood Minimum nthickness not met | |||
| ALL ROUGH | 07/08/2021 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION box in range vent from prior inspection box plumbing out at garage area from prior inspection seal off all window and door openings to keep water out. told contractor the windows and doors uinder covered lania area could be sealed off with plastic to allow some light into house THIS IS A REINSPECTION 1. NAIL PLATES FOR PLUMBING P2603.2.1 (top plates in baths) 2. box out around range vent 3, plumbing out of wall (bearing wall close to garage) 4. windows and doors need to be installed by all-rough or openings properly boarded and sealed. 5. FIREBLOCKING MATERIALS R302.11.1 (1-8) 6. roof needs to be complete by all-rough 7-8-21... FIREBLOCKING MATERIALS R302.11.1 (1-8) Range hood Minimum nthickness not met | |||
| GAS ROUGH | 07/08/2021 | CANCELLED BY APPLICANT | JGIBSON |
| ALL ROUGH | 06/18/2021 | Disapproved - NO FEE | BGREVE |
| Note: box in range vent from prior inspection box plumbing out at garage area from prior inspection seal off all window and door openings to keep water out. told contractor the windows and doors uinder covered lania area could be sealed off with plastic to allow some light into house THIS IS A REINSPECTION 1. NAIL PLATES FOR PLUMBING P2603.2.1 (top plates in baths) 2. box out around range vent 3, plumbing out of wall (bearing wall close to garage) 4. windows and doors need to be installed by all-rough or openings properly boarded and sealed. 5. FIREBLOCKING MATERIALS R302.11.1 (1-8) 6. roof needs to be complete by all-rough | |||
| ALL ROUGH | 06/10/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NAIL PLATES FOR PLUMBING P2603.2.1 (top plates in baths) 2. box out around range vent 3, plumbing out of wall (bearing wall close to garage) 4. windows and doors need to be installed by all-rough or openings properly boarded and sealed. 5. FIREBLOCKING MATERIALS R302.11.1 (1-8) 6. roof needs to be complete by all-rough | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/01/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION missing straps and bolts per plans (see highlighted afeas on plans trusses do not match roof plans (need revision) 06-01-21... noets above resolved | |||
| ROOF VALLEY & METAL | 06/01/2021 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2021 | Disapproved - NO FEE | WMILLER |
| Note: missing straps and bolts per plans (see highlighted afeas on plans trusses do not match roof plans (need revision) | |||
| ELECTRIC-TUG | 05/03/2021 | APPROVED - AS NOTED | WMILLER |
| Note: approved at 2:00 pm, E-Mailed FPL | |||
| TIE BEAM / LINTEL | 04/20/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 04/19/2021 | APPROVED | TBAKER |
| ELEV CERT-FOUNDATION APPROVAL | 04/16/2021 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 04/05/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/26/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 01/22/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 05/03/2022 | 05/04/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLUM | COMPLETE | 07/01/2021 | 07/09/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision - added gas riser diagram for future generator, pool htr & grill at lanai. | |||
| PLFM | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Building elevation certificate has been accepted. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/16/2021 | 04/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/29/2021 | 04/06/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/29/2021 | 04/06/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us Revision - added SF to garage. | |||
| ZON | COMPLETE | 03/29/2021 | 03/29/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/18/2020 | 12/18/2020 |
| Note: Released By: PBUCKLEY Removed previous review hold. Worksheet calls out for synthetic underlayment. | |||
| PLFM | COMPLETE | 12/11/2020 | 12/11/2020 |
| Note: Released By: JMYERS The Construction elevation certificate has been approved. Please provide Building and Final prior to receiving CO. | |||
| BLD | HOLD | 12/11/2020 | 12/17/2020 |
| Note: Held By: JPI 1. Page 6 calls out 15# underlayment, roofing worksheet calls out synthetic. Due to slope, synthetic or 30# is required (See (table r905.1.1), slope of 4:12 and greater requires astm d226 type ii (30#) | |||
| SW1 | COMPLETE | 12/11/2020 | 12/18/2020 |
| Note: Released By: CTROHA Stormwater will accept the temporary benk mark here but recommends a designated benk mark for the job in the future I spoke with Kevin about this issue. | |||
| PLFM | COMPLETE | 12/11/2020 | 12/11/2020 |
| Note: Released By: JMYERS No comments | |||
| BLD | HOLD | 12/07/2020 | 12/10/2020 |
| Note: Held By: JPI 1. Please provide installation instructions for linear fireplace to confirm that it is a UL listed appliance as well to verify clearances to combustibles. | |||
| CUSVC | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/07/2020 | 12/10/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 12/07/2020 | 12/11/2020 |
| Note: Held By: KRUTH no benchmark on site plan | |||
| ZON | COMPLETE | 12/07/2020 | 12/07/2020 |
| Note: Released By: ELENS | |||
| PLFM | HOLD | 12/07/2020 | 12/07/2020 |
| Note: Held By: JMYERS All pages of the elevation certificate must be turned in. In Section A4. please specify the building use. In Section A8.b and c cannot be 0 they must be N/A. In Section A9.b and c cannot be 0 they must be N/A. On the second page, please type the address at the top of the page, do not hand write it. In Section D, it must be signed and sealed by the surveyor. Additional comments may apply when all pages are submitted. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/06/2022 |
| REINSPECTION FEE | ¤40.00 | 05/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/06/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/06/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/22/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 12/22/2020 |
| SEWER INSPECTION | ¤25.00 | 12/22/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,028.00 | 12/22/2020 |
| SITE PLAN 20 | ¤20.00 | 12/22/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/22/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 12/22/2020 |
| CONNECTION FEES | ¤25.00 | 12/22/2020 |
| METER - DEPOSIT | ¤60.00 | 12/22/2020 |
| WATER-METER | ¤441.07 | 12/22/2020 |
| ADMIN FEE | ¤20.00 | 12/22/2020 |
| BUILDING DISCOUNT 100% | (¤2,358.80) | 12/22/2020 |
| ELECTRIC FEE | ¤368.40 | 12/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 12/22/2020 |
| IMPACT FEE FIRE | ¤367.00 | 12/22/2020 |
| IMPACT FEE PARKS | ¤1,199.12 | 12/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 12/22/2020 |
| MECHANICAL FEE | ¤368.40 | 12/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 12/22/2020 |
| PLAN CHECK FEE | ¤205.60 | 12/22/2020 |
| PLUMBING FEE | ¤368.40 | 12/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤8,981.44 |