Permit #2020120355

Permit Details

Status: COED

Parcel Id: 07-11-31-1040-00000-0360
CONDITIONED SPACE: 2552 sqft
GARAGE: 634 sqft
OPENED PORCH (WITH ROOF) : 275 sqft
OPENED PORCH (WITH ROOF) : 35 sqft
Total Square Footage: 3496 sqft
Block: 00000
Subdivision: 2078 - CANTERBURY ESTATES
Job Phone: 321-610-3924
Location Address: 28 LEWISDALE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/15/2020
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMBELL JR
Owner: VINTAGE ESTATE HOMES LLC

Address

4885 WICKHAM RD

MELBOURNE, FL 32940

Lot: 0360
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES LLC
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924

Sub Contractors

SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/28/2021 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 07/28/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 07/23/2021 APPROVED RGROSS
ROW - STORMWATER FINAL 07/23/2021 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 07/23/2021 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 07/23/2021 APPROVED RGROSS
U-CROSS CONNECTION 07/14/2021 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 07/01/2021 APPROVED KRUTH
U - SEWER TIE IN 06/28/2021 APPROVED FWILLIS
ELECTRIC - EARLY POWER 06/22/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:10
ELECTRIC - EARLY POWER 06/18/2021 Disapproved -FEE REQUIRED RMARTIN
Note: MISSING OUTLET/COVERED IN FRONT GUEST BED ROOM, ALSO NEED TO SAFE OFF WATER HEATER AND PEP TANK CONDUCTORS
LATH/BRICK/ WATER BARRIER 05/13/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Not Complete.
LATH/BRICK/ WATER BARRIER 05/10/2021 Disapproved - NO FEE FWILLIS
Note: Not Complete.
PEP TANK INSTALLATION REQUEST 05/10/2021 APPROVED - AS NOTED CSTONE
Note: dumpster will need to move
PEP TANK INSTALLATION REQUEST 05/06/2021 CANCELLED BY APPLICANT WEB
INSULATION 05/03/2021 APPROVED - AS NOTED FWILLIS
Note: Right Window at front entrance being replaced. Not installed at this time.
ALL ROUGH 04/15/2021 CANCELLED BY APPLICANT WEB
ALL ROUGH 04/15/2021 APPROVED FWILLIS
ROOF VALLEY & METAL 03/29/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION FASTENERS FOR UNDERLAYMENT AS REQUIRED, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) one row at the overlaps fastened 6 inches OC 3/29/21 - Corrections made.
ROOF VALLEY & METAL 03/26/2021 CANCELLED BY APPLICANT FWILLIS
Note: THIS IS A REINSPECTION FASTENERS FOR UNDERLAYMENT AS REQUIRED, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) one row at the overlaps fastened 6 inches OC
ROOF VALLEY & METAL 03/23/2021 Disapproved -FEE REQUIRED WMILLER
Note: FASTENERS FOR UNDERLAYMENT AS REQUIRED, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) one row at the overlaps fastened 6 inches OC
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/22/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Still installing Engineering at the time of my visit. Not Ready
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/19/2021 Disapproved - NO FEE FWILLIS
Note: Still installing Engineering at the time of my visit. Not Ready
FOUND SURVEY APPROVED (OFFICE) 02/19/2021 APPROVED TBAKER
TIE BEAM / LINTEL 02/12/2021 APPROVED FWILLIS
MONOLITHIC SLAB 02/03/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 01/29/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 01/29/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 01/15/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/18/2021 02/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON COMPLETE 02/18/2021 02/18/2021
Note: Released By: TDOAK
BLD COMPLETE 01/05/2021 01/12/2021
Note: Released By: FREODICA Revision- changed kichen sink, masterbath shower and added hose bibb.
ELEC COMPLETE 01/05/2021 01/05/2021
Note: Released By: JMUNSON
BLD COMPLETE 12/07/2020 12/10/2020
Note: Released By: JPI
CUSVC COMPLETE 12/07/2020 12/09/2020
Note: Released By: HHAND
ELEC COMPLETE 12/07/2020 12/08/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 12/07/2020 12/08/2020
Note: Released By: TBAKER
LOCATE COMPLETE 12/07/2020 12/10/2020
Note: Released By: CSTONE
MECH COMPLETE 12/07/2020 12/09/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 12/07/2020 12/10/2020
Note: Released By: JPI
SW1 COMPLETE 12/07/2020 12/11/2020
Note: Released By: KRUTH
ZON COMPLETE 12/07/2020 12/08/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/29/2021
REINSPECTION FEE ¤40.00 07/29/2021
NEW RESIDENTIAL INSPECTIONS ¤644.00 12/15/2020
SITE PLAN 20 ¤20.00 12/15/2020
SURCHARGE FS 533.721 ¤2.00 12/15/2020
SURCHARGE - FS 468.631 ¤2.00 12/15/2020
STORM WATER PERMIT FEES ¤80.00 12/15/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 12/15/2020
SEWER INSPECTION ¤25.00 12/15/2020
SEWER CAPITAL FACILITY ¤2,954.57 12/15/2020
WATER CAPITAL FACILITY FEE ¤2,745.89 12/15/2020
METER - DEPOSIT ¤60.00 12/15/2020
WATER-METER ¤441.07 12/15/2020
ADMIN FEE ¤20.00 12/15/2020
CONNECTION FEES ¤25.00 12/15/2020
BUILDING DISCOUNT 100% (¤1,552.40) 12/15/2020
ELECTRIC FEE ¤253.20 12/15/2020
3% FIRE IMPACT FEE CREDIT (¤11.01) 12/15/2020
IMPACT FEE FIRE ¤367.00 12/15/2020
IMPACT FEE PARKS ¤1,199.12 12/15/2020
IMPACT FEE SCHOOL ¤3,600.00 12/15/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 12/15/2020
MECHANICAL FEE ¤253.20 12/15/2020
3% PARKS IMPACT FEE CREDIT (¤35.97) 12/15/2020
PLAN CHECK FEE ¤128.80 12/15/2020
PLUMBING FEE ¤253.20 12/15/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,521.90