Permit #2020120357
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00700-0180 |
| CONDITIONED SPACE: 1437 sqft |
| GARAGE: 462 sqft |
| OPENED PORCH (WITH ROOF) : 225 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 2166 sqft |
| Block: 00700 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 386-447-4151 |
| Location Address: 17 RYMER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/19/2021 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: ARAGON, MARLON RICARDO & YOLANDA |
|
Address 2546 DUDLEY DRIVE E #D WEST PALM BEACH, FL 33415 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/14/2022 | FINAL APPROVED | JWALKER |
| U-CROSS CONNECTION | 02/18/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/18/2022 | APPROVED - AS NOTED | JHARDING |
| Note: Utilities has to install pep pump assembly in pep tank. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/28/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: EVERYTHING LOOK GOOD AT TIME INSPECTION | |||
| ROW - STORMWATER FINAL | 01/28/2022 | APPROVED - AS NOTED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/24/2022 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 01/24/2022 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 12/22/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 11/18/2021 | APPROVED | RGROSS |
| U - SEWER TIE IN | 10/26/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/26/2021 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/20/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster will need to move | |||
| INSULATION | 09/09/2021 | APPROVED | JWALKER |
| ALL ROUGH | 08/30/2021 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION NEED NAIL PLATE IN MASTER BED ROOM ON UF CONDUIT, NEED TO HAVE MAIN BREAKER INSTALLED AND SERVICE CONUCTORS LANDED, IN REAR GUEST BED ROOM CLOSET AREA, ROMEX IS EXPOSED OUT OF CEILING 8/30/21 Main breaker still not installed and conductors not connected. Check at insulation inspection | |||
| ALL ROUGH | 08/26/2021 | Disapproved - NO FEE | RMARTIN |
| Note: NEED NAIL PLATE IN MASTER BED ROOM ON UF CONDUIT, NEED TO HAVE MAIN BREAKER INSTALLED AND SERVICE CONDUCTORS LANDED, IN REAR GUEST BED ROOM CLOSET AREA, ROMEX IS EXPOSED OUT OF CEILING | |||
| LATH/BRICK/ WATER BARRIER | 08/03/2021 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 06/14/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/03/2021 | APPROVED | MMESSER |
| TIE BEAM / LINTEL | 05/12/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 05/10/2021 | CANCELLED BY APPLICANT | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 04/26/2021 | APPROVED | TDOAK |
| ELECTRIC TEMP POLE | 04/07/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:45 | |||
| MONOLITHIC SLAB | 04/05/2021 | APPROVED | JBODEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/01/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 03/02/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/23/2021 | 04/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/23/2021 | 04/26/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/30/2020 | 12/30/2020 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 12/28/2020 | 03/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ENGIN1 | COMPLETE | 12/22/2020 | 12/28/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 12/22/2020 | 12/22/2020 |
| Note: Held By: ELENS Repeat comment: 5 trees are required for this site. (Robellini Palms are non-credit trees.) | |||
| BLD | COMPLETE | 12/07/2020 | 12/11/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/07/2020 | 12/09/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | HOLD | 12/07/2020 | 12/08/2020 |
| Note: Held By: TBAKER No benchmark on survey | |||
| LOCATE | COMPLETE | 12/07/2020 | 12/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/07/2020 | 12/09/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/07/2020 | 12/11/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/07/2020 | 12/10/2020 |
| Note: Released By: CTROHA | |||
| ZON | HOLD | 12/07/2020 | 12/08/2020 |
| Note: Held By: ELENS 5 trees are required for this site. (Robellini Palms are non-credit trees.) Foundation plantings must be along the side of the house (foundation), not along the driveway. Four foundation shrubs are required on each side of the house. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 03/14/2022 |
| BUILDING DISCOUNT 100% | (¤1,040.00) | 01/19/2021 |
| ELECTRIC FEE | ¤180.00 | 01/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/19/2021 |
| IMPACT FEE FIRE | ¤367.00 | 01/19/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 01/19/2021 |
| MECHANICAL FEE | ¤180.00 | 01/19/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/19/2021 |
| PLAN CHECK FEE | ¤80.00 | 01/19/2021 |
| PLUMBING FEE | ¤180.00 | 01/19/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤400.00 | 01/19/2021 |
| SITE PLAN 20 | ¤20.00 | 01/19/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/19/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/19/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 01/19/2021 |
| SEWER CREDIT | (¤1,342.00) | 01/19/2021 |
| SEWER INSPECTION | ¤25.00 | 01/19/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 01/19/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 01/19/2021 |
| METER - DEPOSIT | ¤60.00 | 01/19/2021 |
| WATER- TURN ON | ¤25.00 | 01/19/2021 |
| ADMIN FEE | ¤20.00 | 01/19/2021 |
| CONNECTION FEES | ¤1,017.83 | 01/19/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,786.75 |