Permit #2020120520
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0050 |
| CONDITIONED SPACE: 3153 sqft |
| OPENED PORCH (WITH ROOF) : 690 sqft |
| OPENED PORCH (WITH ROOF) : 185 sqft |
| GARAGE: 1030 sqft |
| Total Square Footage: 5058 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 184 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/28/2020 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: WETMORE, WILLIAM J & VICKI L |
|
Address 11542 BIG CANOE BIG CANOE, GA 30143 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤501,762.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
MARK A RUGGIERO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
411 6TH STREET HOLLY HILL , FL 32117 |
01612 (Exp: 07/23/2023) | 386-252-5555 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/06/2022 | FINAL APPROVED | LMILLER |
| GAS FINAL | 12/27/2021 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 12/13/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: re-use irrigation-no cross connection | |||
| ROW - STORMWATER FINAL | 12/13/2021 | APPROVED | RGROSS |
| Note: See note on Field Survey. Right rear mulch bed needs moved back off the property line to prevent mulch wash out in the easement. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/13/2021 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/10/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Right rear mulch bed needs moved back off the property line to prevent mulch wash out in the easement before the Fianl Storm Water can be approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/10/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 12/10/2021 | APPROVED | RGROSS |
| GAS ROUGH | 11/17/2021 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/10/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: See note on Partially approved inspection dated 9/22/21. Second pre- pour was needed BEFORE pavers were placed. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/06/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Approved for the length, width and depth. Second pre-pour will be needed when base is spread and compacted but BEFORE the pavers are placed. 10/6/21 - Plenty of Base on site. Builder to get good compaction before placing pavers. | |||
| ROW- PAVER RESTRAINTS | 09/22/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 09/22/2021 | PARTIALLY APPROVED | RGROSS |
| Note: Approved for the length, width and depth. Second pre-pour will be needed when base is spread and compacted but BEFORE the pavers are placed. | |||
| ELECTRIC - EARLY POWER | 07/14/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:30 | |||
| GRAVITY SEWER TEST | 05/12/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED ON 5/11/21 | |||
| U - SEWER TIE IN | 05/12/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIA WAS APPROVED ON 5/11/21 | |||
| LATH/BRICK/ WATER BARRIER | 05/06/2021 | APPROVED | BGREVE |
| INSULATION | 05/06/2021 | APPROVED | BGREVE |
| ALL ROUGH | 04/28/2021 | APPROVED - AS NOTED | WMILLER |
| Note: need the following by insulation nail platers on electric and low voltage (check all) FBC E3802.1 (table), AND 3802.3.2 nail plate at top plate for dryer exaust FBC… R, M1308.2 | |||
| ROOF VALLEY & METAL | 03/12/2021 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2021 | APPROVED | MMESSER |
| ELECTRIC-TUG | 02/26/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:30 | |||
| TIE BEAM / LINTEL | 02/18/2021 | APPROVED - AS NOTED | JBODEN |
| Note: 1 dowel at front west side | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/17/2021 | APPROVED | TBAKER |
| ELEV CERT-FOUNDATION APPROVAL | 02/16/2021 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 02/01/2021 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/28/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 01/04/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/10/2021 | 12/13/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/09/2021 | 12/09/2021 |
| Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 12/03/2021 | 12/03/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been accepted. | |||
| BADMIN | HOLD | 12/03/2021 | 12/03/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT SCHEDULE FINAL SURVEY INSPECTION PAST EXPIRATION DATE OF NOC ON 12/4/21. | |||
| PLUM | COMPLETE | 11/15/2021 | 11/16/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/16/2021 | 02/17/2021 |
| Note: Released By: TBAKER | |||
| PLFM | COMPLETE | 02/16/2021 | 02/16/2021 |
| Note: Released By: JMYERS The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 02/16/2021 | 02/16/2021 |
| Note: Released By: TDOAK | |||
| ZON | COMPLETE | 12/18/2020 | 12/18/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 12/18/2020 | 12/23/2020 |
| Note: Released By: PBUCKLEY | |||
| PLFM | COMPLETE | 12/11/2020 | 12/11/2020 |
| Note: Released By: JMYERS No comments | |||
| BLD | HOLD | 12/10/2020 | 12/17/2020 |
| Note: Held By: JPI 1. Provide skylight (sun tunnel)information on the product approval listing. | |||
| CUSVC | COMPLETE | 12/10/2020 | 12/14/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/10/2020 | 12/11/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 12/10/2020 | 12/11/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/10/2020 | 12/11/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/10/2020 | 12/11/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/10/2020 | 12/17/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/10/2020 | 12/17/2020 |
| Note: Released By: CTROHA | |||
| ZON | HOLD | 12/10/2020 | 12/10/2020 |
| Note: Held By: AMOBLEY Please remove or change the verbiage for the shutters in front on elevation page. As shutters they would not meet the LDC definition for shutters. | |||
| PLFM | COMPLETE | 12/10/2020 | 12/10/2020 |
| Note: Released By: JMYERS The Construction elevation certificate has been approved. Please provide Building and Final prior to receiving CO. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 01/03/2022 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 01/03/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/03/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/03/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/03/2022 |
| CONNECTION FEES | ¤25.00 | 12/28/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/28/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 12/28/2020 |
| SEWER INSPECTION | ¤25.00 | 12/28/2020 |
| METER - DEPOSIT | ¤60.00 | 12/28/2020 |
| WATER-METER | ¤441.07 | 12/28/2020 |
| WATER-METER | ¤366.42 | 12/28/2020 |
| ADMIN FEE | ¤20.00 | 12/28/2020 |
| BUILDING DISCOUNT 100% | (¤2,308.40) | 12/28/2020 |
| ELECTRIC FEE | ¤361.20 | 12/28/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 12/28/2020 |
| IMPACT FEE FIRE | ¤367.00 | 12/28/2020 |
| IMPACT FEE PARKS | ¤1,199.12 | 12/28/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/28/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 12/28/2020 |
| MECHANICAL FEE | ¤361.20 | 12/28/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 12/28/2020 |
| PLAN CHECK FEE | ¤200.80 | 12/28/2020 |
| PLUMBING FEE | ¤361.20 | 12/28/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,004.00 | 12/28/2020 |
| SITE PLAN 20 | ¤20.00 | 12/28/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/28/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 12/28/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,262.86 |