Permit #2020120935
Permit Details
Status: COED
| Parcel Id: 10-11-30-4937-00000-0040 |
| Total Square Footage: 2500 sqft |
| Block: 00000 |
| Subdivision: 2262 - PALM COAST INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 11 INDUSTRY DR |
| Type: CA - COMM ADDITION |
| Issue Date: 02/18/2021 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: US INVESTMENT HOLDING GROUP INC |
|
Address 5725 REDWOOD DRIVE ROHNERT PARK, CA 94928 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤547,544.00 |
| Job Description: EXTERIOR RENOVATIOS - WAREHOUSE ADDITION |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Sub Contractors
MICHAEL WAYNE LYNCH
| Status | Location Address | State License Number | Phone |
| CANCEL |
804 ROOT ST DAYTONA BEACH, FL 32114 |
ER13015553 (Exp: 08/31/2022) | 386-252-2287 |
ISAAC WALTER JOHNSTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
887 BRENTWOOD DRIVE Daytona Beach, FL 32117 |
CFC023634 (Exp: 08/31/2026) | (386) 252-7047 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 09/07/2021 | FINAL APPROVED | LMILLER |
| FIRE FINAL | 09/07/2021 | APPROVED | LMILLER |
| U - UTILITY COMMERCIAL FINAL | 09/07/2021 | FINAL APPROVED | LFITZGERALD |
| FIREWALL PENETRATIONS | 09/03/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: FOREST DID THIS INSPECTION ON THE FIREWALL FINAL | |||
| INSULATION | 09/02/2021 | APPROVED | CPISCITELLI |
| Note: based on insulation report submitted, insulation inspection for foam insulation in bay is approved | |||
| ELECTRIC 2ND ROUGH | 08/27/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: DIS THIS UNDER 1ST ROUGH INSPECTION | |||
| ELECTRIC FINAL | 08/27/2021 | APPROVED | RMARTIN |
| HVAC ROUGH | 08/26/2021 | APPROVED | CPISCITELLI |
| HVAC FINAL | 08/26/2021 | FINAL APPROVED | CPISCITELLI |
| FIREWALL FINAL | 08/13/2021 | FINAL APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 07/13/2021 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 07/06/2021 | APPROVED | FWILLIS |
| Note: 1st layer | |||
| FIREWALL DRYWALL NAILING | 06/30/2021 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 06/28/2021 | APPROVED | FWILLIS |
| Note: Third Layer on End Unit. | |||
| FIREWALL NAILING | 06/23/2021 | APPROVED | FWILLIS |
| Note: SHAFT WALL | |||
| FIREWALL FRAMING | 06/23/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION SECOND LAYER Next Inspection 3 layers Firewall screw. | |||
| FIREWALL DRYWALL NAILING | 06/18/2021 | APPROVED | FWILLIS |
| Note: Includes Shaft Wall. (Firewall) (First Layer) | |||
| ELECTRIC OTHER | 06/09/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: INTERIOR WALLS, SHOULD HAVE BEEN 2ND ROUGH | |||
| FIREWALL FRAMING | 06/07/2021 | PARTIALLY APPROVED | FWILLIS |
| Note: Next Inspection 3 layers Firewall screw. | |||
| FRAMING | 06/03/2021 | APPROVED | FWILLIS |
| FIREWALL NAILING | 06/03/2021 | APPROVED | FWILLIS |
| LINTEL | 05/20/2021 | APPROVED | FWILLIS |
| FIREWALL NAILING | 05/18/2021 | APPROVED | FWILLIS |
| Note: Dens Glass | |||
| FRAMING | 05/07/2021 | APPROVED | FWILLIS |
| Note: East Side Metal columns. | |||
| FRAMING | 04/16/2021 | APPROVED | FWILLIS |
| Note: Columns | |||
| MONOLITHIC SLAB | 03/23/2021 | APPROVED | JBODEN |
| PLUMBING 1ST ROUGH | 03/18/2021 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/02/2021 | 09/02/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/02/2021 | 09/03/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/30/2021 | 08/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide updated report. Report date is expired | |||
| MECH | HOLD | 08/30/2021 | 08/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide updated report. Report date is expired | |||
| MECH | COMPLETE | 03/08/2021 | 03/09/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/22/2021 | 02/22/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PG M-1 DOES NOT HAVE DIGITAL SIGNATURE | |||
| BLD | COMPLETE | 02/22/2021 | 03/05/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/22/2021 | 02/23/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/22/2021 | 02/22/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 02/01/2021 | 02/08/2021 |
| Note: Released By: DRAMIREZ | |||
| ELEC | COMPLETE | 02/01/2021 | 02/03/2021 |
| Note: Released By: JMUNSON | |||
| MECH | COMPLETE | 02/01/2021 | 02/03/2021 |
| Note: Released By: CPISCITELLI | |||
| FI1 | COMPLETE | 02/01/2021 | 02/12/2021 |
| Note: Released By: JBODEN | |||
| BLD | COMPLETE | 02/01/2021 | 02/18/2021 |
| Note: Released By: PBUCKLEY | |||
| PLUM | COMPLETE | 02/01/2021 | 02/17/2021 |
| Note: Released By: PBUCKLEY | |||
| BLD | HOLD | 12/21/2020 | 01/06/2021 |
| Note: Held By: PBUCKLEY All references below to the 2017 Florida Building Code-Building and Florida Building Code-Existing Building. 1. Provide Site Plan drawn in accordance with Section 107.2.5. Include dimensions to all property lines and / or public ways from closest point of each side of exiting and addition. Show flood hazard areas and all other information outlined in this section. 2. Provide complete code analysis using the Florida Building Code - Existing Building per Chapters 5, 8 and 11. Also use Chapter 3, 5 and 6 of the Florida Building Code - Building as necessary. Provide occupancy classification for existing and proposed addition. Provide construction type for exiting and proposed addition. Provide allowable area and height calculations vs. actual area and height. If area increases are necessary show them and calculations. If this is a mixed occupancy building (does the building contain B occupancy offices?) then show calculations for mixed occupancy building. Provide plumbing fixture calculations for existing and new addition per Chapter 29. Note, if work is performed in this building and it is not purely storage the occupancy classification will be either F-1 or F-2 and not storage. Also note, if this building manufacturer’s or otherwise works on boats it will be an F-1 occupancy. Also note, if either than an S-1 or F-1 occupancy, an automatic NFPA fire sprinkler system is required throughout per Section 903.2.4 Florida Building Code-Building and Section 1102.3 Florida Building Code-Building based on area of the building exceeding 12,000 square feet. Also note, the existing building, if an F-1 occupancy is not eligible for the Exception to Section 1102.3. 3. Correct permit application to include reference to enclosing 5,000 square feet square of existing open warehouse in addition to the 2,500 square foot addition. 4. Submit geotechnical investigation report signed and sealed by a Florida licensed professional engineer per Section 1803.2. Report to comply with Section 1803.6. 5. Add note on Plan Sheet AB-2 indicating all foundation / slab will be removed along with CMU walls and lawfully disposed of. If there is an existing door opening onto this slab / open structure please also add note indicating a landing will be provided on the exterior side of door. Provide landing dimensions Provide exterior landing details on Plan Sheet D-1 where new doors are added per Notes 2, 5 and 12. 6. Additional plan review comments may result after submittal of site plan and code analysis. | |||
| DSD | HOLD | 12/21/2020 | 12/22/2020 |
| Note: Held By: DRAMIREZ An application package for a Development Order approval must be submitted for review to include landscape plans and architectural plans. | |||
| ELEC | HOLD | 12/21/2020 | 12/22/2020 |
| Note: Held By: JMUNSON 1. Submit electrical drawings 2. Submit interior lighting compliance certificate. FBC 2017 Energy Code | |||
| FI1 | HOLD | 12/21/2020 | 01/06/2021 |
| Note: Held By: WMILLER 1. Provide code analysis showing occupancy classification and building construction type for building and addition per Chapter 3 and 5 FBC Building 2017 6Th edition and Chapter 5 and 11 FBC Existing Building 2017 6Th edition. 2. Please provide Occupancy classification per NFPA 101 3. Please proved Please provide complete Life Safety Plan per FFPC I Fire Code 10.14.3.4.3 (1-7G) for review. | |||
| MECH | HOLD | 12/21/2020 | 12/29/2020 |
| Note: Held By: CPISCITELLI 1. Provide code analysis showing occupancy classification and building construction type for building and addition per Chapter 3 and 5 FBC Building 2017 6Th edition and Chapter 5 and 11 FBC Existing Building 2017 6Th edition. 2. Provide ventilation calculation per 403.3.1.1 FBC Mechanical 2017 6Th edition. 3. Provide mechanical exhaust details per Section 502 FBC Mechanical 2017 6Th edition | |||
| PLUM | HOLD | 12/21/2020 | 01/06/2021 |
| Note: Held By: PBUCKLEY Not deteremined yet whether a plumbing code review is required for this project. Additional information is required as noted in the Building review HOLD. | |||
| UD1 | COMPLETE | 12/21/2020 | 01/05/2021 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 02/18/2021 |
| INSPECTION - COMMERCIAL ADD | ¤3,832.81 | 02/18/2021 |
| BUILDING DISCOUNT 100% | (¤5,299.55) | 02/18/2021 |
| ELECTRIC FEE | ¤388.53 | 02/18/2021 |
| PLAN CHECK FEE | ¤629.68 | 02/18/2021 |
| PLUMBING FEE | ¤388.53 | 02/18/2021 |
| SITE PLAN 20 | ¤20.00 | 02/18/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/18/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/18/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24.00 |