Permit #2020120937
Permit Details
Status: STATE
| Parcel Id: 09-12-31-0000-02030-0020 |
| Block: 02030 |
| Subdivision: - |
| Job Phone: 904-551-3003 |
| Location Address: 60 MEMORIAL MEDICAL PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 04/20/2021 |
| NOC: RECORDED |
| Applicant name: DANIEL TODD DAVIS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤79,000.00 |
| Job Description: 2ND FLOOR - ICU - INTERIOR REPAIRS - CIRCUIT WORK-ELECTRICAL ONLY |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION SERVICES INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3621 ST AUGUSTINE RD JACKSONVILLE, FL 32207 |
CBC1259753 (Exp: 08/31/2026) | 904-551-3003 | 904-551-9637 |
Sub Contractors
DANIEL AUTREY BROWN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2251 ROSSELLE STR JACKSONVILLE , FL 32204 |
EC13004785 (Exp: 08/31/2026) | 904-388-8000 | 904-384-9446 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC 2ND ROUGH | 05/06/2021 | PARTIALLY APPROVED | RMARTIN |
| Note: Jeff - 904-631-2717 ROOM 2312 | |||
| ELECTRIC 2ND ROUGH | |||
| Note: THIS IS A REINSPECTION Jeff - 904-631-2717 ROOM 2312 | |||
| ABOVE CEILING | |||
| BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| FI1 | COMPLETE | 02/05/2021 | 02/22/2021 |
| Note: Released By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/05/2021 | 02/22/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/21/2020 | 01/07/2021 |
| Note: Held By: PBUCKLEY Permit application and confirmation from CSS license holder, Mr. Dan Davis, indicate this permit is for electrical work only associated with the lifts. However, mechanical plan sheets along with product vendor sheets for the lift systems have been uploaded for this permit. Mechanical plan sheets indicate some temporary mechanical air filtering work to be performed using Negative Air Machines (does not require a permit), but also indludes information suggesting field modifications to duct systems and some new duct work is proposed as part of this project. Since the contractor is not responsible for this work, a separate permit will be required for mechancal work as decribed on the mechanical plan sheets. CSS also indicated the installation of lift equipment is not in their scope of work either and is he responsibility of the vendor's contractor. Installation of lift equipment involves modifications to structural concrete floors, albeit it what appears to be insignificant work. However, that structural work also requires permit. Based on our understanding the scope of work is correct on the permit application, we will need to remove electrical, mechanical, vendor and other plan sheets from this permit so it can be issued. Separate permtis will be required as noted above. I need confirmation of this approach and need to reach out to the hospital PM to tell them they need to get additional permits. Please call Patrick Buckley 386-986-3786 Thank you | |||
| DSD | COMPLETE | 12/21/2020 | 12/22/2020 |
| Note: Released By: DRAMIREZ No exterior work. All interior. | |||
| ELEC | COMPLETE | 12/21/2020 | 12/28/2020 |
| Note: Released By: JMUNSON | |||
| FI1 | HOLD | 12/21/2020 | 01/06/2021 |
| Note: Held By: WMILLER Please place the following note on the cover sheet... 1. Note for Existing Sprinklers and or Fire Alarms: Any construction alterations having effect on the building fire sprinkler and or Fire Alarms system layout and coverage, shall be addressed by a fire protection contractor under separate permit prior to project completion and approval. 2. Need Life Safety Plan to include travel distance from most remote location, exit and travel distance to extinguishers, extinguisher location, exit signs at egress/ingress and visible from any exit access path from any office/room and bathroom. Per FFPC 6th edition and AHJ | |||
| MECH | COMPLETE | 12/21/2020 | 12/22/2020 |
| Note: Released By: CPISCITELLI | |||
| UD1 | COMPLETE | 12/21/2020 | 12/22/2020 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 04/20/2021 |
| INSPECTION - COMMERCIAL ADD | ¤553.00 | 04/20/2021 |
| BUILDING DISCOUNT 100% | (¤820.40) | 04/20/2021 |
| ELECTRIC FEE | ¤107.40 | 04/20/2021 |
| PLAN CHECK FEE | ¤100.00 | 04/20/2021 |
| SITE PLAN 20 | ¤20.00 | 04/20/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/20/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/20/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24.00 |