I want to search for...
Permit #2020120981
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00060-0040 |
| CONDITIONED SPACE: 1824 sqft |
| CONDITIONED SPACE: 1824 sqft |
| GARAGE: 415 sqft |
| GARAGE: 415 sqft |
| OPENED PORCH (WITH ROOF) : 151 sqft |
| OPENED PORCH (WITH ROOF) : 151 sqft |
| OPENED PORCH (WITH ROOF) : 79 sqft |
| OPENED PORCH (WITH ROOF) : 79 sqft |
| Total Square Footage: 4938 sqft |
| Block: 00060 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-627-0430 |
| Location Address: 15 EMPIRE LN |
| Type: DU - DUPLEX |
| Issue Date: 01/27/2021 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES LLC |
|
Address 72 HERNANDEZ AVE PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/01/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 09/01/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 08/31/2021 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 08/31/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/31/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/30/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 08/30/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 07/20/2021 | APPROVED | RGROSS |
| Note: READY TO POUR at the time of the inspection. | |||
| ELECTRIC - EARLY POWER | 07/15/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Main breakers needs to be labeled A and B 7/15/21 Emailed FPL at 8:53 am | |||
| ELECTRIC - EARLY POWER | 07/14/2021 | Disapproved - NO FEE | JMUNSON |
| Note: Main breakers needs to be labeled A and B | |||
| GRAVITY SEWER TEST | 07/06/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 07/06/2021 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/01/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 06/01/2021 | APPROVED | TSTAUFFACHER |
| INSULATION | 06/01/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 05/26/2021 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Add protection plates in: Left unit--Back bedroom north wall at ceiling line Left unit--Behind door bell transformer on entry side Will check at insulation | |||
| FIREWALL FINAL | 05/26/2021 | APPROVED | TSTAUFFACHER |
| Note: Added inspection//checked at all rough 05/22/2021--TS | |||
| ROOF VALLEY & METAL | 05/24/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/05/2021 | APPROVED | MMESSER |
| TIE BEAM / LINTEL | 04/08/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Multiple dowel rods do not meet coverage guidelines. Marked in green paint. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). | |||
| TIE BEAM / LINTEL | 04/06/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Multiple dowel rods do not meet coverage guidelines. Marked in green paint. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/05/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/17/2021 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/11/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/03/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/31/2021 | 04/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | COMPLETE | 03/31/2021 | 03/31/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/08/2021 | 01/08/2021 |
| Note: Released By: ELENS | |||
| MECH | COMPLETE | 01/08/2021 | 01/08/2021 |
| Note: Released By: CPISCITELLI | |||
| BLD | COMPLETE | 01/08/2021 | 01/13/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/30/2020 | 12/30/2020 |
| Note: Released By: GBERTOLA | |||
| ZON | HOLD | 12/22/2020 | 12/22/2020 |
| Note: Held By: ELENS Please provide both side elevations and label them. Banding must wrap corners. (Show on side elevations.) | |||
| BLD | HOLD | 12/22/2020 | 12/29/2020 |
| Note: Held By: JPI 1) Provide UL Detail # for separation wall. ([A]107.2.1) 2) MI Window #15331- There are no records that match the search criteria. ([A]107.2.1). Please provide the product approval as a separate attachment. 3) Roof Vent #17062- There are no records that match the search criteria. ([A]107.2.1. Please provide the product approval as a separate attachment. | |||
| CUSVC | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/22/2020 | 12/28/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 12/22/2020 | 12/22/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 12/22/2020 | 12/23/2020 |
| Note: Held By: CPISCITELLI Plans show foam insulation. Energy Calcs say R30. Revise to match | |||
| PLUM | COMPLETE | 12/22/2020 | 12/29/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 12/22/2020 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/31/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 08/31/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 08/31/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤77.94) | 01/27/2021 |
| SEWER CREDIT | (¤1,700.00) | 01/27/2021 |
| SEWER INSPECTION | ¤25.00 | 01/27/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 01/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 01/27/2021 |
| METER - DEPOSIT | ¤120.00 | 01/27/2021 |
| WATER- TURN ON | ¤50.00 | 01/27/2021 |
| ADMIN FEE | ¤20.00 | 01/27/2021 |
| CONNECTION FEES | ¤2,035.66 | 01/27/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 01/27/2021 |
| BUILDING DISCOUNT 100% | (¤2,119.40) | 01/27/2021 |
| ELECTRIC FEE | ¤334.20 | 01/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 01/27/2021 |
| IMPACT FEE FIRE | ¤734.00 | 01/27/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 01/27/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 01/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,598.00 | 01/27/2021 |
| MECHANICAL FEE | ¤334.20 | 01/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 01/27/2021 |
| PLAN CHECK FEE | ¤182.80 | 01/27/2021 |
| PLUMBING FEE | ¤334.20 | 01/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤914.00 | 01/27/2021 |
| SITE PLAN 20 | ¤20.00 | 01/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,760.99 |