I want to search for...
Permit #2020120984
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00050-0160 |
| CONDITIONED SPACE: 1667 sqft |
| CONDITIONED SPACE: 1667 sqft |
| GARAGE: 433 sqft |
| GARAGE: 433 sqft |
| OPENED PORCH (WITH ROOF) : 151 sqft |
| OPENED PORCH (WITH ROOF) : 151 sqft |
| OPENED PORCH (WITH ROOF) : 55 sqft |
| OPENED PORCH (WITH ROOF) : 55 sqft |
| Total Square Footage: 4612 sqft |
| Block: 00050 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-627-0430 |
| Location Address: 16 EMPIRE LN |
| Type: DU - DUPLEX |
| Issue Date: 01/27/2021 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES LLC |
|
Address 72 HERNANDEZ AVE PALM COAST, FL 32137 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤280,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/12/2021 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 11/12/2021 | FINAL APPROVED | JWALKER |
| BLD - BUILDING FINAL | 11/10/2021 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 11/09/2021 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 11/09/2021 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 11/08/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/08/2021 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 11/08/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/05/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/05/2021 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 09/24/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION The band connecting the two pipes in the center is loose. The whole purpose of the rubbert seal and bolted band is to form a tight seal to prevent water and sediment from escaping or entering the culvert that is partially in the earth. When the band is loose both will occur and cause washout under the driveway and eventually driveway failure. 9/24/21 - READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 09/23/2021 | Disapproved - NO FEE | RGROSS |
| Note: The band connecting the two pipes in the center is loose. The whole purpose of the rubbert seal and bolted band is to form a tight seal to prevent water and sediment from escaping or entering the culvert that is partially in the earth. When the band is loose both will occur and cause washout under the driveway and eventually driveway failure. | |||
| ELECTRIC - EARLY POWER | 09/14/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:32 am | |||
| GRAVITY SEWER TEST | 09/07/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 09/07/2021 | APPROVED | JGIBSON |
| INSULATION | 07/14/2021 | APPROVED | TSTAUFFACHER |
| PEP TANK INSTALLATION REQUEST | 07/12/2021 | APPROVED - AS NOTED | CSTONE |
| Note: dumpster will need to move | |||
| ALL ROUGH | 07/06/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Fill tub drain holes Hook bathroom exhuast fan duct back up. | |||
| ROOF VALLEY & METAL | 06/17/2021 | APPROVED | MMESSER |
| LATH/BRICK/ WATER BARRIER | 06/17/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/03/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 04/27/2021 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 04/16/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/05/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: No current compaction test results in box | |||
| MONOLITHIC SLAB | 04/05/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION No current compaction test results in box | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/29/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: provide portable rest-room before slab inspection | |||
| WATER METER INSTALLATION REQUEST | 02/03/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/15/2021 | 04/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2021 | 04/15/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 04/14/2021 | 04/15/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Foundation survey shows the wrong site/address. | |||
| ZON | COMPLETE | 04/14/2021 | 04/15/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/08/2021 | 01/13/2021 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 01/08/2021 | 01/11/2021 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 01/08/2021 | 01/08/2021 |
| Note: Released By: ELENS | |||
| SW1 | COMPLETE | 01/04/2021 | 01/04/2021 |
| Note: Released By: GBERTOLA | |||
| SW1 | HOLD | 12/30/2020 | 12/30/2020 |
| Note: Held By: GBERTOLA The subject lots drainage must not negatively impact any adjacent property. | |||
| ZON | HOLD | 12/22/2020 | 12/22/2020 |
| Note: Held By: ELENS Please provide both the right and left elevations | |||
| BLD | HOLD | 12/22/2020 | 01/04/2021 |
| Note: Held By: JPI 1. The energy calculations appear to be for only one of the unites. 2. Sheet 1/6 roofing detail calls out 30# felt underlayment whereas the roofing worksheet calls out peel and Stick underlayment. Please cure. | |||
| CUSVC | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/22/2020 | 12/28/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 12/22/2020 | 12/22/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/22/2020 | 01/04/2021 |
| Note: Released By: JPI 1. Washing machine drain not labeled on diagram. Please cure. | |||
| SWALE | COMPLETE | 12/22/2020 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 11/12/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 11/12/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 11/12/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤77.94) | 01/27/2021 |
| SEWER CREDIT | (¤1,700.00) | 01/27/2021 |
| SEWER INSPECTION | ¤25.00 | 01/27/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 01/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 01/27/2021 |
| METER - DEPOSIT | ¤120.00 | 01/27/2021 |
| WATER- TURN ON | ¤50.00 | 01/27/2021 |
| ADMIN FEE | ¤20.00 | 01/27/2021 |
| CONNECTION FEES | ¤2,035.66 | 01/27/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 01/27/2021 |
| BUILDING DISCOUNT 100% | (¤1,972.40) | 01/27/2021 |
| ELECTRIC FEE | ¤313.20 | 01/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 01/27/2021 |
| IMPACT FEE FIRE | ¤734.00 | 01/27/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 01/27/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 01/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,598.00 | 01/27/2021 |
| MECHANICAL FEE | ¤313.20 | 01/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 01/27/2021 |
| PLAN CHECK FEE | ¤168.80 | 01/27/2021 |
| PLUMBING FEE | ¤313.20 | 01/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤844.00 | 01/27/2021 |
| SITE PLAN 20 | ¤20.00 | 01/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,740.99 |