Permit #2020120999
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00940-0050 |
| CONDITIONED SPACE: 1873 sqft |
| GARAGE: 389 sqft |
| OPENED PORCH (WITH ROOF) : 420 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| Total Square Footage: 2710 sqft |
| Block: 00940 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 321-610-3924 |
| Location Address: 11 LAKE SUCCESS PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/12/2021 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 N WICKHAM RD MELBOURNE, FL 32940 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JOSEPH G BURCHFIELD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
2820 LEWIS SPEEDWAY SUITE B ST AUGUSTINE, FL 32086 |
CCC058201 (Exp: 08/31/2024) | 904-794-7100 | 904-794-7009 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/22/2021 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 07/22/2021 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/21/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION REMOVE THE POTTY AND THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IT ON THE DRIVEWAY REPAIR THE SWALE WHERE THE POTTY WAS, WITH SOD corrections made | |||
| ROW - STORMWATER FINAL | 07/21/2021 | APPROVED - AS NOTED | KRUTH |
| Note: REMOVE THE POTTY AND THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IT ON THE DRIVEWAY REPAIR THE SWALE WHERE THE POTTY WAS, WITH SOD the swales are getting raised to meet existing and the asphault is getting repaired along the road edge and im passing all as noted to get C O | |||
| ROW - FINAL APRON (AFTER POUR) | 07/21/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/16/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: REMOVE THE POTTY AND THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IT ON THE DRIVEWAY REPAIR THE SWALE WHERE THE POTTY WAS, WITH SOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/16/2021 | APPROVED | GBERTOLA |
| U-CROSS CONNECTION | 07/14/2021 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 07/08/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 11:17 am | |||
| ROW- PRE-APRON (PRE-POUR) | 06/28/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 06/28/2021 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 05/17/2021 | APPROVED | CSTONE |
| INSULATION | 05/13/2021 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 05/11/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 05/11/2021 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 05/11/2021 | APPROVED - AS NOTED | FWILLIS |
| Note: Will check the 5' of Head Pressure at Insulation. | |||
| ROOF VALLEY & METAL | 04/08/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 04/07/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/31/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/04/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/25/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 02/17/2021 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 02/17/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/12/2021 | APPROVED | JBODEN |
| GRAVITY SEWER TEST | 02/12/2021 | APPROVED | JBODEN |
| WATER METER INSTALLATION REQUEST | 01/19/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/03/2021 | 03/03/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/03/2021 | 03/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | COMPLETE | 01/05/2021 | 01/05/2021 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 12/22/2020 | 01/04/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 12/22/2020 | 12/28/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 12/22/2020 | 12/22/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 12/22/2020 | 12/23/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/22/2020 | 01/04/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/22/2020 | 12/30/2020 |
| Note: Released By: RGROSS | |||
| ZON | HOLD | 12/22/2020 | 12/23/2020 |
| Note: Held By: AMOBLEY Please show width of concrete driveway on survey/site plan Elevation page have both left and right elevation labeled as the right elevation | |||
| SWALE | COMPLETE | 12/22/2020 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 01/12/2021 |
| WATER- TURN ON | ¤25.00 | 01/12/2021 |
| ADMIN FEE | ¤20.00 | 01/12/2021 |
| CONNECTION FEES | ¤1,017.83 | 01/12/2021 |
| BUILDING DISCOUNT 100% | (¤1,216.40) | 01/12/2021 |
| ELECTRIC FEE | ¤205.20 | 01/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 01/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 01/12/2021 |
| MECHANICAL FEE | ¤205.20 | 01/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/12/2021 |
| PLAN CHECK FEE | ¤96.80 | 01/12/2021 |
| PLUMBING FEE | ¤205.20 | 01/12/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤484.00 | 01/12/2021 |
| SITE PLAN 20 | ¤20.00 | 01/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/12/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 01/12/2021 |
| SEWER CREDIT | (¤1,466.00) | 01/12/2021 |
| SEWER INSPECTION | ¤25.00 | 01/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 01/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 01/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,622.75 |