Permit #2020121070

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00120-0130
CONDITIONED SPACE: 1738 sqft
GARAGE: 517 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
OPENED PORCH (WITH ROOF) : 30 sqft
Total Square Footage: 2482 sqft
Block: 00120
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 386-447-4151
Location Address: 26 FIRCREST LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/19/2021
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: VINOCUR ROBERT G & DIANA M VINOCUR H&W

Address

1740 MILLARD AVE

MADISON HEIGHTS, MI 48071

Lot: 0130
Contracted Stated Job Value: ¤260,000.00
Job Description: SINGLE FAMILY HOME
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/09/2022 PARTIALLY APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 02-08-2022. Energy calculations do not match, AHU and outdoor units model numbers do not match with AHRI.
BLD - BUILDING FINAL 02/09/2022 FINAL APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 02-08-2022. Energy calculations do not match, AHU and outdoor units model numbers do not match with AHRI.
BLD - BUILDING FINAL 02/08/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 02-08-2022. Energy calculations do not match, AHU and outdoor units model numbers do not match with AHRI.
BLD - BUILDING FINAL 02/07/2022 Disapproved - NO FEE AGAETANO
Note: 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 6. No hot water.
U-CROSS CONNECTION 02/03/2022 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 02/03/2022 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 02/02/2022 APPROVED - AS NOTED PFLANAGAN
Note: looks good at time of inspection just clean out dirt from pipe
ROW FIELD SURVEY /GRADING CERTIFICATION 02/02/2022 APPROVED - AS NOTED PFLANAGAN
Note: at time of inspection everything looks good
ROW - STORMWATER FINAL 02/02/2022 APPROVED - AS NOTED PFLANAGAN
Note: look good at time of inspection please just clean dirt out of pipe
FINAL SURVEY (OFFICE USE ONLY) 02/02/2022 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 12/21/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:45
ROW- PRE-APRON (PRE-POUR) 12/02/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete
INSULATION 12/01/2021 APPROVED - AS NOTED PBUCKLEY
Note: Insulation inspection approved upon receipt of 3rd party energy efficiency / insulation inspection report.
GRAVITY SEWER TEST 10/28/2021 APPROVED MGIBSON
U - SEWER TIE IN 10/28/2021 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 08/13/2021 APPROVED PBUCKLEY
ALL ROUGH 08/06/2021 APPROVED FWILLIS
ROOF VALLEY & METAL 05/27/2021 APPROVED BGREVE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/21/2021 APPROVED - AS NOTED BGREVE
Note: tighten all bolts at bearing wall bottom plate and side wall attachments. all nuts are loose on these connections HIS IS A REINSPECTION no approved drawings onsite no approved truss engineering drawings onsite
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/19/2021 Disapproved - NO FEE BGREVE
Note: no approved drawings onsite no approved truss engineering drawings onsite
ELECTRIC TEMP POLE 05/06/2021 Disapproved -FEE REQUIRED RMARTIN
Note: NO POLE ON SITE
TIE BEAM / LINTEL 04/27/2021 APPROVED BGREVE
FOUND SURVEY APPROVED (OFFICE) 04/21/2021 APPROVED TBAKER
MONOLITHIC SLAB 04/05/2021 APPROVED BGREVE
PLUMBING 1ST ROUGH UNDERGROUND 03/29/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/22/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 02/08/2022 02/08/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 04/21/2021 04/21/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/21/2021 04/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 01/12/2021 04/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/11/2021 01/12/2021
Note: Released By: TBAKER
BLD COMPLETE 12/23/2020 01/04/2021
Note: Released By: JPI
CUSVC COMPLETE 12/23/2020 12/28/2020
Note: Released By: AROSCOE
ELEC COMPLETE 12/23/2020 12/28/2020
Note: Released By: JMUNSON
ENGIN1 HOLD 12/23/2020 12/28/2020
Note: Held By: TBAKER No benchmark on survey
LOCATE COMPLETE 12/23/2020 01/05/2021
Note: Released By: TCHURCHILL
MECH COMPLETE 12/23/2020 12/28/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 12/23/2020 01/04/2021
Note: Released By: JPI
SW1 COMPLETE 12/23/2020 12/30/2020
Note: Released By: RGROSS
ZON COMPLETE 12/23/2020 12/28/2020
Note: Released By: ELENS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/09/2022
REINSPECTION RESIDENTIAL ¤40.00 02/09/2022
CONTRACTOR CHANGE ¤40.00 02/04/2022
REINSPECTION FEE ¤40.00 02/04/2022
NEW RESIDENTIAL INSPECTIONS ¤520.00 01/19/2021
SITE PLAN 20 ¤20.00 01/19/2021
SURCHARGE FS 533.721 ¤2.00 01/19/2021
SURCHARGE - FS 468.631 ¤2.00 01/19/2021
STORM WATER PERMIT FEES ¤80.00 01/19/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 01/19/2021
SEWER CREDIT (¤2,109.50) 01/19/2021
SEWER INSPECTION ¤25.00 01/19/2021
SEWER CAPITAL FACILITY ¤4,664.55 01/19/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 01/19/2021
BUILDING DISCOUNT 100% (¤1,292.00) 01/19/2021
ELECTRIC FEE ¤216.00 01/19/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/19/2021
IMPACT FEE FIRE ¤367.00 01/19/2021
IMPACT FEE PARKS ¤1,199.12 01/19/2021
IMPACT FEE SCHOOL ¤3,600.00 01/19/2021
IMPACT FEE TRANSPORTATION ¤1,674.00 01/19/2021
MECHANICAL FEE ¤216.00 01/19/2021
WATER -IRRIGATION INSPECTION ¤25.00 01/19/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/19/2021
PLAN CHECK FEE ¤104.00 01/19/2021
PLUMBING FEE ¤216.00 01/19/2021
CONNECTION FEES ¤1,017.83 01/19/2021
METER - DEPOSIT ¤60.00 01/19/2021
WATER- TURN ON ¤25.00 01/19/2021
ADMIN FEE ¤20.00 01/19/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,131.75