Permit #2020121070
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00120-0130 |
| CONDITIONED SPACE: 1738 sqft |
| GARAGE: 517 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 2482 sqft |
| Block: 00120 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-447-4151 |
| Location Address: 26 FIRCREST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/19/2021 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: VINOCUR ROBERT G & DIANA M VINOCUR H&W |
|
Address 1740 MILLARD AVE MADISON HEIGHTS, MI 48071 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤260,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/09/2022 | PARTIALLY APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 02-08-2022. Energy calculations do not match, AHU and outdoor units model numbers do not match with AHRI. | |||
| BLD - BUILDING FINAL | 02/09/2022 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 02-08-2022. Energy calculations do not match, AHU and outdoor units model numbers do not match with AHRI. | |||
| BLD - BUILDING FINAL | 02/08/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 02-08-2022. Energy calculations do not match, AHU and outdoor units model numbers do not match with AHRI. | |||
| BLD - BUILDING FINAL | 02/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Window in dining room on left side does not lock. 2. Pool bathroom outlet loose. 3. High voltage wire in AHU in garage nor sealed. 4. Bulb not installed in attic. 5. Energy calculations not on site. 6. No hot water. | |||
| U-CROSS CONNECTION | 02/03/2022 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 02/03/2022 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/02/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: looks good at time of inspection just clean out dirt from pipe | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/02/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: at time of inspection everything looks good | |||
| ROW - STORMWATER FINAL | 02/02/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: look good at time of inspection please just clean dirt out of pipe | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/02/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 12/21/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 12/02/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete | |||
| INSULATION | 12/01/2021 | APPROVED - AS NOTED | PBUCKLEY |
| Note: Insulation inspection approved upon receipt of 3rd party energy efficiency / insulation inspection report. | |||
| GRAVITY SEWER TEST | 10/28/2021 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 10/28/2021 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 08/13/2021 | APPROVED | PBUCKLEY |
| ALL ROUGH | 08/06/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 05/27/2021 | APPROVED | BGREVE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2021 | APPROVED - AS NOTED | BGREVE |
| Note: tighten all bolts at bearing wall bottom plate and side wall attachments. all nuts are loose on these connections HIS IS A REINSPECTION no approved drawings onsite no approved truss engineering drawings onsite | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/19/2021 | Disapproved - NO FEE | BGREVE |
| Note: no approved drawings onsite no approved truss engineering drawings onsite | |||
| ELECTRIC TEMP POLE | 05/06/2021 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NO POLE ON SITE | |||
| TIE BEAM / LINTEL | 04/27/2021 | APPROVED | BGREVE |
| FOUND SURVEY APPROVED (OFFICE) | 04/21/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/05/2021 | APPROVED | BGREVE |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/29/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/22/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/08/2022 | 02/08/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/12/2021 | 04/14/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/11/2021 | 01/12/2021 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 12/23/2020 | 01/04/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/23/2020 | 12/28/2020 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 12/23/2020 | 12/28/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | HOLD | 12/23/2020 | 12/28/2020 |
| Note: Held By: TBAKER No benchmark on survey | |||
| LOCATE | COMPLETE | 12/23/2020 | 01/05/2021 |
| Note: Released By: TCHURCHILL | |||
| MECH | COMPLETE | 12/23/2020 | 12/28/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 12/23/2020 | 01/04/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/23/2020 | 12/30/2020 |
| Note: Released By: RGROSS | |||
| ZON | COMPLETE | 12/23/2020 | 12/28/2020 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/09/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/09/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 02/04/2022 |
| REINSPECTION FEE | ¤40.00 | 02/04/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤520.00 | 01/19/2021 |
| SITE PLAN 20 | ¤20.00 | 01/19/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/19/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/19/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 01/19/2021 |
| SEWER CREDIT | (¤2,109.50) | 01/19/2021 |
| SEWER INSPECTION | ¤25.00 | 01/19/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 01/19/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 01/19/2021 |
| BUILDING DISCOUNT 100% | (¤1,292.00) | 01/19/2021 |
| ELECTRIC FEE | ¤216.00 | 01/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/19/2021 |
| IMPACT FEE FIRE | ¤367.00 | 01/19/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 01/19/2021 |
| MECHANICAL FEE | ¤216.00 | 01/19/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/19/2021 |
| PLAN CHECK FEE | ¤104.00 | 01/19/2021 |
| PLUMBING FEE | ¤216.00 | 01/19/2021 |
| CONNECTION FEES | ¤1,017.83 | 01/19/2021 |
| METER - DEPOSIT | ¤60.00 | 01/19/2021 |
| WATER- TURN ON | ¤25.00 | 01/19/2021 |
| ADMIN FEE | ¤20.00 | 01/19/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,131.75 |