Permit #2020121153
Permit Details
Status: COED
| Parcel Id: 06-12-31-5815-00000-0140 |
| Total Square Footage: 6398 sqft |
| Subdivision: 2118 - TOWN CENTER PHASE I |
| Job Phone: 386-677-8736 |
| Location Address: 18 MARKET AVE |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 05/27/2021 |
| NOC: RECORDED |
| Applicant name: LEONARD MARINACCIO III |
| Owner: CAPSTONE PLANNING LLC |
|
Address 31 LUPI COURT STE 120 PALM COAST, FL 32137 |
| Lot: 14 |
| Contracted Stated Job Value: ¤823,640.00 |
| Job Description: Office Building- Capstone Planning |
| Type: CN |
Contractor
BOMAR CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
27 SOUTH ORCHARD STREET ORMOND BEACH, FL 32174 |
CGC1517931 (Exp: 08/31/2026) | 386-677-8736 | 386-677-7726 |
Sub Contractors
MICHAEL WAYNE LYNCH
| Status | Location Address | State License Number | Phone |
| CANCEL |
804 ROOT ST DAYTONA BEACH, FL 32114 |
ER13015553 (Exp: 08/31/2022) | 386-252-2287 |
FREDERICK JOSEPH PREVOST
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
887 BRENTWOOD DRIVE DAYTONA BEACH, FL 0 |
CMC1250152 (Exp: 08/31/2026) | 386-252-7047 | 386-257-7819 |
ISAAC WALTER JOHNSTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
887 BRENTWOOD DRIVE Daytona Beach, FL 32117 |
CFC023634 (Exp: 08/31/2026) | (386) 252-7047 |
STUART A LYONS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
2393 Bellevue Ave. Ext. DAYTONA BEACH, FL 32114 |
CCC032500 (Exp: 08/31/2024) | (386) 257-1007 | (386)257-9040 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 06/30/2022 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION Backflows need to be tested, need wire test and tags. Backflows were tested 6/29/22 | |||
| EXTERIOR ARCHITECTURAL FEATURES | 06/24/2022 | APPROVED | JHARDING |
| U - UTILITY COMMERCIAL FINAL | 06/24/2022 | Disapproved - NO FEE | JHARDING |
| Note: Backflows need to be tested, need wire test and tags | |||
| BUILDING FINAL | 06/24/2022 | FINAL APPROVED | DCUSHING |
| Note: need H/C parking signs prior to Util final | |||
| ELECTRIC FINAL | 06/24/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION NEED ARC SHIELDS IN REST ROOMS NEC 314.20, NEED CORRECT BREAKERS ON AIR HANDLERS, NEED TO HAVE PLAN REVISED SHOW LIGHTING/OUTLET CONTROL SYSTEM CHANGE OR MAKE JOB MATCH PLAN - NEC 406.3 E | |||
| GRAVITY SEWER | 06/22/2022 | APPROVED | MGIBSON |
| PLUMBING FINAL | 06/22/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED SHOCK ARRESTOR FOR FUTURE DISHWASHER LINE,BUY BUILDING FINAL | |||
| HVAC FINAL | 06/21/2022 | FINAL APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION | |||
| HVAC FINAL | 06/14/2022 | Disapproved - NO FEE | CPISCITELLI |
| Note: AHU's call for 45 AMP breakers. There are 60 AMP in panel | |||
| ELECTRIC FINAL | 06/14/2022 | Disapproved - NO FEE | RMARTIN |
| Note: NEED ARC SHIELDS IN REST ROOMS NEC 314.20, NEED CORRECT BREAKERS ON AIR HANDLERS, NEED TO HAVE PLAN REVISED SHOW LIGHTING/OUTLET CONTROL SYSTEM CHANGE OR MAKE JOB MATCH PLAN - NEC 406.3 E | |||
| FIRE FINAL | 06/10/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| FIRE FINAL | 06/09/2022 | CANCELLED BY APPLICANT | RMARTIN |
| BLD - SEWER TIE IN | 06/02/2022 | APPROVED | MGIBSON |
| ABOVE CEILING | 05/17/2022 | APPROVED | JMUNSON |
| Note: THIS IS A REINSPECTION JUST LID OVER DROP CEILING | |||
| ELECTRIC - EARLY POWER | 04/29/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:40 PM | |||
| ROOF VALLEY & METAL | 04/08/2022 | APPROVED | JWALKER |
| LATH/BRICK/WATER BARRIER | 03/25/2022 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 03/21/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Multiple areas of soil have washed into footings. | |||
| ELECTRIC 2ND ROUGH | 03/16/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION LOOKED AT THE LID, OVER THE ABOVE CEILING 3/4/22 marked on print missing | |||
| MONOLITHIC SLAB | 03/16/2022 | Disapproved - NO FEE | JWALKER |
| Note: Multiple areas of soil have washed into footings. | |||
| PLUMBING 2ND ROUGH | 03/04/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION WASTE AND VENT HEAD TEST APPROVED, NEED NAIL PLATES IN MULTIPLE AREAS 2'' ABOVE BOTTOM PLATE AND TOP PLATE BOTH SIDES IN AREAS DISCUSSED WITH PLUMBER | |||
| ELECTRIC 2ND ROUGH | 03/04/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION LOOKED AT THE LID, OVER THE ABOVE CEILING 3/4/22 marked on print missing | |||
| HVAC ROUGH | 03/03/2022 | APPROVED - AS NOTED | CPISCITELLI |
| Note: THIS IS A REINSPECTION ADDED ON 2/2/2022 2:09:24 PM Missing returns in 6 rooms 1- duct in hall not attached Trunk line in back office needs resealing on seam See marking on plans | |||
| PLUMBING 2ND ROUGH | 03/03/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: WASTE AND VENT HEAD TEST APPROVED, NEED NAIL PLATES IN MULTIPLE AREAS 2'' ABOVE BOTTOM PLATE AND TOP PLATE BOTH SIDES IN AREAS DISCUSSED WITH PLUMBER | |||
| FRAMING | 03/03/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Have engineer submitt an as built drawing for bracing the interior steel stud framed walls. Due to the walls not going from ceiling to floor as per the detail. | |||
| INSULATION | 03/03/2022 | APPROVED | JWALKER |
| INSULATION | 02/03/2022 | APPROVED | JWALKER |
| ABOVE CEILING | 02/02/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: JUST LID OVER DROP CEILING | |||
| HVAC ROUGH | 02/02/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: Inspected duct above hard ceiling on front right of building. Need to fix a ripped duct and seal one connectiom | |||
| ELECTRIC 2ND ROUGH | 02/02/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: LOOKED AT THE LID, OVER THE ABOVE CEILING | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 01/24/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1/20/22 The rear canopy. Truss V07,8,9,10,11 are not straped or blocked as per MITek details. Truss T27 missng hold down anchors and one engineering, T28 missing hold down straps. Multiple Meta straps are missing fasteners, 8 fasteners per strap. check all. The 5 Trusses To7 right side of the building out of plumb. Page S0.1 of the prints Note 8 The bottom chord cross bracing not installed. Trusses T22x4, T21, 20,19,18,17,16 right side of building at the girder are not within plumb tolerances and have been set out of layout. Fix all. | |||
| STOREFRONT | 01/21/2022 | APPROVED - AS NOTED | JWALKER |
| Note: This inspection was for window frame fastening. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 01/20/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1/20/22 The rear canopy. Truss V07,8,9,10,11 are not straped or blocked as per MITek details. Truss T27 missng hold down anchors and one engineering, T28 missing hold down straps. Multiple Meta straps are missing fasteners, 8 fasteners per strap. check all. The 5 Trusses To7 right side of the building out of plumb. Page S0.1 of the prints Note 8 The bottom chord cross bracing not installed. Trusses T22x4, T21, 20,19,18,17,16 right side of building at the girder are not within plumb tolerances and have been set out of layout. Fix all. | |||
| ROOF VALLEY & METAL | 01/19/2022 | APPROVED | JWALKER |
| Note: Inspection for ployiso fastening at flat roof. | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 01/06/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACE / TIE DOWN | 01/06/2022 | CANCELLED BY APPLICANT | JWALKER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING | 01/06/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Marked areas of missed nailing with orange paint. There are two area at the bottom of the 10:12 roof right side of the building edge nailing is missing. Not marked Also marked areas where blocking needs to be installed. The plywood at the front gable where it transition from 10:12 to 8 needs to be cut | |||
| ROOF SHEATHING | 01/05/2022 | Disapproved - NO FEE | JWALKER |
| Note: Marked areas of missed nailing with orange paint. There are two area at the bottom of the 10:12 roof right side of the building edge nailing is missing. Not marked Also marked areas where blocking needs to be installed. The plywood at the front gable where it transition from 10:12 to 8 needs to be cut | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 01/05/2022 | CANCELLED BY APPLICANT | JWALKER |
| FOUNDATION SURVEY - OFFICE USE ONLY | 12/13/2021 | APPROVED | DLEAP |
| LINTEL | 12/08/2021 | APPROVED - AS NOTED | JWALKER |
| Note: The expansion joints at the cmu wall have been stopped two courses below the top of wall. Please provide a detail showing the expansion joint is to stop at this height. The contrator is approved to pour, At risk that the expansion joints will need to continue to the top of the CMU wall. . | |||
| DOWN CELL | 12/08/2021 | APPROVED | JWALKER |
| LINTEL | 12/01/2021 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION OK PER PATRICK 11/29/21 The block walls will need to be finished to full height the required 90 degree bend with 8" length and full continous down rods tied to the dowel at the footing will need to be installed as per details. Or have the engineer submitt a revision as to the current way the contractor is wanting to install the steel reinforcing bars. And the separate pour of the mortar 12/1/21 As per engineer revision contractor is approved to pour first lift to 9'8" on the main building 7'8" on the peir and columns. | |||
| LINTEL | 11/29/2021 | Disapproved - NO FEE | JWALKER |
| Note: OK PER PATRICK 11/29/21 The block walls will need to be finished to full height the required 90 degree bend with 8" length and full continous down rods tied to the dowel at the footing will need to be installed as per details. Or have the engineer submitt a revision as to the current way the contractor is wanting to install the steel reinforcing bars. And the separate pour of the mortar | |||
| FOOTER | 11/12/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Soil cave in due to heavy rains. | |||
| MONOLITHIC SLAB | 11/12/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Caves in due to heavy rains. footing filled with water unable to see rebar clearance. | |||
| MONOLITHIC SLAB | 11/08/2021 | CANCELLED BY APPLICANT | JWALKER |
| Note: THIS IS A REINSPECTION Caves in due to heavy rains. footing filled with water unable to see rebar clearance. | |||
| FOOTER | 11/08/2021 | CANCELLED BY APPLICANT | JWALKER |
| Note: THIS IS A REINSPECTION Soil cave in due to heavy rains. | |||
| FOOTER | 11/05/2021 | Disapproved - NO FEE | JWALKER |
| Note: Soil cave in due to heavy rains. | |||
| MONOLITHIC SLAB | 11/05/2021 | Disapproved - NO FEE | JWALKER |
| Note: Caves in due to heavy rains. footing filled with water unable to see rebar clearance. | |||
| ELECTRIC UNDERGROUND | 11/05/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: BONDING STEEL | |||
| ELECTRIC 1ST ROUGH | 10/28/2021 | APPROVED | JMUNSON |
| PLUMBING 1ST ROUGH | 10/28/2021 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 06/15/2022 | 06/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/09/2022 | 06/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/09/2022 | 03/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/26/2022 | 01/27/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/21/2022 | 01/24/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. If Engineer of recorded is certify the control joists, Engineer is to state FS 69G15-29.001 and 69G15-18.011 as well revise the drawing to reflect the changes. | |||
| ELEC | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/14/2021 | 12/15/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 12/13/2021 | 12/13/2021 |
| Note: Released By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 12/06/2021 | 12/08/2021 |
| Note: Held By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM Label Plan as "FOUNDATION SURVEY" | |||
| DSD | COMPLETE | 12/06/2021 | 12/08/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/30/2021 | 11/30/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: Repeat Comments 1. Digital signature on engineer’s letter could not be verified. Please resubmit letter with a digital signature that could be verified. | |||
| BLD | COMPLETE | 11/30/2021 | 12/01/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/29/2021 | 11/30/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/18/2021 | 11/22/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/06/2021 | 07/06/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/18/2021 | 06/21/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Heatload calculation needs to be revised. Origional heatload was submitted for revision | |||
| ARCHR | COMPLETE | 06/01/2021 | 06/15/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/01/2021 | 06/14/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/01/2021 | 06/01/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide updated energy calculations 2. Provide updated heatload calculation 3. Provide sheet A1 showing occupancy changes for ventilation reduction | |||
| PLUM | CANCEL | 06/01/2021 | 06/14/2021 |
| Note: No plumbing revisions submitted. | |||
| FI1 | COMPLETE | 06/01/2021 | 06/08/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/01/2021 | 06/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 02/18/2021 | 03/03/2021 |
| Note: Released By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 02/01/2021 | 02/18/2021 |
| Note: Released By: DRAMIREZ | |||
| ARCHR | COMPLETE | 02/01/2021 | 02/08/2021 |
| Note: Released By: DRAMIREZ | |||
| UD1 | COMPLETE | 02/01/2021 | 02/03/2021 |
| Note: Released By: CJOHNSON | |||
| ELEC | COMPLETE | 02/01/2021 | 02/03/2021 |
| Note: Released By: JMUNSON | |||
| MECH | COMPLETE | 02/01/2021 | 02/02/2021 |
| Note: Released By: CPISCITELLI | |||
| FI1 | HOLD | 02/01/2021 | 02/04/2021 |
| Note: Held By: WMILLER Please move FDC so that it is not blocked by parking. NFPA 24 5.9.5.2 FDC access cannot be obstructed | |||
| BLD | COMPLETE | 02/01/2021 | 02/11/2021 |
| Note: Released By: JPI | |||
| ARCHR | HOLD | 12/28/2020 | 12/28/2020 |
| Note: Held By: DRAMIREZ DO architectural plans must be approved prior to this permit approval. Architectural sheets states that it is sheet A.4 but it was named sheet A.7, please correct naming convention to match the index sheet. | |||
| BLD | HOLD | 12/28/2020 | 01/12/2021 |
| Note: Held By: JPI 1. The review is incomplete at this time. Please address comments and the review will continue. FBC 107.3.5 2. Occupant load calculations on Page TBL and load calculations on A1 and A2 do not match. Please clarify. 3. Clarify the two-tenant use. Will tenants have access to entire building? Concern for bathroom counts and hi-lo use. 4. Provide roof and wall sheathing nailing patterns and provide attachment detail for valley truss. 5. Provide framing details for roof exhaust fan penetrations. Mechanical plans state see structural. 6. Provide locations of all fire extinguishers. 7. Note: Fire sprinkler plans will need to be submitted. 8. Please reply in writing to all comments. | |||
| DSD | HOLD | 12/28/2020 | 12/28/2020 |
| Note: Held By: DRAMIREZ Development Order and Site Development permit must be issued prior to issuance of this permit. | |||
| ELEC | HOLD | 12/28/2020 | 01/05/2021 |
| Note: Held By: JMUNSON 3/0 copper wire is not rated for 400 amps. NEC 2014 310.15 (B) (16) | |||
| FI1 | HOLD | 12/28/2020 | 01/12/2021 |
| Note: Held By: WMILLER 1. on drawing list, life safety plan is indicated as sheet a1, however sheet a4 is the life safety plan, please correct one or the other. 2. please shoe extinguisher location on life safety plan per fbc 2017 section 906 3. please provide fire apparatus access/turn plan using the largest fire department apparatus (sutphen 2011 aerial tower) per ahj. 4. please place a separate note on the cover sheet indicating the need for separate permits for automatic fire suppression systems per ffpc, nfpa 1, fire code section 1.12.8 and fire alarms and detection systems and related equipment per ffpc, nfpa 1, fire code section 1.12.8 5. please upload utily page for review. (need to see the fire lines and fdc's | |||
| MECH | HOLD | 12/28/2020 | 01/06/2021 |
| Note: Held By: CPISCITELLI Provide heatload calculation per C403.2.1 FBC Energy Conservation 2017 6Th Edition | |||
| PLUM | COMPLETE | 12/28/2020 | 01/12/2021 |
| Note: Released By: JPI | |||
| UD1 | HOLD | 12/28/2020 | 01/05/2021 |
| Note: Held By: CJOHNSON Utility fees and agreements shall be complete prior to issuance of the building permit |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/23/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/01/2021 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/29/2021 |
| ADMIN COMMERCIAL | ¤60.00 | 05/27/2021 |
| BUILDING DISCOUNT 100% | (¤7,199.75) | 05/27/2021 |
| ELECTRIC FEE | ¤554.18 | 05/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤113.28) | 05/27/2021 |
| IMPACT FEE FIRE | ¤3,776.00 | 05/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤24,307.20 | 05/27/2021 |
| MECHANICAL FEE | ¤554.18 | 05/27/2021 |
| PERMIT FEE | ¤4,530.02 | 05/27/2021 |
| PLAN CHECK FEE | ¤947.19 | 05/27/2021 |
| PLUMBING FEE | ¤554.18 | 05/27/2021 |
| SITE PLAN 20 | ¤20.00 | 05/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤729.22) | 05/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤27,362.20 |