I want to search for...

Permit #2020121172

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00700-0110
CONDITIONED SPACE: 1238 sqft
GARAGE: 521 sqft
OPENED PORCH (WITH ROOF) : 217 sqft
OPENED PORCH (WITH ROOF) : 42 sqft
Total Square Footage: 2018 sqft
Block: 00700
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 386-447-4151
Location Address: 7 POINCE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/22/2021
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: RODRIGUEZ, ERNESTO & RUTH E

Address

2849 NW 7TH ST

CAPE CORAL, FL 33993

Lot: 0110
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY HOME
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/28/2022 FINAL APPROVED KSANDOE
Note: THIS IS A REINSPECTION Extrerior outlet on rear missing cover Garage door bucking anchors have been cut off to install track brackets. Minimum 3' working clearance required for air handler on all sides
BLD - BUILDING FINAL 02/23/2022 Disapproved - NO FEE KSANDOE
Note: Extrerior outlet on rear missing cover Garage door bucking anchors have been cut off to install track brackets. Minimum 3' working clearance required for air handler on all sides
U -UTILITY RESIDENTIAL FINAL 02/08/2022 FINAL APPROVED DHANEY
U-CROSS CONNECTION 02/08/2022 APPROVED DHANEY
ROW - STORMWATER FINAL 01/18/2022 APPROVED GBERTOLA
Note: 01/18/2022= i just spoke to ELS SAID THE DUMPSTER IS FOR MARONDA AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD REMOVE THE DUMPSTER FROM THE SWALE REPAIR THE SWALE WHERE THE DUMPSTER WAS, WITH SOD, BLEND WITH THE SURROUNDING GRADE 01/18/20222=NEED TO READ THE INPECTOR NOTE
ROW - STORMWATER FINAL 01/18/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: REMOVE THE DUMPSTER FROM THE SWALE REPAIR THE SWALE WHERE THE DUMPSTER WAS, WITH SOD, BLEND WITH THE SURROUNDING GRADE 01/18/20222=NEED TO READ THE INPECTOR NOTE
ROW - FINAL APRON (AFTER POUR) 01/12/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 01/12/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 01/12/2022 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 11/30/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:26 am
ROW- PRE-APRON (PRE-POUR) 11/04/2021 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION Not ready for inspection. Not formed NEED TO MOVE THE WATER BOX OUT OF THE SWALE NEED TO CONTATC THE WATER DEPARTAMENT 11/4/21 - On site with super to remove chipped debri from Garage entrance. Also reminded him that heavy rain in the forecast. Double Check elevations before pouring.
ROW- PRE-APRON (PRE-POUR) 10/21/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: Not ready for inspection. Not formed NEED TO MOVE THE WATER BOX OUT OF THE SWALE NEED TO CONTATC THE WATER DEPARTAMENT
ROW- PRE-APRON (PRE-POUR) 10/14/2021 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 08/31/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVEDON 8/30/21 ALONG WITH GRAVITY SEWER
GRAVITY SEWER TEST 08/30/2021 APPROVED - AS NOTED JGIBSON
Note: BOTH GRAVITY SEWER AND U - SEWER ARE APPROVED
PEP TANK INSTALLATION REQUEST 08/02/2021 APPROVED - AS NOTED CSTONE
Note: dumpster will need to move
LATH/BRICK/ WATER BARRIER 07/14/2021 APPROVED MMESSER
INSULATION 07/07/2021 APPROVED JWALKER
ALL ROUGH 06/28/2021 APPROVED MMESSER
ROW - DRAINAGE 05/11/2021 APPROVED GBERTOLA
Note: DRIANAGE ACROSS THE FRONT SWALE IS OPNE CHECK CONDITION ON THE SWALE
ROOF VALLEY & METAL 04/27/2021 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2021 APPROVED - AS NOTED MMESSER
Note: Add screws to truss strap masonry connection above master shower window (J34).
FOUND SURVEY APPROVED (OFFICE) 04/21/2021 APPROVED TBAKER
ROW - DRAINAGE 04/08/2021 APPROVED - AS NOTED GBERTOLA
Note: DRIANAGE ACROSS THE FRONT SWALE IS OPEN
TIE BEAM / LINTEL 04/08/2021 APPROVED MMESSER
MONOLITHIC SLAB 03/26/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 03/23/2021 APPROVED JGIBSON
ROW - DRAINAGE 03/23/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 3/18/2021 03/18/2021=SILT FENCE IS ON PLACE BUT NEED TO BE BURRIED 4 INCH PLEASE SECURE THE SILT FENCE BURRIED 4 INCH ON THE GROUND MINIMUM 03/23/2021=NEED TO MAINTAIN THE SWALE OPEN BE BACK ON 04-08-2021
ROW - DRAINAGE 03/18/2021 Disapproved - NO FEE GBERTOLA
Note: THIS IS A REINSPECTION NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 3/18/2021 03/18/2021=SILT FENCE IS ON PLACE BUT NEED TO BE BURRIED 4 INCH PLEASE SECURE THE SILT FENCE BURRIED 4 INCH ON THE GROUND MINIMUM BE BACK 03/23/2021
ROW - DRAINAGE 03/09/2021 Disapproved - NO FEE GBERTOLA
Note: NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE BE BACK ON 3/18/2021
ELECTRIC TEMP POLE 03/04/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:52 am
WATER METER INSTALLATION REQUEST 02/11/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/01/2021 10/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/01/2021 10/08/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 10/01/2021 10/01/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 09/20/2021 09/21/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations off from CL of road elecvations by .97'.
ENGIN1 COMPLETE 09/16/2021 09/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/16/2021 09/22/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 09/16/2021 09/16/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/29/2021 05/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/29/2021 04/29/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 04/28/2021 04/28/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ from ITT as-builts by 1.3' +/-
ZON COMPLETE 04/21/2021 04/21/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/21/2021 04/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2021 04/15/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM Per contractor, there is no change to the elevation - they were just submitting a correction to match the floor plan.
BLD COMPLETE 04/09/2021 04/15/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM REVISION - CHANGED MASTER BEDROOM DOOR TO WINDOW.
ELEC COMPLETE 04/09/2021 04/09/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 04/09/2021 04/09/2021
Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM Revised exterior elevation does not have any changes from what was originally approved.
ENGIN1 COMPLETE 01/18/2021 01/19/2021
Note: Released By: TBAKER
ZON COMPLETE 01/18/2021 01/19/2021
Note: Released By: ELENS
SW1 COMPLETE 12/31/2020 12/31/2020
Note: Released By: GBERTOLA
SWALE COMPLETE 12/29/2020 10/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 12/28/2020 12/29/2020
Note: Held By: ELENS Please provide the setback to the front property line. (Cul de Sac) Five trees are required for this site. Robellini Palms are non credit trees. What is EP? (Show on the plan but not in the legend)
BLD COMPLETE 12/28/2020 01/04/2021
Note: Released By: JPI
CUSVC COMPLETE 12/28/2020 12/29/2020
Note: Released By: AROSCOE
ELEC COMPLETE 12/28/2020 12/29/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 12/28/2020 12/29/2020
Note: Released By: TBAKER
LOCATE COMPLETE 12/28/2020 01/06/2021
Note: Released By: CSTONE
MECH COMPLETE 12/28/2020 12/29/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 12/28/2020 01/04/2021
Note: Released By: JPI
ENGIN1 HOLD 12/28/2020 12/29/2020
Note: Held By: TBAKER Centerline of road elevations off by 1.33' from ITT as builts.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/28/2022
SW ENG - FIELD SURVEY INSPECT ¤20.00 02/28/2022
SW ENG REINSPECTION 30 ¤30.00 02/28/2022
STORM WATER PERMIT FEES ¤80.00 01/22/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 01/22/2021
SEWER CREDIT (¤650.00) 01/22/2021
SEWER INSPECTION ¤25.00 01/22/2021
SEWER CAPITAL FACILITY ¤4,664.55 01/22/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 01/22/2021
METER - DEPOSIT ¤60.00 01/22/2021
WATER- TURN ON ¤25.00 01/22/2021
ADMIN FEE ¤20.00 01/22/2021
CONNECTION FEES ¤1,017.83 01/22/2021
BUILDING DISCOUNT 100% (¤914.00) 01/22/2021
ELECTRIC FEE ¤162.00 01/22/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/22/2021
IMPACT FEE FIRE ¤367.00 01/22/2021
IMPACT FEE PARKS ¤1,199.12 01/22/2021
IMPACT FEE SCHOOL ¤3,600.00 01/22/2021
IMPACT FEE TRANSPORTATION ¤1,674.00 01/22/2021
MECHANICAL FEE ¤162.00 01/22/2021
WATER -IRRIGATION INSPECTION ¤25.00 01/22/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/22/2021
PLAN CHECK FEE ¤68.00 01/22/2021
PLUMBING FEE ¤162.00 01/22/2021
NEW RESIDENTIAL INSPECTIONS ¤340.00 01/22/2021
SITE PLAN 20 ¤20.00 01/22/2021
SURCHARGE FS 533.721 ¤2.00 01/22/2021
SURCHARGE - FS 468.631 ¤2.00 01/22/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,528.75