Permit #2020121306
Permit Details
Status: FINAL
| Parcel Id: 09-12-31-0000-02030-0020 |
| Total Square Footage: 3200 sqft |
| Block: 02030 |
| Subdivision: - |
| Job Phone: 407-916-7235 |
| Location Address: 60 MEMORIAL MEDICAL PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 10/14/2021 |
| NOC: Unknown |
| Applicant name: BRUCE ROBERT ADAMS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤2,066,563.00 |
| Job Description: Renovations - Sterile Processing Department |
| Type: CN |
Contractor
THE ROBINS & MORTON GROUP
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
423 S KELLER RD ORLANDO, FL 32810 |
#200 ORLANDO, FL 32810 |
CGC1523017 (Exp: 08/31/2026) | 407-916-7235 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 03/14/2023 | FINAL APPROVED | LFITZGERALD |
| Note: this inspection is on most if not all CIA just as a cover all protection in case water meter's/hydrants or any other water/sewer assembly was utilized. | |||
| BUILDING FINAL | 11/03/2022 | FINAL APPROVED | LMILLER |
| Note: 11/2/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Partial for first pahse only in Copy room, O.R. storage, and First pase of Decon room 7-7-22 partial for Sequence 2 phase 2 9-16-22 partial for phase 2 (approved) 11-2-22 cancelled per Keith, Need to close out progress inspections and sprinkler permit prior' 11-3-22 Final Approved | |||
| FIRE FINAL | 11/03/2022 | CANCELLED BY APPLICANT | WEB |
| FIRE FINAL | 11/03/2022 | APPROVED | LMILLER |
| PLUMBING FINAL | 11/03/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: PER MARK GIBSON ALREADY APPROVED | |||
| HVAC FINAL | 11/03/2022 | FINAL APPROVED | CPISCITELLI |
| ELECTRIC 2ND ROUGH | 11/03/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION marked on teds plan 6/30/22 marked on teds plans | |||
| BUILDING FINAL | 11/02/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Partial for first pahse only in Copy room, O.R. storage, and First pase of Decon room 7-7-22 partial for Sequence 2 phase 2 9-16-22 partial for phase 2 (approved) 11-2-22 cancelled per Keith, Need to close out progress inspections and sprinkler permit prior | |||
| BUILDING FINAL | 09/16/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Partial for first pahse only in Copy room, O.R. storage, and First pase of Decon room 7-7-22 partial for Sequence 2 phase 2 9-16-22 partial for phase 2 (approved) | |||
| ELECTRIC FINAL | 09/16/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION 7/6/22 Soil hold final/partial for SPD renovation | |||
| ABOVE CEILING | 08/18/2022 | APPROVED | RMARTIN |
| ELECTRIC OTHER | 08/17/2022 | APPROVED | RMARTIN |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 3220 THIS NEEDS TO BE AN ABOVE CEILING | |||
| ELECTRIC OTHER | 08/16/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 3220 THIS NEEDS TO BE AN ABOVE CEILING | |||
| HVAC OTHER | 08/15/2022 | APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION Inspected decon room and soil area | |||
| HVAC OTHER | 08/12/2022 | Disapproved - NO FEE | CPISCITELLI |
| Note: Need to seal returns in room and support all flex | |||
| ELECTRIC OTHER | 08/12/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS NEEDS TO BE AN ABOVE CEILING | |||
| PLUMBING OTHER | 08/12/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS INSPECTED AT SECOND ROUGH ABOVE CELING | |||
| FIREWALL FINAL | 08/12/2022 | APPROVED | DCUSHING |
| PLUMBING FINAL | 07/21/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 3080 7/13/22 This inspection was for one wall located in the contamination room . Inspected 1/2"scw, 1/2" hw ,1/2" DI, and 1/2" CA A new Compressed air line located on same wall oppsite side was inspected. At contractors risk the wall may be covered . Submitt a revision to the building department for new compressed air line. Left notes on the PL 103 drawing Level 1 pressure phase 2. DETAIL 3 This was the last partial inspection for test guages on all water dsi, line, compressed air line,hot,cold, . informed c/m that tags would need to be installed and legend for related tags for shut-off valves need to be in place for last plumbing final inspection | |||
| ELECTRIC 2ND ROUGH | 07/20/2022 | CANCELLED BY APPLICANT | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION marked on teds plan 6/30/22 marked on teds plans | |||
| FRAMING | 07/14/2022 | PARTIALLY APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION pending approved documents (one section of firewall only) 2-28-22 notes above resolved Partial framing (phase 1 complete) 6-16-22 need approved revision on site for inspection 6-17-22 partial for revision only 7.14.22 - partial - decon, cartwash areas | |||
| PLUMBING 2ND ROUGH | 07/13/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 7/13/22 This inspection was for one wall located in the contamination room . Inspected 1/2"scw, 1/2" hw ,1/2" DI, and 1/2" CA A new Compressed air line located on same wall oppsite side was inspected. At contractors risk the wall may be covered . Submitt a revision to the building department for new compressed air line. Left notes on the PL 103 drawing Level 1 pressure phase 2. DETAIL 3 | |||
| BUILDING FINAL | 07/07/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION Partial for first pahse only in Copy room, O.R. storage, and First pase of Decon room 7-7-22 partial for Sequence 2 phase 2 | |||
| ABOVE CEILING | 07/06/2022 | APPROVED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS WAS DONE ON 4/5/22 | |||
| ELECTRIC FINAL | 07/06/2022 | PARTIALLY APPROVED | JMUNSON |
| Note: 7/6/22 Soil hold final/partial for SPD renovation | |||
| PLUMBING FINAL | 07/06/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS FOR HYDRANT BOX WITH DRAIN | |||
| HVAC OTHER | 07/06/2022 | APPROVED | CPISCITELLI |
| Note: soil hold area finaled | |||
| ELECTRIC 2ND ROUGH | 06/30/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION marked on teds plan 6/30/22 marked on teds plans | |||
| PLUMBING 2ND ROUGH | 06/30/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Inspector Notes from Inspection 3070 THIS IS A REINSPECTION THIS IS A REINSPECTION rerouting of 4'' sanitary line and rough in 3 compartment sink line THIS WAS A CONTINUE OF SAME LINE WHERE A FLOOR SINK WAS ADDEDED ALONG WITH OTHER LINE FOR SANITARY THIS COMPLETES ALL PHASES OF UNDERGROUND FIRST ROUGH PLUMBING THIS WAS A PARTIAL INSPECTION FOR JUST ONE BOX WITH WASTE AND VENT AND WATER LINE THIS WAS A PARTIAL INSPECTION FOR WASTE AND VENT FOR ONE SINK ONLY THIS WAS A VENT CONNECTION IN CEILING AREA ONLY FOR WALL INSPECTION IONIZED WATER LINES AND PRESSURE GUAGES FOR LINES IN SAME WALL AREA AS BEFORE ARE APPROVED ONLY | |||
| PLUMBING 2ND ROUGH | 06/29/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Inspector Notes from Inspection 3070 THIS IS A REINSPECTION THIS IS A REINSPECTION rerouting of 4'' sanitary line and rough in 3 compartment sink line THIS WAS A CONTINUE OF SAME LINE WHERE A FLOOR SINK WAS ADDEDED ALONG WITH OTHER LINE FOR SANITARY THIS COMPLETES ALL PHASES OF UNDERGROUND FIRST ROUGH PLUMBING THIS WAS A PARTIAL INSPECTION FOR JUST ONE BOX WITH WASTE AND VENT AND WATER LINE THIS WAS A PARTIAL INSPECTION FOR WASTE AND VENT FOR ONE SINK ONLY THIS WAS A VENT CONNECTION IN CEILING AREA ONLY FOR WALL INSPECTION | |||
| PLUMBING 2ND ROUGH | 06/23/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 3070 THIS IS A REINSPECTION THIS IS A REINSPECTION rerouting of 4'' sanitary line and rough in 3 compartment sink line THIS WAS A CONTINUE OF SAME LINE WHERE A FLOOR SINK WAS ADDEDED ALONG WITH OTHER LINE FOR SANITARY THIS COMPLETES ALL PHASES OF UNDERGROUND FIRST ROUGH PLUMBING THIS WAS A PARTIAL INSPECTION FOR JUST ONE BOX WITH WASTE AND VENT AND WATER LINE THIS WAS A PARTIAL INSPECTION FOR WASTE AND VENT FOR ONE SINK ONLY | |||
| FRAMING | 06/21/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION pending approved documents (one section of firewall only) 2-28-22 notes above resolved Partial framing (phase 1 complete) 6-16-22 need approved revision on site for inspection 6-17-22 partial for revision only | |||
| PLUMBING 2ND ROUGH | 06/17/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 3070 THIS IS A REINSPECTION THIS IS A REINSPECTION rerouting of 4'' sanitary line and rough in 3 compartment sink line THIS WAS A CONTINUE OF SAME LINE WHERE A FLOOR SINK WAS ADDEDED ALONG WITH OTHER LINE FOR SANITARY THIS COMPLETES ALL PHASES OF UNDERGROUND FIRST ROUGH PLUMBING THIS WAS A PARTIAL INSPECTION FOR JUST ONE BOX WITH WASTE AND VENT AND WATER LINE | |||
| ELECTRIC 2ND ROUGH | 06/17/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: marked on teds plan | |||
| HVAC ROUGH | 06/17/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION 6/17 inspected fire damper and supply duct phase 2 sequence 1 3/23 tested smoke detectors in unit 3/8 inspected phase 1 supply trunk to be able to wrap 2/8 Inspected phase 1 trunk to be able to wrap 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| FRAMING | 06/16/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION pending approved documents (one section of firewall only) 2-28-22 notes above resolved Partial framing (phase 1 complete) 6-16-22 need approved revision on site for inspection | |||
| MONOLITHIC SLAB | 06/07/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 06/06/2022 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH | 05/19/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION rerouting of 4'' sanitary line and rough in 3 compartment sink line THIS WAS A CONTINUE OF SAME LINE WHERE A FLOOR SINK WAS ADDEDED ALONG WITH OTHER LINE FOR SANITARY THIS COMPLETES ALL PHASES OF UNDERGROUND FIRST ROUGH PLUMBING | |||
| PLUMBING 1ST ROUGH | 05/17/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION rerouting of 4'' sanitary line and rough in 3 compartment sink line THIS WAS A CONTINUE OF SAME LINE WHERE A FLOOR SINK WAS ADDEDED ALONG WITH OTHER LINE FOR SANITARY | |||
| PLUMBING 1ST ROUGH | 05/13/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: rerouting of 4'' sanitary line and rough in 3 compartment sink line | |||
| PLUMBING OTHER | 04/11/2022 | APPROVED - AS NOTED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION WATSTE AND WATER FOR '' EVS '' ROOM ONLY THIS WAS FOR WASTE & VENT WATER IN EVS ROOM IN CEILING AREA ONLY THIS WAS A PARTIAL AREA FOR WATER LINES HOT AND COLD, TWO DROPS FROM CELINNG AREA AND PURIFIED WATER LINES, ABOVE CELING AREA STILL NEEDS TO BE INSULALATED AND FIRE WALL NEEDS TO BE SEALED THIS WAS A PARTIAL INSPECTION FOR DS WATER PRESSURE TEST IN CELING AN PRESSURE TEST FOR WATER LINES IN CEILING 4/11/25 Inspected two hand wash / eye wash sinks and approved them. | |||
| ABOVE CEILING | 04/06/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS WAS DONE ON 4/5/22 | |||
| ABOVE CEILING | 04/04/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION NEED TO LEAVE TILE OUT IN AREAS WHERE DUCTS NOT SEALED, ELECTRIC, PLUMBING ARE GOOD IN THE TWO BACK ROOMS | |||
| ABOVE CEILING | 04/01/2022 | PARTIALLY APPROVED | RMARTIN |
| Note: NEED TO LEAVE TILE OUT IN AREAS WHERE DUCTS NOT SEALED, ELECTRIC, PLUMBING ARE GOOD IN THE TWO BACK ROOMS | |||
| PLUMBING PRESSURE TEST | 03/23/2022 | APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS WAS A PRESSURE TEST ON WATER LINES AND DSI LINES ALL ARE APPROVED Steam lines (4) inspected icluding 100 psi air test for sterlizers. | |||
| HVAC ROUGH | 03/23/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: 3/23 tested smoke detectors in unit 3/8 inspected phase 1 supply trunk to be able to wrap 2/8 Inspected phase 1 trunk to be able to wrap 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| HVAC ROUGH | 03/22/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 3/8 inspected phase 1 supply trunk to be able to wrap 2/8 Inspected phase 1 trunk to be able to wrap 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| HVAC ROUGH | 03/18/2022 | APPROVED - AS NOTED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION partial final for OR storage, copy room, and decontainment room Duct wrap deontamination room 1-1400 and vicinity duct is shown on M101.1 | |||
| PLUMBING 2ND ROUGH | 03/18/2022 | APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A PARTIAL FINAL OF PHASE ONE, STERILE SINK IS TEMPORARY, AND WILL BE RELOCATED TO DIFFERENT LOCATION AT A LATER PHASE | |||
| PLUMBING PRESSURE TEST | 03/15/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS A PRESSURE TEST ON WATER LINES AND DSI LINES ALL ARE APPROVED | |||
| HVAC ROUGH | 03/15/2022 | APPROVED - AS NOTED | PBUCKLEY |
| Note: Test on VAV supply / return lines | |||
| HVAC FINAL | 03/15/2022 | CANCELLED BY APPLICANT | PBUCKLEY |
| Note: THIS IS A REINSPECTION partial final for OR storage, copy room, and decontainment room | |||
| HVAC ROUGH | 03/14/2022 | PARTIALLY APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 3/8 inspected phase 1 supply trunk to be able to wrap 2/8 Inspected phase 1 trunk to be able to wrap 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| HVAC ROUGH | 03/08/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION 3/8 inspected phase 1 supply trunk to be able to wrap 2/8 Inspected phase 1 trunk to be able to wrap 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| PLUMBING 2ND ROUGH | 03/02/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION GEORGE CALLED AND CANCEALED INSPECTION WRONG INSPECTION, THIS WAS A FIRST ROUGH PLUBING INSPECTION THIS IS A PARTIAL INSPECTION FOR WALLS ONLY WASTE AND VENT, WATER LINES OTHER PLUMBING TO BE SCHEDULED AT A LATER DATE | |||
| ELECTRIC 2ND ROUGH | 02/28/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: WALLS ONLY, LOOKED AT FIRE ALARM CONDUIT ALSO | |||
| FRAMING | 02/28/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION pending approved documents (one section of firewall only) 2-28-22 notes above resolved Partial framing (phase 1 complete) | |||
| MONOLITHIC SLAB | 02/22/2022 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH | 02/17/2022 | APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS APPROVED, THIS WILL BE THE FIRST OF ABOUT 5 FIRST ROUGH INSPECTIONS TO BE DONE IN DIFFERENT PHASES this was a partial inspection for 3'' soil stack that is being remove and rerouted into existing wall, also looked at sanitary line tht is being relocated to another area for floor space along with 6'' roofdrain, will inspect at a later time waste line and roof drain are approved, howeverexisting conduit is in the way for plumbing to be copleted to new location og floorsinks and floor drains in other areas RFIS HAVE BEEN SUBMITTED | |||
| PLUMBING 1ST ROUGH | 02/11/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS APPROVED, THIS WILL BE THE FIRST OF ABOUT 5 FIRST ROUGH INSPECTIONS TO BE DONE IN DIFFERENT PHASES this was a partial inspection for 3'' soil stack that is being remove and rerouted into existing wall, also looked at sanitary line tht is being relocated to another area for floor space along with 6'' roofdrain, will inspect at a later time waste line and roof drain are approved, howeverexisting conduit is in the way for plumbing to be copleted to new location og floorsinks and floor drains in other areas RFIS HAVE BEEN SUBMITTED | |||
| PLUMBING 1ST ROUGH | 02/10/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS APPROVED, THIS WILL BE THE FIRST OF ABOUT 5 FIRST ROUGH INSPECTIONS TO BE DONE IN DIFFERENT PHASES this was a partial inspection for 3'' soil stack that is being remove and rerouted into existing wall, also looked at sanitary line tht is being relocated to another area for floor space along with 6'' roofdrain, will inspect at a later time | |||
| HVAC ROUGH | 02/08/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: 2/8 Inspected phase 1 trunk to be able to wrap 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| HVAC ROUGH | 02/01/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION 2/1 inspected wrap in mechanical room 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| HVAC ROUGH | 01/27/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: 1/27 Inspected duct tie in to unit 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| HVAC ROUGH | 01/25/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. 1/25/22 Inspect duct seal on trunks in mechanical room phase 1 | |||
| PLUMBING FINAL | 01/18/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A PARTIAL FINAL OF PHASE ONE, STERILE SINK IS TEMPORARY, AND WILL BE RELOCATED TO DIFFERENT LOCATION AT A LATER PHASE | |||
| BUILDING FINAL | 01/18/2022 | PARTIALLY APPROVED | LMILLER |
| Note: Partial for first pahse only in Copy room, O.R. storage, and First pase of Decon room | |||
| HVAC FINAL | 01/14/2022 | PARTIALLY APPROVED | CPISCITELLI |
| Note: partial final for OR storage, copy room, and decontainment room | |||
| ELECTRIC FINAL | 01/13/2022 | APPROVED | JMUNSON |
| PLUMBING OTHER | 01/03/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION WATSTE AND WATER FOR '' EVS '' ROOM ONLY THIS WAS FOR WASTE & VENT WATER IN EVS ROOM IN CEILING AREA ONLY THIS WAS A PARTIAL AREA FOR WATER LINES HOT AND COLD, TWO DROPS FROM CELINNG AREA AND PURIFIED WATER LINES, ABOVE CELING AREA STILL NEEDS TO BE INSULALATED AND FIRE WALL NEEDS TO BE SEALED THIS WAS A PARTIAL INSPECTION FOR DS WATER PRESSURE TEST IN CELING AN PRESSURE TEST FOR WATER LINES IN CEILING | |||
| HVAC ROUGH | 12/28/2021 | PARTIALLY APPROVED | PBUCKLEY |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. | |||
| HVAC ROUGH | 12/22/2021 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. | |||
| HVAC ROUGH | 12/14/2021 | PARTIALLY APPROVED | CPISCITELLI |
| Note: 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans 12/14 inspected metal taps and metal runs duct seal on supply to be able to wrap. Highlighted on plans. | |||
| PLUMBING OTHER | 12/13/2021 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION WATSTE AND WATER FOR '' EVS '' ROOM ONLY THIS WAS FOR WASTE & VENT WATER IN EVS ROOM IN CEILING AREA ONLY THIS WAS A PARTIAL AREA FOR WATER LINES HOT AND COLD, TWO DROPS FROM CELINNG AREA AND PURIFIED WATER LINES, ABOVE CELING AREA STILL NEEDS TO BE INSULALATED AND FIRE WALL NEEDS TO BE SEALED | |||
| ABOVE CEILING | 12/13/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: PLUMBING MOSTLY | |||
| PLUMBING 2ND ROUGH | 12/09/2021 | CANCELLED BY APPLICANT | MGIBSON |
| Note: THIS IS A REINSPECTION GEORGE CALLED AND CANCEALED INSPECTION WRONG INSPECTION, THIS WAS A FIRST ROUGH PLUBING INSPECTION | |||
| HVAC ROUGH | 12/08/2021 | PARTIALLY APPROVED | CPISCITELLI |
| Note: THIS IS A REINSPECTION 12/2 Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans 12/8 Inspected metal trunk seal to be able to wrap. Inspected wrap on other trunk in same area. Highlighted and noted on plans | |||
| PLUMBING OTHER | 12/08/2021 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION WATSTE AND WATER FOR '' EVS '' ROOM ONLY THIS WAS FOR WASTE & VENT WATER IN EVS ROOM IN CEILING AREA ONLY | |||
| ELECTRIC 2ND ROUGH | 12/08/2021 | APPROVED | RMARTIN |
| ABOVE CEILING | 12/08/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: MEPS MET ON SITE | |||
| MONOLITHIC SLAB | 12/08/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION area marked on plumbing plans 11029-21... detail needs to be approved and on site for inspection. un-approved details on site call for expansion bolts around perimeter, tapcons were used, need approved revision on site matching conditions at site. 12-08-21... notes above resolved | |||
| HVAC ROUGH | 12/02/2021 | PARTIALLY APPROVED | CPISCITELLI |
| Note: Inspect 2 damper openings only (Not Dampers) and metal trunk seal in same area to be able to wrap. Highlighted and noted plans | |||
| PLUMBING OTHER | 12/01/2021 | PARTIALLY APPROVED | MGIBSON |
| Note: WATSTE AND WATER FOR '' EVS '' ROOM ONLY | |||
| MONOLITHIC SLAB | 11/29/2021 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION area marked on plumbing plans 11029-21... detail needs to be approved and on site for inspection. un-approved details on site call for expansion bolts around perimeter, tapcons were used, need approved revision on site matching conditions at site. | |||
| MONOLITHIC SLAB | 11/19/2021 | PARTIALLY APPROVED | LMILLER |
| Note: area marked on plumbing plans | |||
| ELECTRIC 2ND ROUGH | 11/18/2021 | PARTIALLY APPROVED | JMUNSON |
| Note: THIS IS A REINSPECTION NEED APPROVED SET OF PLANS ON SITE FOR INSPECTION, MARKED ON PRINT WALL ONLY 11/18/21 Marked on print walls only | |||
| FIREWALL NAILING | 11/18/2021 | APPROVED | LMILLER |
| Note: looked at drywall of one wall that was inspected for framing prior | |||
| FRAMING | 11/16/2021 | PARTIALLY APPROVED | LMILLER |
| Note: pending approved documents (one section of firewall only) | |||
| ELECTRIC 2ND ROUGH | 11/16/2021 | PARTIALLY APPROVED | RMARTIN |
| Note: NEED APPROVED SET OF PLANS ON SITE FOR INSPECTION, MARKED ON PRINT WALL ONLY | |||
| PLUMBING 1ST ROUGH | 11/15/2021 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS APPROVED, THIS WILL BE THE FIRST OF ABOUT 5 FIRST ROUGH INSPECTIONS TO BE DONE IN DIFFERENT PHASES | |||
| PLUMBING 2ND ROUGH | 11/15/2021 | Disapproved - NO FEE | MGIBSON |
| Note: WRONG INSPECTION, THIS WAS A FIRST ROUGH PLUBING INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/21/2022 | 09/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 09/21/2022 | 09/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/12/2022 | 09/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/12/2022 | 09/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/25/2022 | 08/29/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/19/2022 | 07/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/19/2022 | 07/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 07/19/2022 | 07/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/07/2022 | 07/07/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/22/2022 | 07/06/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/20/2022 | 06/20/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename the files with the plan sheet name - you can add additional information 'after' the plan sheet name, but the file name should be the plan sheet name. | |||
| ELEC | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/13/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/13/2022 | 04/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/13/2022 | 04/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/29/2022 | 03/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/29/2022 | 03/30/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 03/29/2022 | 04/04/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/29/2022 | 03/29/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/29/2022 | 04/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/01/2021 | 12/02/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/01/2021 | 12/07/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FD1 | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 12/01/2021 | 12/07/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 11/24/2021 | 11/29/2021 |
| Note: cancelled to allow for additional information to be uploaded. | |||
| ELEC | CANCEL | 11/24/2021 | 11/29/2021 |
| Note: cancelled to allow for additional information to be uploaded. | |||
| FI1 | CANCEL | 11/24/2021 | 11/29/2021 |
| Note: cancelled to allow for additional information to be uploaded. | |||
| MECH | HOLD | 11/24/2021 | 11/24/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Plans missing from listed revised plans on submission form | |||
| BADMIN | COMPLETE | 04/20/2021 | 04/20/2021 |
| Note: Released By: BARBIE BEMBRY - - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/30/2021 | 04/12/2021 |
| Note: Released By: JPI | |||
| BLD | COMPLETE | 02/16/2021 | 02/19/2021 |
| Note: Released By: JPI | |||
| PLUM | HOLD | 02/16/2021 | 02/19/2021 |
| Note: Held By: JPI 1. Riser Diagram-Gravity, page P801, and 1st Level Plumbing-Gravity-Final Layout, page PS101.3, do not match. A few issues are as follows. Equipment in room 1-1400 Decontamination, per floor plan, are draining to 4” line from Cart wash drain line. Riser illustrates drains will connect to existing 4” line branched from existing 6” main drain line. In riser diagram the existing 4” line in the decontamination room ends in clean out. Not shown on floor plan. Plumbing to and near the Ultrasonic Cleaner, 11-960, does not match. Floor plan illustrates the 4” line running above ceiling branching off the 3” line with equipment not being serviced. Please review all final plumbing plans and match to riser diagrams. 2. Riser Diagram-Pressure is only for 1st Floor. Provide riser for second floor equipment as well. | |||
| BADMIN | HOLD | 02/16/2021 | 03/23/2021 |
| Note: Held By: BARBIE BEMBRY - - BUILDINGDIVISION@PALMCOASTGOV.COM need to provide subcontractors prior to permit issuance. | |||
| BADMIN | HOLD | 01/21/2021 | 02/02/2021 |
| Note: Held By: BBEMBRY will need to provide subcontractors prior to permit issuance. | |||
| BLD | HOLD | 01/21/2021 | 01/28/2021 |
| Note: Held By: JPI 1. Index sheet states Page G502 is to contain U428 and U465 description. Only U465 given. Page G501 A type wall schedule only utilizes U465 wall. Is U465 the only wall used? | |||
| PLUM | HOLD | 01/21/2021 | 01/28/2021 |
| Note: Held By: JPI 1. Riser diagrams page P801 not in set. Please provide. Still not provided. 2. Plumbing lines are running to and from second floor mechanical room from RO/DI equipment. Is floor ceiling assembly a rated assembly? No plans illustrating floor penetrations and protection. Still not provided. | |||
| ELEC | COMPLETE | 01/21/2021 | 01/22/2021 |
| Note: Released By: JMUNSON | |||
| MECH | COMPLETE | 01/21/2021 | 01/22/2021 |
| Note: Released By: CPISCITELLI | |||
| BADMIN | HOLD | 01/11/2021 | 01/11/2021 |
| Note: Held By: BBEMBRY Need to provide all subcontractors. | |||
| BLD | HOLD | 12/30/2020 | 01/12/2021 |
| Note: Held By: JPI 1. Provide door schedule. Page AE601 is a duplicate of AF601 the finish schedule page. Need to verify door ratings. 2. Index sheet states Page G502 is to contain U428 and U465 description. Only U465 given. Page G501 A type wall schedule only utilizes U465 wall. Is this correct? 3. Provide manufacturers cut sheets on all equipment. | |||
| DSD | COMPLETE | 12/30/2020 | 12/30/2020 |
| Note: Released By: JGONZALEZ | |||
| ELEC | COMPLETE | 12/30/2020 | 01/12/2021 |
| Note: Released By: JMUNSON | |||
| FI1 | COMPLETE | 12/30/2020 | 01/15/2021 |
| Note: Released By: JBODEN FIRE PROTECTION SYSTEM REQUIRES A SEPARATE PERMIT | |||
| MECH | COMPLETE | 12/30/2020 | 01/12/2021 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 12/30/2020 | 01/12/2021 |
| Note: Held By: JPI 1. Riser diagrams page P801 is not in the plan set. Please provide. 2. Plumbing lines are running to and from second floor mechanical room from RO/DI equipment. Is floor ceiling assembly a rated assembly? No plans illustrating floor penetrations and protection. | |||
| UD1 | COMPLETE | 12/30/2020 | 01/04/2021 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤65.00 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤0.00 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤65.00 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/13/2023 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 03/13/2023 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 03/13/2023 |
| BUILDING DISCOUNT 100% | (¤20,802.32) | 10/14/2021 |
| ELECTRIC FEE | ¤1,299.94 | 10/14/2021 |
| MECHANICAL FEE | ¤1,299.94 | 10/14/2021 |
| PLAN CHECK FEE | ¤2,376.56 | 10/14/2021 |
| PLUMBING FEE | ¤1,299.94 | 10/14/2021 |
| SITE PLAN 20 | ¤20.00 | 10/14/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/14/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/14/2021 |
| ADMIN COMMERCIAL | ¤60.00 | 10/14/2021 |
| ADMINISTRATIVE - COMMERCIAL | ¤60.00 | 10/14/2021 |
| INSPECTION - COMMERCIAL ADD | ¤14,465.94 | 10/14/2021 |
| INSPECTION- ELECTRICAL | ¤1,299.94 | 10/14/2021 |
| INSPECTION - MECHANICAL | ¤1,299.94 | 10/14/2021 |
| INSPECTION - PLUMBING | ¤1,299.94 | 10/14/2021 |
| PLAN REVIEW - COMMERCIAL | ¤2,376.56 | 10/14/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤6,935.38 |