Permit #2021010163
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00040-0150 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 504 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3729 sqft |
| Block: 00040 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 386-627-0430 |
| Location Address: 4 BARON WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/02/2021 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX REMODELING INC A FLORIDA CORP |
|
Address 72 HERNANDEZ AVENUE PALM COAST, FL 32137 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤280,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/04/2022 | FINAL APPROVED | KSANDOE |
| U-CROSS CONNECTION | 02/03/2022 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/03/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/03/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: looks good at time of inspection | |||
| ROW - STORMWATER FINAL | 02/03/2022 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 02/03/2022 | FINAL APPROVED | DHANEY |
| FINAL SURVEY (OFFICE USE ONLY) | 02/02/2022 | APPROVED | STHOMAS |
| ELECTRIC - EARLY POWER | 10/28/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: emailed fpl released power 11:20 | |||
| ROW- PRE-APRON (PRE-POUR) | 09/17/2021 | APPROVED - AS NOTED | KRUTH |
| Note: contractor decided to go without a culvert | |||
| ROW - DRAINAGE | 07/06/2021 | APPROVED - AS NOTED | KRUTH |
| Note: met on site with builder to try and figure out a new drainage plan it is getting revised now by engeneering | |||
| U - SEWER TIE IN | 06/21/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 06/21/2021 | APPROVED | JGIBSON |
| INSULATION | 06/08/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 05/28/2021 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 05/28/2021 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 04/30/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:08 am | |||
| ROOF VALLEY & METAL | 04/28/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/20/2021 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 03/31/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION WINDOW SILL BED JOINTS EXCEED RBC R606.3.1 (3/8" TO 1/2") ALL BED JOINTS MARKED ,IN ORANGE, ON WALL ARE 1" AND OVER. 3/31/21 - Items Corrected. | |||
| TIE BEAM / LINTEL | 03/29/2021 | Disapproved - NO FEE | FWILLIS |
| Note: WINDOW SILL BED JOINTS EXCEED RBC R606.3.1 (3/8" TO 1/2") ALL BED JOINTS MARKED ,IN ORANGE, ON WALL ARE 1" AND OVER. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/26/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/11/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION NEED APPROVED DOCUMENT SITE FOR INSPECTION 107.3,1. | |||
| MONOLITHIC SLAB | 03/10/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED APPROVED DOCUMENT SITE FOR INSPECTION 107.3,1. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/04/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/17/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/25/2021 | 03/25/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/25/2021 | 03/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| MECH | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 01/21/2021 | 01/21/2021 |
| Note: Released By: JMUNSON | |||
| MECH | HOLD | 01/21/2021 | 01/21/2021 |
| Note: Held By: CPISCITELLI Orientation of Energy calcs does not match the site plan. Revise to match the site plan. | |||
| SW1 | COMPLETE | 01/21/2021 | 01/25/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 01/21/2021 | 01/25/2021 |
| Note: Held By: ELENS Repeat comment: The garage must be equipped with a standard garage door: 4.19.02. Model homes... 3. The garage...may be used as an office for sales staff if separate off-street parking is provided. 4. The garage must be equipped with a standard garage door, unless dedicated off-site parking is provided, excluding rights-of-ways. (Cannot do the "Additional Off Street Parking" proposed on the revised site plan. It can only be a 9’ X 18’ Turnaround. A turnaround will not be considered dedicated off street/off site parking.) | |||
| PLUM | COMPLETE | 01/21/2021 | 01/25/2021 |
| Note: Released By: JPI | |||
| BLD | COMPLETE | 01/21/2021 | 01/25/2021 |
| Note: Released By: JPI | |||
| TRENG | COMPLETE | 01/21/2021 | 01/27/2021 |
| Note: Released By: LMUSGROVE PER MIKE IN TRAFFIC ENGINEERING-NO REVIEW NEEDED ANYMORE SINE THE EXIT HAS BEEN REMOVED FROM PINE LAKES PWY | |||
| TRENG | HOLD | 01/08/2021 | 01/19/2021 |
| Note: Held By: MGRUNEWALD Driveway access to Pine Lakes Drive is not allowed. Revise and resubmit. | |||
| BLD | HOLD | 01/06/2021 | 01/13/2021 |
| Note: Held By: JPI 1. Drawing 10 Simpson Strap table is unreadable, as are other areas of the drawing | |||
| CUSVC | COMPLETE | 01/06/2021 | 01/11/2021 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 01/06/2021 | 01/07/2021 |
| Note: Held By: JMUNSON Need smoke alarms inside and outside of back bedroom. FRC 2020 314.1 315.1 | |||
| ENGIN1 | COMPLETE | 01/06/2021 | 01/06/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/06/2021 | 01/08/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 01/06/2021 | 01/07/2021 |
| Note: Held By: CPISCITELLI Energy Calcs need to be from new code cycle. 2020 7Th edition | |||
| PLUM | HOLD | 01/06/2021 | 01/13/2021 |
| Note: Held By: JPI 1. Attach plumbing riser diagram. | |||
| SW1 | HOLD | 01/06/2021 | 01/08/2021 |
| Note: Held By: CTROHA Pending driveway approval into turn lane | |||
| ZON | HOLD | 01/06/2021 | 01/06/2021 |
| Note: Held By: ELENS Banding is required on all windows and doors facing a public right of way.(Front, left and rear elevations.) Please label as such. The garage cannot be labeled as temporary office The garage must be equipped with a standard garage door: 4.19.02. Model homes... 3. The garage...may be used as an office for sales staff if separate off-street parking is provided. 4. The garage must be equipped with a standard garage door, unless dedicated off-site parking is provided, excluding rights-of-ways. | |||
| SWALE | COMPLETE | 01/06/2021 | 04/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 02/06/2022 |
| REINSPECTION FEE | ¤40.00 | 02/06/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤646.00 | 02/02/2021 |
| SITE PLAN 20 | ¤20.00 | 02/02/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/02/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/02/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/02/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/02/2021 |
| SEWER CREDIT | (¤1,147.00) | 02/02/2021 |
| SEWER INSPECTION | ¤25.00 | 02/02/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 02/02/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 02/02/2021 |
| BUILDING DISCOUNT 100% | (¤1,556.60) | 02/02/2021 |
| ELECTRIC FEE | ¤253.80 | 02/02/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 02/02/2021 |
| IMPACT FEE FIRE | ¤367.00 | 02/02/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 02/02/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/02/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/02/2021 |
| MECHANICAL FEE | ¤253.80 | 02/02/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/02/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 02/02/2021 |
| PLAN CHECK FEE | ¤129.20 | 02/02/2021 |
| PLUMBING FEE | ¤253.80 | 02/02/2021 |
| METER - DEPOSIT | ¤60.00 | 02/02/2021 |
| WATER- TURN ON | ¤25.00 | 02/02/2021 |
| ADMIN FEE | ¤20.00 | 02/02/2021 |
| CONNECTION FEES | ¤1,017.83 | 02/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,064.43 |