Permit #2021010200
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01410-0100 |
| CONDITIONED SPACE: 2081 sqft |
| GARAGE: 623 sqft |
| OPENED PORCH (WITH ROOF) : 159 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| Total Square Footage: 2897 sqft |
| Block: 01410 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386) 672-8285 |
| Location Address: 3 EDITH LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/26/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: TERRY & THERESA RUSSEL |
|
Address 124 RIPPAVILLA STREET SALTILLO, MS 38866 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤188,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/26/2021 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 10/21/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 10/21/2021 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 10/21/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/19/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Landscaping and mulch in the left side easement will need removed before the Final Stormwater can be. On site with super. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/19/2021 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 10/06/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ELECTRIC - EARLY POWER | 07/14/2021 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 06/30/2021 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 06/29/2021 | APPROVED | RGROSS |
| Note: READY TO POUR at the time of inspeciton. Heavy rain in the forecast. Builder should double check elevatons before pouring. | |||
| GRAVITY SEWER TEST | 06/23/2021 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 06/18/2021 | CANCELLED BY INSPECTOR | JGIBSON |
| Note: THIS INSPECTION NEEDS TO BE SCHEDULED THROUGH PRIVATE PROVIDER. U-SEWER TIE IN WILL BE INSPECTED BY CITY OF PALM COAST FOR THE REASON OF CONNECTING TO CITY SEWER | |||
| U - SEWER TIE IN | 06/18/2021 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 05/06/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 05/04/2021 | Approval - Private Provider | PPROVIDER |
| INSULATION | 04/29/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 04/28/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/27/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/26/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 03/18/2021 | Disapproved- Private Provider | PPROVIDER |
| Note: Tie beam/lintel inspection failed. Several retrofit dowels from the slab need to be set in epoxy | |||
| TIE BEAM / LINTEL | 03/18/2021 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 3/19/2021 11:19:42 AM Tie beam/lintel inspection failed. Several retrofit dowels from the slab need to be set in epoxy | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/04/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/17/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/15/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 01/29/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/03/2021 | 03/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | COMPLETE | 03/03/2021 | 03/03/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/26/2021 | 01/26/2021 |
| Note: Released By: ELENS | |||
| ZON | HOLD | 01/15/2021 | 01/19/2021 |
| Note: Held By: ELENS Repeat comment: Please correct mislabeled elevations. | |||
| ENGIN1 | COMPLETE | 01/15/2021 | 01/19/2021 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/15/2021 | 01/21/2021 |
| Note: Released By: KRUTH | |||
| SWALE | COMPLETE | 01/07/2021 | 04/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/06/2021 | 01/11/2021 |
| Note: Released By: HHAND | |||
| ENGIN1 | COMPLETE | 01/06/2021 | 01/07/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/06/2021 | 01/08/2021 |
| Note: Released By: CSTONE | |||
| SW1 | COMPLETE | 01/06/2021 | 01/11/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 01/06/2021 | 01/06/2021 |
| Note: Held By: ELENS Need to correct FEMA map panel number in the site plan notes (...0226E) Please correct mislabeled elevations. Square footage totals 2907 (not 2897) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/26/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/26/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/26/2021 |
| SEWER CREDIT | (¤850.00) | 01/26/2021 |
| SEWER INSPECTION | ¤25.00 | 01/26/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 01/26/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 01/26/2021 |
| METER - DEPOSIT | ¤60.00 | 01/26/2021 |
| METER - DEPOSIT | ¤60.00 | 01/26/2021 |
| WATER-METER | ¤441.07 | 01/26/2021 |
| WATER- TURN ON | ¤25.00 | 01/26/2021 |
| WATER- TURN ON | ¤25.00 | 01/26/2021 |
| CONNECTION FEES | ¤1,017.83 | 01/26/2021 |
| BUILDING DISCOUNT 100% | (¤125.00) | 01/26/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/26/2021 |
| IMPACT FEE FIRE | ¤367.00 | 01/26/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/26/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/26/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 01/26/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/26/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/26/2021 |
| PERMIT FEE | ¤125.00 | 01/26/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/26/2021 |
| SITE PLAN 20 | ¤20.00 | 01/26/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/26/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/26/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,852.50 |