I want to search for...

Permit #2021010584

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7034-01020-0090
SCREEN PORCH (SOLID ROOF) : 840 sqft
Total Square Footage: 840 sqft
Block: 01020
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: (386)246-9986
Location Address: 98 EVANS DR
Type: PO - POOL
Issue Date: 05/19/2021
NOC: RECORDED
Applicant name: MICHAEL L RYAN
Owner: MORTON MATTHEW T & WENDY A MORTON H&W

Address

98 EVANS DRIVE

PALM COAST, FL 32164

Lot: 0090
Contracted Stated Job Value: ¤33,450.00
Job Description: SWIMMING POOL / SCREEN ENCLOSURE
Type: CN

Contractor

OHANU WATERS , INC
Status Location Address Mailing Address State License Number Phone Fax
INACTIVE

4490 N US 1

PALM COAST, FL 32164

SUITE 109

PALM COAST, FL 32164

CPC1457377 (Exp: 08/31/2024) (386)246-9986 (386)246-5374

Sub Contractors

JOSEPH DEREK CARTWRIGHT
Status Location Address State License Number Phone Fax
ACTIVE

151 RODEO ROAD

ORMOND BEACH, FL 32174

SCC131150000 (Exp: 08/31/2026) 386-310-7962 (386)615-3713
RICHARD R EDWARDS
Status Location Address State License Number Phone
ACTIVE

P. O. Box 1637

Bunnell, FL 32110

EC13010654 (Exp: 08/31/2026) (386) 437-1537

Inspection History

Type Request Date Result Inspector
POOL FINAL 08/08/2022 FINAL APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Pool alarm not installed unable to test.
POOL FINAL 07/08/2022 Disapproved - NO FEE JWALKER
Note: Pool alarm not installed unable to test.
U -UTILITY RESIDENTIAL FINAL 04/07/2022 FINAL APPROVED JHARDING
ROW - FINAL INSPECTION 04/06/2022 APPROVED PFLANAGAN
ELECTRIC AND ALARM 03/03/2022 APPROVED - AS NOTED JMUNSON
Note: Pool alarm on site test on final
FINAL SURVEY (OFFICE USE ONLY) 12/22/2021 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 12/22/2021 APPROVED RGROSS
POOL DECK 09/08/2021 APPROVED TSTAUFFACHER
STEEL AND GROUND 05/27/2021 APPROVED TSTAUFFACHER

Review History

Department Status Date In Date Out
BLD COMPLETE 02/11/2021 02/11/2021
Note: Released By: PBUCKLEY
ELEC COMPLETE 02/02/2021 02/02/2021
Note: Released By: JMUNSON
BLD HOLD 02/02/2021 02/09/2021
Note: Held By: FREODICA 1. Master file of engineered pool plans can be used only after they are reviewed and approved with stamped for code compiance. The master file plans procedures are disussed below on item 3 below. 2. Review comments on submited master plans - General Notes (12), (13) & (14) a. Chapter 42 on 2020 FBC -Residential has been deleted. Keep Chapter 45 as Referenced Code to 2020 FBC- Residential or 7th Edition. b. Revise Electrical Code from 2014 to 2017 NEC on item (14). 3. Here is how we will treat pool master plan submittals. • All submittals will be done outside the CD Plus permitting system, submitted by email only. • Emailed plans are digital / electronic plans and shall have a verifiable digital seal and signature with date. • Plans shall include the name Master Plans or Master Pool Plans or similar and include a note or notes deemed necessary by the engineer indicating they are approved for repeated use by the pool contractor. The engineer can include an expiration date and other information the engineer wants to add. • Emailed submittals will be directly to me or to permit technician for review. . • Review comments will be emailed to the applicant and the applicant will send revised (digitally sealed plans) • When the review is completed and plans are ready to for approval, an email will be sent to the applicant letting them know to print out paper copies with ink or raised / embossed seal and signature with date and to bring them to the office for the City to add its approval stamp. • Plans with City approval stamp will be returned to the applicant. • Applicant can print photo-copies of the approved plans for use on site(s) for inspection. FReodica -386-986-4734.
BLD HOLD 01/15/2021 01/25/2021
Note: Held By: FREODICA Pool plan -Sheet 1 of 4: Provide Updated Referenced Code on General Notes items 12, 13 and 14. FReodica -386-986-4734
ELEC HOLD 01/15/2021 01/19/2021
Note: Held By: JMUNSON Need to reference the 2017 NEC
MECH COMPLETE 01/15/2021 01/20/2021
Note: Released By: CPISCITELLI
SW1 COMPLETE 01/15/2021 01/15/2021
Note: Released By: CTROHA
ZON COMPLETE 01/15/2021 01/15/2021
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/07/2022
BUILDING DISCOUNT 100% (¤220.00) 05/19/2021
PERMIT FEE ¤160.00 05/19/2021
PLAN CHECK FEE ¤40.00 05/19/2021
SITE PLAN 20 ¤20.00 05/19/2021
SURCHARGE FS 533.721 ¤2.00 05/19/2021
SURCHARGE - FS 468.631 ¤2.00 05/19/2021
STORM WATER PERMIT FEES ¤80.00 05/19/2021
ADMIN FEE ¤20.00 05/19/2021
Fees Total Due: ¤0.00 Total Paid: ¤144.00