I want to search for...

Permit #2021010673

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00560-0170
CONDITIONED SPACE: 1817 sqft
GARAGE: 433 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
Total Square Footage: 2474 sqft
Block: 00560
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: (386)437-1508
Location Address: 29 RANSHIRE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/03/2021
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: NOGUEIRA JOSE F & MARIA J

Address

1094 EAST STREET

LUDLOW, MA 01056

Lot: 0170
Contracted Stated Job Value: ¤190,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/13/2021 FINAL APPROVED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Hot water is not working The two outlets in the laundry room are not GFIC protected Please insure all breakers are listed properly. The vent at the exterior soffit is hanging down. 10/11/21 Hot water heater is not supplying hot water and appears to have leak.
ROW- PROJECT STATUS 10/11/2021 APPROVED - AS NOTED GBERTOLA
Note: BUILDER ASK ME IF I CAN STOP BY AND LOOK AT THE SWALE GRADING IT LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 10/11/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION FRONT SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE, 10/11/2021=CORRECTION WERE MADE
ROW - STORMWATER FINAL 10/11/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION FRONT SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE, SWALE NEED TO FILL UP WITH SOME DIRT TO LOW GOING TO HOLD WATER 10/11/2021= NEED TO REMOVED THE CONCRETE INSIDE THE CULVERT ON THE RIGHT SIDE 10/11/2021=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
BLD - BUILDING FINAL 10/11/2021 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION Hot water is not working The two outlets in the laundry room are not GFIC protected Please insure all breakers are listed properly. The vent at the exterior soffit is hanging down. 10/11/21 Hot water heater is not supplying hot water and appears to have leak.
BLD - BUILDING FINAL 10/08/2021 Disapproved - NO FEE JWALKER
Note: Hot water is not working The two outlets in the laundry room are not GFIC protected Please insure all breakers are listed properly. The vent at the exterior soffit is hanging down.
GRAVITY SEWER TEST 10/06/2021 APPROVED MGIBSON
U -UTILITY RESIDENTIAL FINAL 10/06/2021 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 10/06/2021 Disapproved - NO FEE GBERTOLA
Note: FRONT SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE, SWALE NEED TO FILL UP WITH SOME DIRT TO LOW GOING TO HOLD WATER
ROW - FINAL APRON (AFTER POUR) 10/06/2021 APPROVED - AS NOTED GBERTOLA
Note: CULVERT PIPE IS GOOD
U - SEWER TIE IN 10/06/2021 APPROVED MGIBSON
U-CROSS CONNECTION 10/06/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 10/05/2021 Disapproved - NO FEE GBERTOLA
Note: FRONT SWALE NEED TO BE MATCH EXISTING GRADE AT EACH PROPERTY LINE,
FINAL SURVEY (OFFICE USE ONLY) 10/05/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 09/10/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:48 am
ROW- PRE-APRON (PRE-POUR) 08/10/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING
ROW- PRE-APRON (PRE-POUR) 08/09/2021 CANCELLED BY APPLICANT WEB
INSULATION 06/30/2021 APPROVED MMESSER
INSULATION 06/25/2021 CANCELLED BY APPLICANT WEB
PEP TANK INSTALLATION REQUEST 06/21/2021 APPROVED - AS NOTED CSTONE
Note: Dumpster will need to move
ALL ROUGH 06/17/2021 APPROVED MMESSER
ROOF VALLEY & METAL 06/15/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION Underlayment not properly fastened at required distances 6" on the laps and edges 12" in the field Valley lining self adhering 36" wide is applied over the snythethic apply valley lining to roof deck and run synthetic underlayment over top of self adhering avoid nails within 6" of valley center.
LATH/BRICK/ WATER BARRIER 06/15/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION No lath installed.
ROOF VALLEY & METAL 06/11/2021 Disapproved - NO FEE JWALKER
Note: Underlayment not properly fastened at required distances 6" on the laps and edges 12" in the field Valley lining self adhering 36" wide is applied over the snythethic apply valley lining to roof deck and run synthetic underlayment over top of self adhering avoid nails within 6" of valley center.
LATH/BRICK/ WATER BARRIER 06/09/2021 Disapproved -FEE REQUIRED JWALKER
Note: No lath installed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/24/2021 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 04/20/2021 APPROVED TBAKER
TIE BEAM / LINTEL 04/01/2021 APPROVED MMESSER
MONOLITHIC SLAB 03/22/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 03/15/2021 APPROVED JBODEN
WATER METER INSTALLATION REQUEST 03/03/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/19/2021 04/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/19/2021 04/19/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 02/17/2021 02/17/2021
Note: Released By: MDEFREITAS NOC RECORDED DATE IS CUT OFF PLEASE RESEND.
MECH COMPLETE 02/03/2021 02/03/2021
Note: Released By: CPISCITELLI
ZON COMPLETE 01/27/2021 01/27/2021
Note: Released By: ELENS
CUSVC COMPLETE 01/25/2021 01/29/2021
Note: Released By: HHAND
ENGIN1 COMPLETE 01/25/2021 01/26/2021
Note: Released By: TBAKER
ZON HOLD 01/25/2021 01/25/2021
Note: Held By: ELENS Repeat comment: A second form of articulation is required: Land Development Code: 13.03.03. Facade design. B.Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least two feet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas.
MECH HOLD 01/25/2021 01/25/2021
Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder (Second Request)
BLD COMPLETE 01/25/2021 01/26/2021
Note: Released By: JPI
SWALE COMPLETE 01/20/2021 04/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 01/20/2021 01/20/2021
Note: Held By: TBAKER Survey elevations differ from ITT as-builts by 1.7'
BLD HOLD 01/19/2021 01/20/2021
Note: Held By: JPI 1. Detail #4 on page A-5 illustrates truss bearing at 8 foot. Page A-3 illustrates entry truss bearing at 10’-8”. Please clarify and correct drawings. 2. Provide details for dwelling-garage fire separation. 3. Product approval missing item: Dens Glass. 4. Truss plans indicate wall at entry door to be at 10’-8”. Floor plan illustrates wall at 8’. Please clarify and/or correct.
CUSVC HOLD 01/19/2021 01/19/2021
Note: Held By: HHAND Please upload a new utility application with the correct parcel number.
ELEC COMPLETE 01/19/2021 01/20/2021
Note: Released By: JMUNSON
ENGIN1 COMPLETE 01/19/2021 01/20/2021
Note: Released By: TBAKER
LOCATE COMPLETE 01/19/2021 01/20/2021
Note: Released By: CSTONE
MECH HOLD 01/19/2021 01/20/2021
Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder
PLUM COMPLETE 01/19/2021 01/20/2021
Note: Released By: JPI
SW1 COMPLETE 01/19/2021 01/21/2021
Note: Released By: KRUTH
ZON HOLD 01/19/2021 01/20/2021
Note: Held By: ELENS A second form of articulation is required: Land Development Code: 13.03.03. Facade design. B.Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least two feet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 10/13/2021
REINSPECTION FEE ¤40.00 10/13/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 10/13/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 10/13/2021
STORM WATER PERMIT FEES ¤80.00 02/03/2021
SEWER CREDIT (¤1,466.00) 02/03/2021
SEWER INSPECTION ¤25.00 02/03/2021
SEWER CAPITAL FACILITY ¤4,664.55 02/03/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 02/03/2021
NEW RESIDENTIAL INSPECTIONS ¤458.00 02/03/2021
SITE PLAN 20 ¤20.00 02/03/2021
SURCHARGE FS 533.721 ¤2.00 02/03/2021
SURCHARGE - FS 468.631 ¤2.00 02/03/2021
CONNECTION FEES ¤1,017.83 02/03/2021
BUILDING DISCOUNT 100% (¤1,161.80) 02/03/2021
ELECTRIC FEE ¤197.40 02/03/2021
IMPACT FEE FIRE ¤367.00 02/03/2021
IMPACT FEE PARKS ¤1,199.12 02/03/2021
IMPACT FEE SCHOOL ¤3,600.00 02/03/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 02/03/2021
MECHANICAL FEE ¤197.40 02/03/2021
WATER -IRRIGATION INSPECTION ¤25.00 02/03/2021
PLAN CHECK FEE ¤91.60 02/03/2021
PLUMBING FEE ¤197.40 02/03/2021
METER - DEPOSIT ¤60.00 02/03/2021
WATER- TURN ON ¤25.00 02/03/2021
ADMIN FEE ¤20.00 02/03/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,883.95