I want to search for...

Permit #2021010691

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00120-0050
CONDITIONED SPACE: 2108 sqft
GARAGE: 412 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
OPENED PORCH (WITH ROOF) : 240 sqft
Total Square Footage: 2832 sqft
Block: 00120
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 386-960-7720
Location Address: 10 SEVEN OAKS PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/27/2021
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC

Address

620 MALABAR ROAD SE STE 5

PALM BAY, FL 32907

Lot: 0050
Contracted Stated Job Value: ¤246,950.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191
DOUGLAS EDWARD RICHARDS
Status Location Address State License Number Phone Fax
INACTIVE

108 E INDIANA AVENUE

DELAND, FL 32724

CCC1328824 (Exp: 08/31/2024) 386-736-4226 386-740-0535
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/19/2021 FINAL APPROVED TSTAUFFACHER
U -UTILITY RESIDENTIAL FINAL 10/19/2021 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 10/18/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. The fall in the swale is in the wrong direction please. Need re grading the swale. Need positive fall in the direction described in the swale plan. ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED 10/18/2021=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 10/18/2021 APPROVED - AS NOTED GBERTOLA
Note: INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. The fall in the swale is in the wrong direction please. Need re grading the swale. Need positive fall in the direction described in the swale plan. ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED 10/18/2021=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 10/18/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 10/18/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. YOU NEED TO MATCH EXISTING GRADE ON THE LEFT SIDE ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED 10/18/2021=CORRECTION WERE MADE
FINAL SURVEY (OFFICE USE ONLY) 10/13/2021 CANCELLED BY APPLICANT RGROSS
Note: THIS IS A REINSPECTION INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. YOU NEED TO MATCH EXISTING GRADE ON THE LEFT SIDE ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED
FINAL SURVEY (OFFICE USE ONLY) 10/07/2021 Disapproved - NO FEE GBERTOLA
Note: INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. YOU NEED TO MATCH EXISTING GRADE ON THE LEFT SIDE ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED
ROW FIELD SURVEY /GRADING CERTIFICATION 10/07/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. The fall in the swale is in the wrong direction please. Need re grading the swale. Need positive fall in the direction described in the swale plan. ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED
ROW- PRE-APRON (PRE-POUR) 08/20/2021 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 08/06/2021 APPROVED JGIBSON
U-CROSS CONNECTION 08/06/2021 APPROVED - AS NOTED JHARDING
Note: No irrigation,no cross connections.
GRAVITY SEWER TEST 08/06/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 07/07/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION House needs to be unlocked
ELECTRIC - EARLY POWER 07/06/2021 Disapproved -FEE REQUIRED JMUNSON
Note: House needs to be unlocked
LATH/BRICK/ WATER BARRIER 05/13/2021 APPROVED TSTAUFFACHER
INSULATION 05/12/2021 APPROVED TSTAUFFACHER
ALL ROUGH 05/07/2021 APPROVED TSTAUFFACHER
ROOF VALLEY & METAL 05/03/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 04/29/2021 APPROVED TBAKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Text at 8.19 AM
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/19/2021 CANCELLED BY APPLICANT TSTAUFFACHER
Note: Text at 8.19 AM
TIE BEAM / LINTEL 04/09/2021 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 03/31/2021 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 03/26/2021 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 03/22/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 03/01/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN COMPLETE 03/20/2026 03/20/2026
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BADMIN HOLD 10/18/2021 10/18/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT FBC2020 BLOWER DOOR TEST FORM, NOT 2017
ENGIN1 COMPLETE 04/29/2021 04/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/29/2021 04/29/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 01/25/2021 01/25/2021
Note: Released By: GBERTOLA
SWALE COMPLETE 01/20/2021 04/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/19/2021 01/20/2021
Note: Released By: AMOBLEY
BLD COMPLETE 01/19/2021 01/20/2021
Note: Released By: JPI
CUSVC COMPLETE 01/19/2021 01/22/2021
Note: Released By: HHAND
ELEC COMPLETE 01/19/2021 01/20/2021
Note: Released By: JMUNSON
ENGIN1 COMPLETE 01/19/2021 01/20/2021
Note: Released By: TBAKER
LOCATE COMPLETE 01/19/2021 01/20/2021
Note: Released By: CSTONE
MECH COMPLETE 01/19/2021 01/20/2021
Note: Released By: CPISCITELLI
PLUM COMPLETE 01/19/2021 01/20/2021
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - FIELD SURVEY INSPECT ¤20.00 10/19/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 10/19/2021
REINSPECTION FEE ¤40.00 10/19/2021
NEW RESIDENTIAL INSPECTIONS ¤526.00 01/27/2021
SITE PLAN 20 ¤20.00 01/27/2021
SURCHARGE FS 533.721 ¤2.00 01/27/2021
SURCHARGE - FS 468.631 ¤2.00 01/27/2021
STORM WATER PERMIT FEES ¤80.00 01/27/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/27/2021
SEWER CREDIT (¤850.00) 01/27/2021
SEWER INSPECTION ¤25.00 01/27/2021
SEWER CAPITAL FACILITY ¤4,664.55 01/27/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 01/27/2021
METER - DEPOSIT ¤60.00 01/27/2021
WATER- TURN ON ¤25.00 01/27/2021
ADMIN FEE ¤20.00 01/27/2021
CONNECTION FEES ¤1,017.83 01/27/2021
BUILDING DISCOUNT 100% (¤1,304.60) 01/27/2021
ELECTRIC FEE ¤217.80 01/27/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 01/27/2021
IMPACT FEE FIRE ¤367.00 01/27/2021
IMPACT FEE PARKS ¤1,199.12 01/27/2021
IMPACT FEE SCHOOL ¤3,600.00 01/27/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 01/27/2021
MECHANICAL FEE ¤217.80 01/27/2021
WATER -IRRIGATION INSPECTION ¤25.00 01/27/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 01/27/2021
PLAN CHECK FEE ¤105.20 01/27/2021
PLUMBING FEE ¤217.80 01/27/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,361.43