Permit #2021010691
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00120-0050 |
| CONDITIONED SPACE: 2108 sqft |
| GARAGE: 412 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| OPENED PORCH (WITH ROOF) : 240 sqft |
| Total Square Footage: 2832 sqft |
| Block: 00120 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-960-7720 |
| Location Address: 10 SEVEN OAKS PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/27/2021 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address 620 MALABAR ROAD SE STE 5 PALM BAY, FL 32907 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤246,950.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/19/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 10/19/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/18/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. The fall in the swale is in the wrong direction please. Need re grading the swale. Need positive fall in the direction described in the swale plan. ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED 10/18/2021=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 10/18/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. The fall in the swale is in the wrong direction please. Need re grading the swale. Need positive fall in the direction described in the swale plan. ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED 10/18/2021=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 10/18/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/18/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. YOU NEED TO MATCH EXISTING GRADE ON THE LEFT SIDE ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED 10/18/2021=CORRECTION WERE MADE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/13/2021 | CANCELLED BY APPLICANT | RGROSS |
| Note: THIS IS A REINSPECTION INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. YOU NEED TO MATCH EXISTING GRADE ON THE LEFT SIDE ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/07/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. YOU NEED TO MATCH EXISTING GRADE ON THE LEFT SIDE ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/07/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: INVERTS NUMBERS THE SHOWING THE CULVERT IS TILTED IN THE WRONG DIRECTION LEFT SIDE SWALE IS TILTED TO THE WRONG DIRECTION WATER IS NOT GOING INTO THE DITCH LINE ON THE LEFT. The fall in the swale is in the wrong direction please. Need re grading the swale. Need positive fall in the direction described in the swale plan. ROAD NEED TO REMOVED THE COLD PATCH AND NEED TO ADD HOT PATCH AND ALSO I LEFT IT PAINTED THE ROAD WITH PINK SPRAY PAINT NEED TO BE REPAIRED | |||
| ROW- PRE-APRON (PRE-POUR) | 08/20/2021 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| U - SEWER TIE IN | 08/06/2021 | APPROVED | JGIBSON |
| U-CROSS CONNECTION | 08/06/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation,no cross connections. | |||
| GRAVITY SEWER TEST | 08/06/2021 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 07/07/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION House needs to be unlocked | |||
| ELECTRIC - EARLY POWER | 07/06/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: House needs to be unlocked | |||
| LATH/BRICK/ WATER BARRIER | 05/13/2021 | APPROVED | TSTAUFFACHER |
| INSULATION | 05/12/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 05/07/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 05/03/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 04/29/2021 | APPROVED | TBAKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/22/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Text at 8.19 AM | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/19/2021 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: Text at 8.19 AM | |||
| TIE BEAM / LINTEL | 04/09/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 03/31/2021 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 03/26/2021 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/22/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 03/01/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 03/20/2026 | 03/20/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 10/18/2021 | 10/18/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT FBC2020 BLOWER DOOR TEST FORM, NOT 2017 | |||
| ENGIN1 | COMPLETE | 04/29/2021 | 04/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/29/2021 | 04/29/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/25/2021 | 01/25/2021 |
| Note: Released By: GBERTOLA | |||
| SWALE | COMPLETE | 01/20/2021 | 04/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 01/19/2021 | 01/22/2021 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 01/19/2021 | 01/20/2021 |
| Note: Released By: JPI |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/19/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/19/2021 |
| REINSPECTION FEE | ¤40.00 | 10/19/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤526.00 | 01/27/2021 |
| SITE PLAN 20 | ¤20.00 | 01/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/27/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/27/2021 |
| SEWER CREDIT | (¤850.00) | 01/27/2021 |
| SEWER INSPECTION | ¤25.00 | 01/27/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 01/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 01/27/2021 |
| METER - DEPOSIT | ¤60.00 | 01/27/2021 |
| WATER- TURN ON | ¤25.00 | 01/27/2021 |
| ADMIN FEE | ¤20.00 | 01/27/2021 |
| CONNECTION FEES | ¤1,017.83 | 01/27/2021 |
| BUILDING DISCOUNT 100% | (¤1,304.60) | 01/27/2021 |
| ELECTRIC FEE | ¤217.80 | 01/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 01/27/2021 |
| IMPACT FEE FIRE | ¤367.00 | 01/27/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 01/27/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 01/27/2021 |
| MECHANICAL FEE | ¤217.80 | 01/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 01/27/2021 |
| PLAN CHECK FEE | ¤105.20 | 01/27/2021 |
| PLUMBING FEE | ¤217.80 | 01/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,361.43 |