Permit #2021010821
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00540-0150 |
| CONDITIONED SPACE: 1601 sqft |
| GARAGE: 391 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 2165 sqft |
| Block: 00540 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 904-667-3599 |
| Location Address: 30 RANWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/03/2021 |
| NOC: RECORDED |
| Applicant name: TONY S JACKSON |
| Owner: 3DRE LLC |
|
Address 3544 ST JOHNS BLUFF RD S #1104 JACKSONVILLE, FL 32224 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
T-DAWG CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6821 SOUTH POINT DR N NEPTUNE , FL 32266 |
CGC1523419 (Exp: 08/31/2024) | 904-667-3599 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JACK RICHARD SHEKIRA
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1833 LIVE OAK DR JACKSONVILLE, FL 32246 |
CCC048193 (Exp: 08/31/2026) | 904-725-4089 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 11/10/2021 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 11/10/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 11/10/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 11/10/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 11/05/2021 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 11/05/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION IN THE BACK YARD BY THE EMPTY LOT IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES 11/02/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| U -UTILITY RESIDENTIAL FINAL | 11/04/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 11/02/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: IN THE BACK YARD BY THE EMPTY LOT IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES 11/02/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/01/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 11/01/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: CULVERT PIPE ELEVATION IS GOOD AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/01/2021 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 09/16/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – 09/16/2021 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U-CROSS CONNECTION | 09/14/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 09/14/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – | |||
| ELECTRIC - EARLY POWER | 08/18/2021 | Approval - Private Provider | JPI |
| GRAVITY SEWER TEST | 08/05/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 08/05/2021 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/09/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster will need to move | |||
| INSULATION | 06/07/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 05/26/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 05/24/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 05/06/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 04/21/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/06/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/31/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 03/04/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 04/27/2021 | 04/27/2021 |
| Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM NOC uploaded is not for this address -Libby | |||
| ENGIN1 | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 01/27/2021 | 01/27/2021 |
| Note: Released By: JBODEN | |||
| SWALE | COMPLETE | 01/22/2021 | 04/27/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/21/2021 | 01/25/2021 |
| Note: Held By: JPI 1. Lintels are missing on the product approval sheet | |||
| CUSVC | COMPLETE | 01/21/2021 | 01/26/2021 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 01/21/2021 | 01/22/2021 |
| Note: Held By: JMUNSON Need to submit electrical riser diagram | |||
| ENGIN1 | COMPLETE | 01/21/2021 | 01/22/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/21/2021 | 01/25/2021 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 01/21/2021 | 01/22/2021 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 01/21/2021 | 01/25/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 01/21/2021 | 01/28/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 01/21/2021 | 01/22/2021 |
| Note: Held By: AMOBLEY Please provide the width of the front entry walkway Please show the rear setback from the back patio to the property line on site plan/survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 11/05/2021 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/05/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/05/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/03/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/03/2021 |
| SEWER CREDIT | (¤1,147.00) | 03/03/2021 |
| SEWER INSPECTION | ¤25.00 | 03/03/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/03/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/03/2021 |
| METER - DEPOSIT | ¤60.00 | 03/03/2021 |
| WATER- TURN ON | ¤25.00 | 03/03/2021 |
| ADMIN FEE | ¤20.00 | 03/03/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/03/2021 |
| BUILDING DISCOUNT 100% | (¤1,044.20) | 03/03/2021 |
| ELECTRIC FEE | ¤180.60 | 03/03/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/03/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/03/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/03/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/03/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/03/2021 |
| MECHANICAL FEE | ¤180.60 | 03/03/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/03/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/03/2021 |
| PLAN CHECK FEE | ¤80.40 | 03/03/2021 |
| PLUMBING FEE | ¤180.60 | 03/03/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤402.00 | 03/03/2021 |
| SITE PLAN 20 | ¤20.00 | 03/03/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/03/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/03/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,054.43 |