I want to search for...
Permit #2021010984
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00060-0040 |
| CONDITIONED SPACE: 1817 sqft |
| GARAGE: 433 sqft |
| OPENED PORCH (WITH ROOF) : 186 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| Total Square Footage: 2474 sqft |
| Block: 00060 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: (386)437-1508 |
| Location Address: 4 WHITMAN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/24/2021 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/21/2022 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION not ready, water heater not hooked up, no water to master side of house 1/20/22 No hot water. Guest shower not working. | |||
| BLD - BUILDING FINAL | 01/20/2022 | Disapproved - NO FEE | KSANDOE |
| Note: THIS IS A REINSPECTION not ready, water heater not hooked up, no water to master side of house 1/20/22 No hot water. Guest shower not working. | |||
| BLD - BUILDING FINAL | 01/19/2022 | Disapproved - NO FEE | RMARTIN |
| Note: not ready, water heater not hooked up, no water to master side of house | |||
| U -UTILITY RESIDENTIAL FINAL | 01/19/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 01/18/2022 | APPROVED | GBERTOLA |
| Note: 2 whitman has some road damage that was done by the dozer and will need to be repaired as well as the road repair for the driveway 01/18/2022=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/18/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 01/18/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/18/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| WINDOW NAILING | 01/13/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION The FL product approval # for windows approved by the building department are 17676. The windows that have been installed are FL # 15906. The block walls have been bucked out with PT 2x. Please submitt a revision for the change of window and the installation used. | |||
| ROW DAMAGE | 01/06/2022 | APPROVED | KRUTH |
| Note: road will get repaired asap | |||
| ELECTRIC - EARLY POWER | 12/09/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:46 am | |||
| ROW- PRE-APRON (PRE-POUR) | 11/29/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete | |||
| U-CROSS CONNECTION | 11/10/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U - SEWER TIE IN | 11/10/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/10/2021 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 10/07/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION The plastic lath corner bead around the windows have not been installed. DUE to the change of window installation. | |||
| LATH/BRICK/ WATER BARRIER | 10/06/2021 | CANCELLED BY APPLICANT | FWILLIS |
| Note: THIS IS A REINSPECTION The plastic lath corner bead around the windows have not been installed. DUE to the change of window installation. | |||
| WINDOW NAILING | 10/05/2021 | Disapproved - NO FEE | JWALKER |
| Note: The FL product approval # for windows approved by the building department are 17676. The windows that have been installed are FL # 15906. The block walls have been bucked out with PT 2x. Please submitt a revision for the change of window and the installation used. | |||
| LATH/BRICK/ WATER BARRIER | 10/05/2021 | Disapproved - NO FEE | JWALKER |
| Note: The plastic lath corner bead around the windows have not been installed. DUE to the change of window installation. | |||
| INSULATION | 10/05/2021 | APPROVED | JWALKER |
| PEP TANK INSTALLATION REQUEST | 09/30/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster will need to move | |||
| ALL ROUGH | 09/28/2021 | APPROVED - AS NOTED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION The grommet clamps are not properly installed at the electrical panel and some of the wiring has been cut and abraised against the sharp metal edges. Install clamps properly and replace cut and braised wire. Outlets in the garage are to be on a 20 amp circut and 12-2 wiring is to be used. Install 16 gage strap at notched out top plate at the dryer duct. The water supply for the fridge is installed causing the valve in the supply box to be crocked and understrain. The kitchen exhaust vent needs to have all joints sealed including fittings. The 12-2 outlet wire at kitchen knee wall needs to be terminated into an outlet box. Note Windows and rear slider have not been installed. THIS IS A REINSPECTION No pressure on water lines Truss G2B missing fasteners at bucket above garage interior wall 9/28/21 - Dryer vent needs to be sealed at the box | |||
| ALL ROUGH | 09/27/2021 | CANCELLED BY APPLICANT | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION The grommet clamps are not properly installed at the electrical panel and some of the wiring has been cut and abraised against the sharp metal edges. Install clamps properly and replace cut and braised wire. Outlets in the garage are to be on a 20 amp circut and 12-2 wiring is to be used. Install 16 gage strap at notched out top plate at the dryer duct. The water supply for the fridge is installed causing the valve in the supply box to be crocked and understrain. The kitchen exhaust vent needs to have all joints sealed including fittings. The 12-2 outlet wire at kitchen knee wall needs to be terminated into an outlet box. Note Windows and rear slider have not been installed. THIS IS A REINSPECTION No pressure on water lines Truss G2B missing fasteners at bucket above garage interior wall | |||
| ALL ROUGH | 09/24/2021 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION The grommet clamps are not properly installed at the electrical panel and some of the wiring has been cut and abraised against the sharp metal edges. Install clamps properly and replace cut and braised wire. Outlets in the garage are to be on a 20 amp circut and 12-2 wiring is to be used. Install 16 gage strap at notched out top plate at the dryer duct. The water supply for the fridge is installed causing the valve in the supply box to be crocked and understrain. The kitchen exhaust vent needs to have all joints sealed including fittings. The 12-2 outlet wire at kitchen knee wall needs to be terminated into an outlet box. Note Windows and rear slider have not been installed. THIS IS A REINSPECTION No pressure on water lines Truss G2B missing fasteners at bucket above garage interior wall | |||
| ALL ROUGH | 09/21/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: The grommet clamps are not properly installed at the electrical panel and some of the wiring has been cut and abraised against the sharp metal edges. Install clamps properly and replace cut and braised wire. Outlets in the garage are to be on a 20 amp circut and 12-2 wiring is to be used. Install 16 gage strap at notched out top plate at the dryer duct. The water supply for the fridge is installed causing the valve in the supply box to be crocked and understrain. The kitchen exhaust vent needs to have all joints sealed including fittings. The 12-2 outlet wire at kitchen knee wall needs to be terminated into an outlet box. Note Windows and rear slider have not been installed. Also the job site needs to be cleaned up and the over growth cut. | |||
| ROOF VALLEY & METAL | 06/18/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 06/17/2021 | CANCELLED BY APPLICANT | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/25/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 05/19/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/13/2021 | APPROVED | WMILLER |
| MONOLITHIC SLAB | 03/26/2021 | APPROVED | JBODEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/23/2021 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/22/2021 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 03/12/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/23/2021 | 02/23/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/23/2021 | 02/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/22/2021 | 02/22/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2021 | 02/18/2021 |
| Note: Released By: ELENS | |||
| MECH | HOLD | 02/16/2021 | 02/16/2021 |
| Note: Held By: CPISCITELLI Energy Calcs need to be from 2020 7Th edition code cycle | |||
| ELEC | HOLD | 02/16/2021 | 02/16/2021 |
| Note: Held By: JMUNSON Need to reference the 2017 NEC not the 2011. page E1 note 9 | |||
| BLD | COMPLETE | 02/03/2021 | 02/03/2021 |
| Note: Released By: JBODEN | |||
| SWALE | COMPLETE | 01/26/2021 | 04/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/25/2021 | 01/27/2021 |
| Note: Held By: JPI 1. Provide type of construction and occupancy classification. 2. Provide details for dwelling-garage fire separation. 3. Truss plans indicate wall at entry door to be at 10’-8”. Floor plan illustrates wall at 8’. Please clarify and/or correct. | |||
| CUSVC | COMPLETE | 01/25/2021 | 01/29/2021 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 01/25/2021 | 01/26/2021 |
| Note: Held By: JMUNSON Need to reference the 2017 NEC not the 2011 | |||
| ENGIN1 | COMPLETE | 01/25/2021 | 01/26/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/25/2021 | 01/27/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 01/25/2021 | 01/26/2021 |
| Note: Held By: CPISCITELLI Provide Energy Calcs, Heatload and Duct Layout | |||
| PLUM | COMPLETE | 01/25/2021 | 01/27/2021 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 01/25/2021 | 01/25/2021 |
| Note: Held By: KRUTH REFER TO THE STORMWATER CHECKLIST TO MEET THE MINIMUM REQUIERMENTS LOOK AT THE HIGHLIGHTED AREAS FOR CORRECTIONS THAT NEED TO BE MADE | |||
| ZON | HOLD | 01/25/2021 | 01/26/2021 |
| Note: Held By: ELENS Please upload page 1 of 2 along with page 2 of 2 for site plan approval. (Page 1 has required information, including the legal description, lot area, FEMA flood zone and map number.) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/17/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/17/2022 |
| CONNECTION FEES | ¤1,017.83 | 02/24/2021 |
| BUILDING DISCOUNT 100% | (¤1,161.80) | 02/24/2021 |
| ELECTRIC FEE | ¤197.40 | 02/24/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 02/24/2021 |
| IMPACT FEE FIRE | ¤367.00 | 02/24/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 02/24/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/24/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/24/2021 |
| MECHANICAL FEE | ¤197.40 | 02/24/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/24/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 02/24/2021 |
| PLAN CHECK FEE | ¤91.60 | 02/24/2021 |
| PLUMBING FEE | ¤197.40 | 02/24/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤458.00 | 02/24/2021 |
| SITE PLAN 20 | ¤20.00 | 02/24/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/24/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/24/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/24/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/24/2021 |
| SEWER CREDIT | (¤1,147.00) | 02/24/2021 |
| SEWER INSPECTION | ¤25.00 | 02/24/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 02/24/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 02/24/2021 |
| METER - DEPOSIT | ¤60.00 | 02/24/2021 |
| WATER- TURN ON | ¤25.00 | 02/24/2021 |
| ADMIN FEE | ¤20.00 | 02/24/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,064.43 |