Permit #2021011039
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-5112-00000-0110 |
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 4 COMMERCE BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 02/02/2021 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: GIOIA PROPERTIES LLC |
|
Address 10 COMMERCE BLVD PALM COAST, FL 32164 |
| Lot: 0110 |
| Job Description: SITE WORK: GIOIA SALES SOUTH |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 10/01/2021 | APPROVED | DRAMIREZ |
| CLOSE OUT DOCUMENTS | 10/01/2021 | APPROVED | DRAMIREZ |
| Note: Irma approved all of the close out documents. | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 09/30/2021 | APPROVED | DRAMIREZ |
| Note: As-builts approved under application 4894 | |||
| UC-FINAL SITE INSPECTION | 09/29/2021 | FINAL APPROVED | LFITZGERALD |
| U - UTILITY COMMERCIAL FINAL | 09/29/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 09/29/2021 | FINAL APPROVED | LFITZGERALD |
| UC-SUBSTANTIAL WALK-THRU | 09/28/2021 | APPROVED | LFITZGERALD |
| UC- PRELIMINARY AS-BUILTS | 09/28/2021 | APPROVED | LFITZGERALD |
| BLD - SITE STRUCTURE - TRASH DUMPSTER | 09/28/2021 | FINAL APPROVED | FWILLIS |
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 09/28/2021 | APPROVED | JMUNSON |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 09/28/2021 | APPROVED | FWILLIS |
| BLD- ADA PARKING | 09/28/2021 | APPROVED | FWILLIS |
| BLD - ADA COMPLIANT | 09/28/2021 | CANCELLED BY APPLICANT | WEB |
| BLD - ADA COMPLIANT | 09/28/2021 | APPROVED | FWILLIS |
| BLD- ADA SIGNAGECONTROL | 09/28/2021 | APPROVED | FWILLIS |
| BLD- ADA VEHICULAR WAY | 09/28/2021 | APPROVED | FWILLIS |
| BLD - ADA SIGNAGE- INFOR/DIRECT | 09/28/2021 | APPROVED | FWILLIS |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 09/16/2021 | APPROVED | LFITZGERALD |
| IRRIGATION AFFIDAVIT | 09/13/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: submitted | |||
| LDSC-IRRIGATION FINAL | 09/13/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: irrigation affadavit submitted | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 09/13/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: paper set handed in,working on getting digital set of landscape as-builts submitted As-builts approved under application 4894 | |||
| LDSC- LANDSCAPE FINAL | 09/13/2021 | APPROVED | LFITZGERALD |
| UROW - FINAL DRAINAGE | 09/02/2021 | APPROVED | LFITZGERALD |
| UROW -FINAL GRADE PRIOR SOD | 09/02/2021 | APPROVED | LFITZGERALD |
| LDSC-PRE-PLANTING TREE QUALITY | 09/01/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 3 types of Holly's oaks,bald cypress,magnolia's | |||
| LDSC-PRE-PLANTING TREE QUALITY | 08/31/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: oaks,bald cypress,magnolia's | |||
| U-WATER METER INSTALLATION/VERIFICATION | 08/30/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 1in backflow/meter on west end for unit 1/2nd 1in for unit 2 and 2in for unit 3 spoke with Sheldon when to call this back in | |||
| LANDSCAPE PRE-CONSTRUCTION MEETING | 07/28/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: met Tim with TB Outdoors on site | |||
| UC-CONSTRUCTION ENTRANCE | 07/26/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -now being paved THIS IS A REINSPECTION -slight soil tracking-brooming off at end of day-Sheldon called in to close out this inspection but i explained i leave as a partial since it is an on going maintanence issue just lumbering for now and because of this , asphalt millings used with a berm a 57 to 1in stone being used. spoke with Josh that need to keep eye on and if soils start making their way onto roadway wll have to be more aggressive on the entrance. | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 07/26/2021 | APPROVED | LFITZGERALD |
| UC-ASPHALT PRE PLACEMENT | 07/26/2021 | APPROVED | LFITZGERALD |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 07/23/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -2 sections of sidewalk/flume/mes's/fire backflow pad building apron | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 07/21/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: building apron | |||
| UROW- CURBING & GUTTER | 07/19/2021 | APPROVED | LFITZGERALD |
| Note: F curb now being installed | |||
| U-WATER METER INSTALLATION/VERIFICATION | 07/07/2021 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: spoke with Sheldon when to call this back in | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/01/2021 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -screen samples foe all 3 units taken on May 20th and all were absent for total coliforms and E. Coli THIS IS A REINSPECTION -16x6 and 16x2 wet taps completed/water main sections completed to 6in fire backflow and adjacent hydrant/ 2in poly tube connected to 2in corp 16x6 sleeve and 16x2 saddle attached to existing 16in water main with min pressure holding for sleeve | |||
| U-WATER SERVICE INSTALLATION | 05/19/2021 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 2-1in meter/backflow and 2in meter /backflow now installed to 1.5 in poly tubing-plummer to tie in to bldg. at some time THIS IS A REINSPECTION 3 lines of 1.5 in poly now installed from proposed bldg. tie in up to 2in poly curb stop where manifold/meter/backflows will be installed called in by accident | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 05/12/2021 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION MARKED ON PRINT, POLE LIGHT CONDUITS | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/07/2021 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -15in pipe for down spouts now installed THIS IS A REINSPECTION -pipe placed from CS-1 to U end wall and down spout line from MES to corner of the bldg. THIS IS A REINSPECTION -complete to 2 and placed from str.2 to 1 THIS IS A REINSPECTION -pipe from str 4 to mes(pond)/from str 3 heading to str 2 THIS IS A REINSPECTION -pipe from str. 5 to 3 THIS IS A REINSPECTION -called in by Sheldon and i explained that there is more pipe to be installed so i leave as a partial rcp for swale culvert now installed | |||
| U-WATER SERVICE INSTALLATION | 05/05/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 3 lines of 1.5 in poly now installed from proposed bldg. tie in up to 2in poly curb stop where manifold/meter/backflows will be installed called in by accident | |||
| U - SEWER TIE IN | 05/05/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: covered under sanitary sewer install where the tie in to the existing took place on 4-29-2021 | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/04/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -pipe placed from CS-1 to U end wall and down spout line from MES to corner of the bldg. THIS IS A REINSPECTION -complete to 2 and placed from str.2 to 1 THIS IS A REINSPECTION -pipe from str 4 to mes(pond)/from str 3 heading to str 2 THIS IS A REINSPECTION -pipe from str. 5 to 3 THIS IS A REINSPECTION -called in by Sheldon and i explained that there is more pipe to be installed so i leave as a partial rcp for swale culvert now installed | |||
| U-GRAVITY SEWER INSTALL/TESTING | 05/04/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION remaining sanitary line to bldg. stub outs installed 8x6 wye tie in to existing 8in sanitary completed plus 2 sticks of pipe installed in existing driveway of other bldg. | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/30/2021 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -control str (pond) now placed THIS IS A REINSPECTION U wall for pond outfall placed THIS IS A REINSPECTION-str 1 placed THIS IS A REINSPECTION str 2 placed THIS IS A REINSPECTION-str 4 placed 5 and 3 placed | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/29/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION U wall for pond outfall placed THIS IS A REINSPECTION-str 1 placed THIS IS A REINSPECTION str 2 placed THIS IS A REINSPECTION-str 4 placed 5 and 3 placed | |||
| U-GRAVITY SEWER INSTALL/TESTING | 04/29/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 8x6 wye tie in to existing 8in sanitary completed plus 2 sticks of pipe installed in existing driveway of other bldg. | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 04/28/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -16x6 and 16x2 wet taps completed/water main sections completed to 6in fire backflow and adjacent hydrant/ 2in poly tube connected to 2in corp 16x6 sleeve and 16x2 saddle attached to existing 16in water main with min pressure holding for sleeve | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/28/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-str 1 placed THIS IS A REINSPECTION str 2 placed THIS IS A REINSPECTION-str 4 placed 5 and 3 placed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 04/28/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -complete to 2 and placed from str.2 to 1 THIS IS A REINSPECTION -pipe from str 4 to mes(pond)/from str 3 heading to str 2 THIS IS A REINSPECTION -pipe from str. 5 to 3 THIS IS A REINSPECTION -called in by Sheldon and i explained that there is more pipe to be installed so i leave as a partial rcp for swale culvert now installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/27/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION str 2 placed THIS IS A REINSPECTION-str 4 placed 5 and 3 placed | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 04/27/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 16x6 sleeve and 16x2 saddle attached to existing 16in water main with min pressure holding for sleeve | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/26/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-str 4 placed 5 and 3 placed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 04/26/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -pipe from str 4 to mes(pond)/from str 3 heading to str 2 THIS IS A REINSPECTION -pipe from str. 5 to 3 THIS IS A REINSPECTION -called in by Sheldon and i explained that there is more pipe to be installed so i leave as a partial rcp for swale culvert now installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 04/23/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -pipe from str. 5 to 3 THIS IS A REINSPECTION -called in by Sheldon and i explained that there is more pipe to be installed so i leave as a partial rcp for swale culvert now installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/23/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 5 and 3 placed | |||
| U-WATER SERVICE INSTALLATION | 04/21/2021 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: called in by accident | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 04/19/2021 | PARTIALLY APPROVED | RMARTIN |
| Note: MARKED ON PRINT, POLE LIGHT CONDUITS | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 03/30/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -called in by Sheldon and i explained that there is more pipe to be installed so i leave as a partial rcp for swale culvert now installed | |||
| UC-CONSTRUCTION ENTRANCE | 03/30/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -slight soil tracking-brooming off at end of day-Sheldon called in to close out this inspection but i explained i leave as a partial since it is an on going maintanence issue just lumbering for now and because of this , asphalt millings used with a berm a 57 to 1in stone being used. spoke with Josh that need to keep eye on and if soils start making their way onto roadway wll have to be more aggressive on the entrance. | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/16/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: rcp for swale culvert now installed | |||
| UC-CONSTRUCTION ENTRANCE | 02/16/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: just lumbering for now and because of this , asphalt millings used with a berm a 57 to 1in stone being used. spoke with Josh that need to keep eye on and if soils start making their way onto roadway wll have to be more aggressive on the entrance. | |||
| LDSC-TREE BARRICADE | 02/12/2021 | APPROVED | JHARDING |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/12/2021 | APPROVED | JHARDING |
| PLAN - PRE-CON 386-986-3750 | 01/25/2021 | APPROVED | LFITZGERALD |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/27/2021 | 01/28/2021 |
| Note: Released By: PBUCKLEY | |||
| ELEC | COMPLETE | 01/27/2021 | 01/27/2021 |
| Note: Released By: JMUNSON | |||
| PLENG | COMPLETE | 01/27/2021 | 01/27/2021 |
| Note: Released By: DLEAP | |||
| PLLA | COMPLETE | 01/27/2021 | 01/28/2021 |
| Note: Released By: DRAMIREZ | |||
| UD1 | COMPLETE | 01/27/2021 | 01/27/2021 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| BUILDING DISCOUNT 100% | (¤125.00) | 02/02/2021 |
| INSPECTION 40 | ¤400.00 | 02/02/2021 |
| PERMIT FEE | ¤125.00 | 02/02/2021 |
| SITE INSPECTION | ¤760.00 | 02/02/2021 |
| SITE PLAN 20 | ¤20.00 | 02/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,180.00 |