Permit #2021011196

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00060-0280
CONDITIONED SPACE: 1819 sqft
GARAGE: 440 sqft
OPENED PORCH (WITH ROOF) : 227 sqft
OPENED PORCH (WITH ROOF) : 119 sqft
Total Square Footage: 2605 sqft
Block: 00060
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 386-447-7007
Location Address: 16 FORTRESS PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/02/2021
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: DALEY PATRICIA

Address

24 ETHAN ALLEN DR

PALM COAST , FL 32164

Lot: 0280
Contracted Stated Job Value: ¤251,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/27/2022 FINAL APPROVED AGAETANO
Note: THIS IS A REINSPECTION Installed HVAC equipment does not match energy calcs. Submit revision for energy calcs to building department. Penetrations in garage ceiling must be sealed with an approved fire rated caulking.
BLD - BUILDING FINAL 01/26/2022 Disapproved - NO FEE KSANDOE
Note: Installed HVAC equipment does not match energy calcs. Submit revision for energy calcs to building department. Penetrations in garage ceiling must be sealed with an approved fire rated caulking.
U-CROSS CONNECTION 01/03/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW - STORMWATER FINAL 01/03/2022 APPROVED KRUTH
U -UTILITY RESIDENTIAL FINAL 01/03/2022 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 12/30/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 12/30/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 12/30/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION the survey submitted is a boundary survey not a topographical final survey and the sod needs to be down before you can get a topographical survey done corrections made
FINAL SURVEY (OFFICE USE ONLY) 11/29/2021 Disapproved - NO FEE KRUTH
Note: the survey submitted is a boundary survey not a topographical final survey and the sod needs to be down before you can get a topographical survey done
ROW- PRE-APRON (PRE-POUR) 11/01/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ELECTRIC - EARLY POWER 10/07/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:18 am
INSULATION 08/30/2021 APPROVED KSANDOE
ALL ROUGH 08/24/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION NEED NAIL PLATE BEHIND RANGE ON ELECTRICAL CONDUIT, EXHAUST FANS IN BATH ROOMS NEED TO BE CONNECTED ELECTRICALLY, CONDUCTORS THATWHITE AND ARE HOT IN PANEL NEEDS TO BE PHASED HOT, GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE INSTALLED TO UFER 8-24-21... notes above resolved
ALL ROUGH 08/17/2021 Disapproved - NO FEE RMARTIN
Note: NEED NAIL PLATE BEHIND RANGE ON ELECTRICAL CONDUIT, EXHAUST FANS IN BATH ROOMS NEED TO BE CONNECTED ELECTRICALLY, CONDUCTORS THATWHITE AND ARE HOT IN PANEL NEEDS TO BE PHASED HOT, GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE INSTALLED TO UFER
LATH/BRICK/ WATER BARRIER 08/02/2021 APPROVED WMILLER
ROOF VALLEY & METAL 07/29/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION missing second layer on underlayment, Per FBC, section R905.1 7-13-21... still missing second layer of underlayment, Per FBC, section please install per R905.1.1.1 7-19-21... Veryfied double coverage (in full sheets) Need two rows staggard no more than 12 inches apart in the field
ROOF VALLEY & METAL 07/19/2021 PARTIALLY APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION missing second layer on underlayment, Per FBC, section R905.1 7-13-21... still missing second layer of underlayment, Per FBC, section please install per R905.1.1.1 7-19-21... Veryfied double coverage (in full sheets) Need two rows staggard no more than 12 inches apart in the field
ROOF VALLEY & METAL 07/13/2021 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION missing second layer on underlayment, Per FBC, section R905.1 7-13-21... still missing second layer of underlayment, Per FBC, section please install per R905.1.1.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/06/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Approved Documents need to be on site for inspection 7-6-21... notes above resolved
ROOF VALLEY & METAL 07/06/2021 Disapproved -FEE REQUIRED WMILLER
Note: missing second layer on underlayment, Per FBC, section R905.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/01/2021 Disapproved -FEE REQUIRED WMILLER
Note: NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Approved Documents need to be on site for inspection
FOUND SURVEY APPROVED (OFFICE) 06/30/2021 APPROVED TBAKER
TIE BEAM / LINTEL 05/10/2021 APPROVED BGREVE
MONOLITHIC SLAB 04/08/2021 APPROVED BGREVE
Note: THIS IS A REINSPECTION not ready
MONOLITHIC SLAB 04/07/2021 Disapproved - NO FEE BGREVE
Note: not ready
GRAVITY SEWER TEST 04/06/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS INSPECTED ON 4/5/21
U - SEWER TIE IN 04/06/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS INSPECTED ON 4/5/21
PLUMBING 1ST ROUGH UNDERGROUND 04/05/2021 APPROVED - AS NOTED JGIBSON
Note: FIRST ROUGH, GRAVITY SEWER, AND U-SEWER TIE IN COMPLETED
WATER METER INSTALLATION REQUEST 03/03/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/26/2022 01/27/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 06/30/2021 06/30/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/30/2021 06/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 06/17/2021 06/17/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY
BADMIN COMPLETE 06/17/2021 06/17/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/17/2021 06/17/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 06/17/2021 06/17/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Foundation survey missing right side setback.
PLUM COMPLETE 03/22/2021 03/26/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 COMPLETE 02/23/2021 02/24/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 02/23/2021 02/24/2021
Note: Released By: ESTELLE LENS - (386)986-2655 -
SW1 HOLD 02/12/2021 02/19/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM review the stormwater checklist and correct the highlighted bullets
ZON COMPLETE 02/12/2021 02/17/2021
Note: Released By: ELENS
ZON COMPLETE 02/04/2021 02/05/2021
Note: Released By: ELENS
MECH COMPLETE 02/04/2021 02/04/2021
Note: Released By: CPISCITELLI
ELEC COMPLETE 02/04/2021 02/04/2021
Note: Released By: JMUNSON
SW1 HOLD 02/04/2021 02/11/2021
Note: Held By: CTROHA see check list and marked site plan
SW1 HOLD 02/02/2021 02/02/2021
Note: Held By: KRUTH review stormwater checklist for details and correct the highlighted issues
SWALE COMPLETE 01/29/2021 04/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 01/28/2021 01/30/2021
Note: Released By: JPI
CUSVC COMPLETE 01/28/2021 02/02/2021
Note: Released By: HHAND
ELEC HOLD 01/28/2021 01/29/2021
Note: Held By: JMUNSON 1. Need to reference the 2017 NEC not the 2014 2. Need to add outlet in garage per NEC 2017 210.52 (G) (1)
ENGIN1 COMPLETE 01/28/2021 01/29/2021
Note: Released By: TBAKER
LOCATE COMPLETE 01/28/2021 01/29/2021
Note: Released By: CSTONE
MECH HOLD 01/28/2021 01/29/2021
Note: Held By: CPISCITELLI 1. Provide Energy calcs from 2020 7th edition code cycle 2. The 2nd page of Energy calcs need to be signed by the builder below the preparer
PLUM COMPLETE 01/28/2021 01/30/2021
Note: Released By: JPI
ZON HOLD 01/28/2021 01/28/2021
Note: Held By: ELENS The setbacks on the site plan and in the Zoning Note are incorrect. The setbacks stated and shown are for SFR2 zoning and this lot is SFR3. Please provide the width of the walkway on the site plan. Need to show the easements on the site plan. Need to provide the rear setback on the site plan. Four trees are required. Need one more. 16 foundation plantings are required in addition to the A/C screening. 8 across the front and 4 on each side.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 11/02/2021
CONTRACTOR CHANGE ¤40.00 11/02/2021
REINSPECTION FEE ¤40.00 11/02/2021
REINSPECTION FEE ¤40.00 11/02/2021
REINSPECTION FEE ¤40.00 11/02/2021
NEW RESIDENTIAL INSPECTIONS ¤502.00 03/02/2021
SITE PLAN 20 ¤20.00 03/02/2021
SURCHARGE FS 533.721 ¤2.00 03/02/2021
SURCHARGE - FS 468.631 ¤2.00 03/02/2021
STORM WATER PERMIT FEES ¤80.00 03/02/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 03/02/2021
SEWER INSPECTION ¤25.00 03/02/2021
SEWER CAPITAL FACILITY ¤4,664.55 03/02/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 03/02/2021
BUILDING DISCOUNT 100% (¤1,254.20) 03/02/2021
ELECTRIC FEE ¤210.60 03/02/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 03/02/2021
IMPACT FEE FIRE ¤367.00 03/02/2021
IMPACT FEE PARKS ¤1,199.12 03/02/2021
IMPACT FEE SCHOOL ¤3,600.00 03/02/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 03/02/2021
MECHANICAL FEE ¤210.60 03/02/2021
WATER -IRRIGATION INSPECTION ¤25.00 03/02/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 03/02/2021
PLAN CHECK FEE ¤100.40 03/02/2021
PLUMBING FEE ¤210.60 03/02/2021
METER - DEPOSIT ¤60.00 03/02/2021
WATER- TURN ON ¤25.00 03/02/2021
ADMIN FEE ¤20.00 03/02/2021
CONNECTION FEES ¤1,017.83 03/02/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,331.43