I want to search for...
Permit #2021011196
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00060-0280 |
| CONDITIONED SPACE: 1819 sqft |
| GARAGE: 440 sqft |
| OPENED PORCH (WITH ROOF) : 227 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| Total Square Footage: 2605 sqft |
| Block: 00060 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-447-7007 |
| Location Address: 16 FORTRESS PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/02/2021 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: DALEY PATRICIA |
|
Address 24 ETHAN ALLEN DR PALM COAST , FL 32164 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤251,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/27/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Installed HVAC equipment does not match energy calcs. Submit revision for energy calcs to building department. Penetrations in garage ceiling must be sealed with an approved fire rated caulking. | |||
| BLD - BUILDING FINAL | 01/26/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Installed HVAC equipment does not match energy calcs. Submit revision for energy calcs to building department. Penetrations in garage ceiling must be sealed with an approved fire rated caulking. | |||
| U-CROSS CONNECTION | 01/03/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - STORMWATER FINAL | 01/03/2022 | APPROVED | KRUTH |
| U -UTILITY RESIDENTIAL FINAL | 01/03/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 12/30/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/30/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 12/30/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION the survey submitted is a boundary survey not a topographical final survey and the sod needs to be down before you can get a topographical survey done corrections made | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/29/2021 | Disapproved - NO FEE | KRUTH |
| Note: the survey submitted is a boundary survey not a topographical final survey and the sod needs to be down before you can get a topographical survey done | |||
| ROW- PRE-APRON (PRE-POUR) | 11/01/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC - EARLY POWER | 10/07/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:18 am | |||
| INSULATION | 08/30/2021 | APPROVED | KSANDOE |
| ALL ROUGH | 08/24/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION NEED NAIL PLATE BEHIND RANGE ON ELECTRICAL CONDUIT, EXHAUST FANS IN BATH ROOMS NEED TO BE CONNECTED ELECTRICALLY, CONDUCTORS THATWHITE AND ARE HOT IN PANEL NEEDS TO BE PHASED HOT, GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE INSTALLED TO UFER 8-24-21... notes above resolved | |||
| ALL ROUGH | 08/17/2021 | Disapproved - NO FEE | RMARTIN |
| Note: NEED NAIL PLATE BEHIND RANGE ON ELECTRICAL CONDUIT, EXHAUST FANS IN BATH ROOMS NEED TO BE CONNECTED ELECTRICALLY, CONDUCTORS THATWHITE AND ARE HOT IN PANEL NEEDS TO BE PHASED HOT, GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE INSTALLED TO UFER | |||
| LATH/BRICK/ WATER BARRIER | 08/02/2021 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 07/29/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION missing second layer on underlayment, Per FBC, section R905.1 7-13-21... still missing second layer of underlayment, Per FBC, section please install per R905.1.1.1 7-19-21... Veryfied double coverage (in full sheets) Need two rows staggard no more than 12 inches apart in the field | |||
| ROOF VALLEY & METAL | 07/19/2021 | PARTIALLY APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION missing second layer on underlayment, Per FBC, section R905.1 7-13-21... still missing second layer of underlayment, Per FBC, section please install per R905.1.1.1 7-19-21... Veryfied double coverage (in full sheets) Need two rows staggard no more than 12 inches apart in the field | |||
| ROOF VALLEY & METAL | 07/13/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION missing second layer on underlayment, Per FBC, section R905.1 7-13-21... still missing second layer of underlayment, Per FBC, section please install per R905.1.1.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Approved Documents need to be on site for inspection 7-6-21... notes above resolved | |||
| ROOF VALLEY & METAL | 07/06/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: missing second layer on underlayment, Per FBC, section R905.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/01/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Approved Documents need to be on site for inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/30/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/10/2021 | APPROVED | BGREVE |
| MONOLITHIC SLAB | 04/08/2021 | APPROVED | BGREVE |
| Note: THIS IS A REINSPECTION not ready | |||
| MONOLITHIC SLAB | 04/07/2021 | Disapproved - NO FEE | BGREVE |
| Note: not ready | |||
| GRAVITY SEWER TEST | 04/06/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS INSPECTED ON 4/5/21 | |||
| U - SEWER TIE IN | 04/06/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS INSPECTED ON 4/5/21 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/05/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: FIRST ROUGH, GRAVITY SEWER, AND U-SEWER TIE IN COMPLETED | |||
| WATER METER INSTALLATION REQUEST | 03/03/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/26/2022 | 01/27/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/30/2021 | 06/30/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/30/2021 | 06/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 06/17/2021 | 06/17/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY | |||
| BADMIN | COMPLETE | 06/17/2021 | 06/17/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/17/2021 | 06/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/17/2021 | 06/17/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Foundation survey missing right side setback. | |||
| PLUM | COMPLETE | 03/22/2021 | 03/26/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/23/2021 | 02/24/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2021 | 02/24/2021 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - | |||
| SW1 | HOLD | 02/12/2021 | 02/19/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM review the stormwater checklist and correct the highlighted bullets | |||
| ZON | COMPLETE | 02/12/2021 | 02/17/2021 |
| Note: Released By: ELENS | |||
| ZON | COMPLETE | 02/04/2021 | 02/05/2021 |
| Note: Released By: ELENS | |||
| MECH | COMPLETE | 02/04/2021 | 02/04/2021 |
| Note: Released By: CPISCITELLI | |||
| ELEC | COMPLETE | 02/04/2021 | 02/04/2021 |
| Note: Released By: JMUNSON | |||
| SW1 | HOLD | 02/04/2021 | 02/11/2021 |
| Note: Held By: CTROHA see check list and marked site plan | |||
| SW1 | HOLD | 02/02/2021 | 02/02/2021 |
| Note: Held By: KRUTH review stormwater checklist for details and correct the highlighted issues | |||
| SWALE | COMPLETE | 01/29/2021 | 04/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/28/2021 | 01/30/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 01/28/2021 | 02/02/2021 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 01/28/2021 | 01/29/2021 |
| Note: Held By: JMUNSON 1. Need to reference the 2017 NEC not the 2014 2. Need to add outlet in garage per NEC 2017 210.52 (G) (1) | |||
| ENGIN1 | COMPLETE | 01/28/2021 | 01/29/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/28/2021 | 01/29/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 01/28/2021 | 01/29/2021 |
| Note: Held By: CPISCITELLI 1. Provide Energy calcs from 2020 7th edition code cycle 2. The 2nd page of Energy calcs need to be signed by the builder below the preparer | |||
| PLUM | COMPLETE | 01/28/2021 | 01/30/2021 |
| Note: Released By: JPI | |||
| ZON | HOLD | 01/28/2021 | 01/28/2021 |
| Note: Held By: ELENS The setbacks on the site plan and in the Zoning Note are incorrect. The setbacks stated and shown are for SFR2 zoning and this lot is SFR3. Please provide the width of the walkway on the site plan. Need to show the easements on the site plan. Need to provide the rear setback on the site plan. Four trees are required. Need one more. 16 foundation plantings are required in addition to the A/C screening. 8 across the front and 4 on each side. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| REINSPECTION FEE | ¤40.00 | 11/02/2021 |
| REINSPECTION FEE | ¤40.00 | 11/02/2021 |
| REINSPECTION FEE | ¤40.00 | 11/02/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤502.00 | 03/02/2021 |
| SITE PLAN 20 | ¤20.00 | 03/02/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/02/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/02/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/02/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/02/2021 |
| SEWER INSPECTION | ¤25.00 | 03/02/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/02/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/02/2021 |
| BUILDING DISCOUNT 100% | (¤1,254.20) | 03/02/2021 |
| ELECTRIC FEE | ¤210.60 | 03/02/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/02/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/02/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/02/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/02/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/02/2021 |
| MECHANICAL FEE | ¤210.60 | 03/02/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/02/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/02/2021 |
| PLAN CHECK FEE | ¤100.40 | 03/02/2021 |
| PLUMBING FEE | ¤210.60 | 03/02/2021 |
| METER - DEPOSIT | ¤60.00 | 03/02/2021 |
| WATER- TURN ON | ¤25.00 | 03/02/2021 |
| ADMIN FEE | ¤20.00 | 03/02/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,331.43 |