I want to search for...

Permit #2021020102

Permit Details

Status: COED

Parcel Id: 07-11-31-7022-00150-0190
CONDITIONED SPACE: 2475 sqft
OPENED PORCH (WITH ROOF) : 504 sqft
OPENED PORCH (WITH ROOF) : 96 sqft
GARAGE: 1210 sqft
Total Square Footage: 4285 sqft
Block: 00150
Subdivision: 2217 - SECTION 22-WYNNFIELD
Job Phone: 386-627-0430
Location Address: 6 WESTGABLE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/15/2021
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: KNAPIK, PETER & ALEKSANDRA

Address

5 RAE DR

PALM COAST, FL 32164

Lot: 0190
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/17/2022 FINAL APPROVED MKRASKI
ROW - STORMWATER FINAL 04/25/2022 APPROVED - AS NOTED EMADISON
Note: All correction have been made, at the time of the inspection everything looks good THIS IS A REINSPECTION 04/8/22= ON THE RIGHT SIDE WHERE THE POOL PUMP IS TO THE BACK WATER IS GOING TO THE HOME OWNER ON THE RIGHT SIDE. IN THE BACK SLOPE WATER IS GOING TO THE HOME OWNER ON THE BACK. PLEASE IF YOU CONTACT THE INSPECTOR WE CAN GET A MEETING HERE AT THE SITE. GBERTOLA 386-225-3840 2/23/22 /23/22 THE TWO PALM TREE IN BACK ARE NOT ON SITE PLAN OR LANDSCAPING PLANS NEED TO SUBMIT A NEW SITE PLAN SHOWING PALMS AND DRAINAGE THAT GOES AROUND THE PLAMS THE TWO PALM TREE, THEY ARE RIGHT ON THE CENTER OF THE DRAINAGE CONVEYANCE WATER NEED TO FLOW TO THE FRONT NO TO THE BACK The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. sec 300.01 c8
ROW- PROJECT STATUS 04/21/2022 APPROVED GBERTOLA
Note: meeting with the gm and landscaping guy
ROW FIELD SURVEY /GRADING CERTIFICATION 04/08/2022 APPROVED GBERTOLA
Note: 04/08/22=correction were made 3/23/22 THE TWO PALM TREE IN BACK ARE NOT ON SITE PLAN OR LANDSCAPING PLANS NEED TO SUBMIT A NEW SITE PLAN SHOWING PALMS AND DRAINAGE THAT GOES AROUNF PLAMS THE TWO PALM TREE, THEY ARE RIGHT ON THE CENTER OF THE DRAINAGE CONVEYANCE WATER NEED TO FLOW TO THE FRONT NO TO THE BACK The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW - STORMWATER FINAL 04/08/2022 Disapproved - NO FEE GBERTOLA
Note: 04/8/22= ON THE RIGHT SIDE WHERE THE POOL PUMP IS TO THE BACK WATER IS GOING TO THE HOME OWNER ON THE RIGHT SIDE. IN THE BACK SLOPE WATER IS GOING TO THE HOME OWNER ON THE BACK. PLEASE IF YOU CONTACT THE INSPECTOR WE CAN GET A MEETING HERE AT THE SITE. GBERTOLA 386-225-3840 2/23/22 /23/22 THE TWO PALM TREE IN BACK ARE NOT ON SITE PLAN OR LANDSCAPING PLANS NEED TO SUBMIT A NEW SITE PLAN SHOWING PALMS AND DRAINAGE THAT GOES AROUND THE PLAMS THE TWO PALM TREE, THEY ARE RIGHT ON THE CENTER OF THE DRAINAGE CONVEYANCE WATER NEED TO FLOW TO THE FRONT NO TO THE BACK The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. sec 300.01 c8
U -UTILITY RESIDENTIAL FINAL 03/23/2022 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 03/23/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 2/23/22 /23/22 THE TWO PALM TREE IN BACK ARE NOT ON SITE PLAN OR LANDSCAPING PLANS NEED TO SUBMIT A NEW SITE PLAN SHOWING PALMS AND DRAINAGE THAT GOES AROUND THE PLAMS THE TWO PALM TREE, THEY ARE RIGHT ON THE CENTER OF THE DRAINAGE CONVEYANCE WATER NEED TO FLOW TO THE FRONT NO TO THE BACK 3/23/22 - Landscaping in the easement on the right side near driveway need to be relocated. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. sec 300.01 c8
ROW FIELD SURVEY /GRADING CERTIFICATION 03/23/2022 Disapproved - NO FEE PFLANAGAN
Note: 3/23/22 THE TWO PALM TREE IN BACK ARE NOT ON SITE PLAN OR LANDSCAPING PLANS NEED TO SUBMIT A NEW SITE PLAN SHOWING PALMS AND DRAINAGE THAT GOES AROUND THE PLAMS THE TWO PALM TREE, THEY ARE RIGHT ON THE CENTER OF THE DRAINAGE CONVEYANCE WATER NEED TO FLOW TO THE FRONT NO TO THE BACK The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW - FINAL APRON (AFTER POUR) 03/23/2022 APPROVED PFLANAGAN
U-CROSS CONNECTION 03/23/2022 APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 03/15/2022 Disapproved - NO FEE GBERTOLA
Note: THE TWO PALM TREE, THEY ARE RIGHT ON THE CENTER OF THE DRAINAGE CONVEYANCE WATER NEED TO FLOW TO THE FRONT NO TO THE BACK The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) in the back of the property we need a 4:1 slope The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. sec 300.01 c8
FINAL SURVEY (OFFICE USE ONLY) 03/15/2022 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 10/21/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION BOTH CULVERT PIPE ARE OUT OF TOLERANCE BOTH END driveway on the right side is ready to pour, AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. DRIVEWAY ON THE LEFT READY TO POUR NEED TO CALL FOR THE SUB BASE IS INTALLED SUB BASE IS OK
ROW- PRE-APRON (PRE-POUR) 10/15/2021 PARTIALLY APPROVED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION BOTH CULVERT PIPE ARE OUT OF TOLERANCE BOTH END driveway on the right side is ready to pour, AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. DRIVEWAY ON THE LEFT READY TO POUR NEED TO CALL FOR THE SUB BASE IS INTALLED
ROW- PRE-APRON (PRE-POUR) 10/14/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: BOTH CULVERT PIPE ARE OUT OF TOLERANCE BOTH END
ROW- PRE-APRON (PRE-POUR) 10/14/2021 PARTIALLY APPROVED GBERTOLA
Note: THIS IS A REINSPECTION BOTH CULVERT PIPE ARE OUT OF TOLERANCE BOTH END driveway on the right side is ready to pour, AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. CULVERT PIPE ON THE LEFT SIDE STILL OUT OF TOLERANCE
ROW- PAVER RESTRAINTS 10/14/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 10/07/2021 APPROVED - AS NOTED JMUNSON
Note: 1. Emailed FPL at 9:41 am 2. By final show upgraded service and generator outlet on electric plan
GRAVITY SEWER TEST 09/27/2021 APPROVED MGIBSON
U - SEWER TIE IN 09/27/2021 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 08/30/2021 APPROVED FWILLIS
INSULATION 08/12/2021 APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 8-11-21... NEED INSULATION CERTIFICATE ENERGY CONSERVATION R303.1.1.2
INSULATION 08/11/2021 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 8-11-21... NEED INSULATION CERTIFICATE ENERGY CONSERVATION R303.1.1.2
INSULATION 08/10/2021 CANCELLED BY APPLICANT FWILLIS
Note: THIS IS A REINSPECTION
INSULATION 08/09/2021 CANCELLED BY APPLICANT FWILLIS
ALL ROUGH 07/30/2021 APPROVED FWILLIS
ELECTRIC-TUG 06/11/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:11 am
ELECTRIC-TUG 06/09/2021 Disapproved -FEE REQUIRED RMARTIN
Note: NOT READY
ROOF VALLEY & METAL 06/04/2021 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/18/2021 APPROVED - AS NOTED JWALKER
Note: Missing 2 HGT-2's Hold down anchors at both ends of Truss T-13 Heta 20 hold downs straps need to be nailed as per manufatures detail. Check at all rough.
TIE BEAM / LINTEL 04/16/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 04/15/2021 APPROVED TBAKER
MONOLITHIC SLAB 03/30/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION Missing upright in master bedroom. Missing bars at front entry pads. See Detail 2 03-30-21... notes above resloved
MONOLITHIC SLAB 03/29/2021 Disapproved - NO FEE JBODEN
Note: Missing upright in master bedroom. Missing bars at front entry pads. See Detail 2
PLUMBING 1ST ROUGH UNDERGROUND 03/19/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/24/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
ELEC COMPLETE 03/31/2022 04/01/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
URB COMPLETE 03/28/2022 03/30/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
ENGIN1 COMPLETE 04/14/2021 04/15/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/14/2021 04/15/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 02/11/2021 02/11/2021
Note: Released By: AMOBLEY
ELEC COMPLETE 02/08/2021 02/08/2021
Note: Released By: JMUNSON
BLD COMPLETE 02/08/2021 02/11/2021
Note: Released By: JPI
ZON HOLD 02/08/2021 02/09/2021
Note: Held By: AMOBLEY Please have notary write in the owners names at the bottom of agreement showing she notarized their signatures and turn in the original signed copy to City Hall Zoning department.
SWALE COMPLETE 02/02/2021 05/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 02/01/2021 02/03/2021
Note: Held By: JPI 1. Provide size of attic access per R807. 2. There are two items on Product approval spec sheet that are not current with 2020 code cycle. Item 23352, soffit and 362, roof vent. Please provide the updated product version.
CUSVC COMPLETE 02/01/2021 02/03/2021
Note: Released By: BVITALE
ELEC HOLD 02/01/2021 02/02/2021
Note: Held By: JMUNSON Need light switch for outside lights in master bedroom. NEC 2017 210.70(A)(2)(2)
ENGIN1 COMPLETE 02/01/2021 02/02/2021
Note: Released By: TBAKER
LOCATE COMPLETE 02/01/2021 02/02/2021
Note: Released By: CSTONE
MECH COMPLETE 02/01/2021 02/02/2021
Note: Released By: CPISCITELLI
PLUM COMPLETE 02/01/2021 02/03/2021
Note: Released By: JPI
SW1 COMPLETE 02/01/2021 02/03/2021
Note: Released By: KRUTH
ZON HOLD 02/01/2021 02/04/2021
Note: Held By: AMOBLEY Please provide a right of way utilization agreement signed by all owners on deed and notarized for paver driveway. Original must be turned in to us for recording Plans state a tile roof but color sheet states a shingle roof. Please correct whichever is wrong.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/17/2022
CONTRACTOR CHANGE ¤40.00 05/17/2022
REINSPECTION FEE ¤40.00 05/17/2022
SW ENG REINSPECTION 20 ¤20.00 05/17/2022
SW ENG REINSPECTION 30 ¤30.00 05/17/2022
STORM WATER PERMIT FEES ¤80.00 02/15/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 02/15/2021
SEWER CREDIT (¤1,342.00) 02/15/2021
SEWER INSPECTION ¤25.00 02/15/2021
SEWER CAPITAL FACILITY ¤4,664.55 02/15/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 02/15/2021
NEW RESIDENTIAL INSPECTIONS ¤700.00 02/15/2021
SITE PLAN 20 ¤20.00 02/15/2021
SURCHARGE FS 533.721 ¤2.00 02/15/2021
SURCHARGE - FS 468.631 ¤2.00 02/15/2021
METER - DEPOSIT ¤60.00 02/15/2021
WATER- TURN ON ¤25.00 02/15/2021
ADMIN FEE ¤20.00 02/15/2021
CONNECTION FEES ¤1,017.83 02/15/2021
BUILDING DISCOUNT 100% (¤1,670.00) 02/15/2021
ELECTRIC FEE ¤270.00 02/15/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 02/15/2021
IMPACT FEE FIRE ¤367.00 02/15/2021
IMPACT FEE PARKS ¤1,199.12 02/15/2021
IMPACT FEE SCHOOL ¤3,600.00 02/15/2021
RECORDING FEE REIMBURSE DOC ¤44.00 02/15/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 02/15/2021
MECHANICAL FEE ¤270.00 02/15/2021
WATER -IRRIGATION INSPECTION ¤25.00 02/15/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 02/15/2021
PLAN CHECK FEE ¤140.00 02/15/2021
PLUMBING FEE ¤270.00 02/15/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,003.43