I want to search for...

Permit #2021020261

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00350-0240
CONDITIONED SPACE: 2258 sqft
GARAGE: 767 sqft
OPENED PORCH (WITH ROOF) : 276 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
Total Square Footage: 3365 sqft
Block: 00350
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-4799
Location Address: 13 EASTGATE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/24/2021
NOC: RECORDED
Applicant name: JOHN DONALD GORDON
Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA

Address

7755 SOUTH US #1

BUNNELL, FL 32110

Lot: 0240
Contracted Stated Job Value: ¤230,000.00
Job Description: Single family residence
Type: CN

Contractor

PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

7755 S. US HWY 1

BUNNELL, FL 32110

CGC1528576 (Exp: 08/31/2026) 386-931-4799

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290

Inspection History

Type Request Date Result Inspector
ROW - DRAINAGE 08/12/2021 APPROVED RGROSS
BLD - BUILDING FINAL 08/12/2021 FINAL APPROVED TSTAUFFACHER
U -UTILITY RESIDENTIAL FINAL 08/12/2021 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 08/12/2021 APPROVED - AS NOTED RGROSS
Note: Builder grade a few tenths higher that Final survey to try to prevent standing water and dying sod. However, this area's water table is so high that no amount of sod or grading would prevent the swale being full of water. Raising the elevation any higher would block water from the uphill lots. Therefore being approved as noted that the builder has done everything possible to meet the city regulations for a Storm Water Final.
ROW - FINAL APRON (AFTER POUR) 08/12/2021 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 08/12/2021 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION SWALE IN FRONT OF THE HOUSE NEED TO BE RAISED TO LOW COLLECTING A LOT OF WATER, FINAL SURVEY BY THE EMPTY LOT IS 24.83 ON THE EMPTY LOT 24.56, NEED TO MATCH EXISTEN GRADE ON THE EMPTY LOT WATER FLOW TO LTHE LEFT 8/12/21 - See notes on Final Storm Water. Empty lot next door has been surveyed and is going to be cleared by the same builder very soon.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/11/2021 Disapproved - NO FEE GBERTOLA
Note: SWALE IN FRONT OF THE HOUSE NEED TO BE RAISED TO LOW COLLECTING A LOT OF WATER, FINAL SURVEY BY THE EMPTY LOT IS 24.83 ON THE EMPTY LOT 24.56, NEED TO MATCH EXISTEN GRADE ON THE EMPTY LOT WATER FLOW TO LTHE LEFT SOD IS FLOATING ON TOP OF THE WATER
FINAL SURVEY (OFFICE USE ONLY) 08/11/2021 APPROVED GBERTOLA
U-CROSS CONNECTION 07/30/2021 APPROVED - AS NOTED LFITZGERALD
Note: well irrigation-no cross connection
U - SEWER TIE IN 07/14/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 07/14/2021 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 07/13/2021 APPROVED RGROSS
Note: READY TO POUR
ROW- PRE-APRON (PRE-POUR) 07/12/2021 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 06/21/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:10 am
PEP TANK INSTALLATION REQUEST 06/02/2021 APPROVED CSTONE
INSULATION 05/24/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Fire blocking left of range hood vent has been damaged Fill large gaps in wall between kitchen and master bedroom at fire blocking Wire in utility room for ceiling fixture will be buried in drywall Note// dead wood in back left room is falling down
INSULATION 05/21/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Fire blocking left of range hood vent has been damaged Fill large gaps in wall between kitchen and master bedroom at fire blocking Wire in utility room for ceiling fixture will be buried in drywall Note// dead wood in back left room is falling down
ALL ROUGH 05/03/2021 APPROVED JWALKER
LATH/BRICK/ WATER BARRIER 05/03/2021 APPROVED JWALKER
ROOF VALLEY & METAL 04/26/2021 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/19/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 04/16/2021 APPROVED TBAKER
TIE BEAM / LINTEL 04/05/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Not finished at 2.30
TIE BEAM / LINTEL 04/01/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Not finished at 2.30
WILDLIFE CHECK - ENVIRONMENTAL 03/30/2021 APPROVED JMYERS
MONOLITHIC SLAB 03/16/2021 APPROVED WMILLER
PLUMBING 1ST ROUGH UNDERGROUND 03/12/2021 APPROVED JGIBSON
ELECTRIC TEMP POLE 03/10/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 11:15 am
WATER METER INSTALLATION REQUEST 03/04/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/15/2021 04/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2021 04/15/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 02/22/2021 02/23/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 02/16/2021 02/17/2021
Note: Released By: JMUNSON
MECH HOLD 02/16/2021 02/17/2021
Note: Held By: CPISCITELLI Duct layout needs to be signed by the AC contractor
BLD COMPLETE 02/16/2021 02/19/2021
Note: Released By: JPI
PLENV COMPLETE 02/09/2021 02/11/2021
Note: Released By: JMYERS Staff conducted a site visit on 2/11/2021 and did not find any Gopher Tortoise or their burrows.
SWALE COMPLETE 02/04/2021 05/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 02/03/2021 02/08/2021
Note: Held By: JPI 1. It appears an incomplete set of plans has been submitted. Without a cover sheet or a drawing index its difficult to tell, however sheets 4 and 5 are not in set and there is no foundation plan. 2. Please provide a full set of complete plans for review. However the following comments are from plans submitted. 3. Provide full structural construction details on front entry. Framing, frame outs, knee walls, etc… Include all attachments, connectors, and detailed construction methods. Provide appropriate sections thru entry to detail construction. 4. Provide attic access size. 5. Two differing roof sheathing nailing patterns given on page 6. Detail and section are different. Please choose the one which will apply to the project. 6. Conventional valley framing detail is missing attachment details: sole plate to truss, collar ties, rafter to ridge if under 3 feet, rafter to sole plate if under 3 feet. Etc. Please review detail and provide all connections. 7. Provide complete attachments for gable end detail. 8. Provide type of construction and occupancy classification. 9. Please correct address on drawings and product approval spec sheet. 10. Please provide a product approval number for mullions.
CUSVC COMPLETE 02/03/2021 02/05/2021
Note: Released By: BVITALE
ELEC HOLD 02/03/2021 02/04/2021
Note: Held By: JMUNSON Submit electrical plan, Load calcs and riser diagram
ENGIN1 COMPLETE 02/03/2021 02/04/2021
Note: Released By: TBAKER
LOCATE COMPLETE 02/03/2021 02/05/2021
Note: Released By: CSTONE
MECH HOLD 02/03/2021 02/04/2021
Note: Held By: CPISCITELLI Provide Energy calcs, heatload, and duct layout signed by the AC contractor
PLUM COMPLETE 02/03/2021 02/08/2021
Note: Released By: JPI
SW1 COMPLETE 02/03/2021 02/11/2021
Note: Released By: CTROHA
ZON COMPLETE 02/03/2021 02/08/2021
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - FIELD SURVEY INSPECT ¤20.00 08/13/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 08/13/2021
SW ENG - INSPECTION 20 ¤20.00 08/13/2021
STORM WATER PERMIT FEES ¤80.00 02/24/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 02/24/2021
SEWER CREDIT (¤850.00) 02/24/2021
SEWER INSPECTION ¤25.00 02/24/2021
SEWER CAPITAL FACILITY ¤4,664.55 02/24/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 02/24/2021
METER - DEPOSIT ¤60.00 02/24/2021
WATER- TURN ON ¤25.00 02/24/2021
ADMIN FEE ¤20.00 02/24/2021
CONNECTION FEES ¤1,017.83 02/24/2021
BUILDING DISCOUNT 100% (¤1,443.20) 02/24/2021
ELECTRIC FEE ¤237.60 02/24/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 02/24/2021
IMPACT FEE FIRE ¤367.00 02/24/2021
IMPACT FEE PARKS ¤1,199.12 02/24/2021
IMPACT FEE SCHOOL ¤3,600.00 02/24/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 02/24/2021
MECHANICAL FEE ¤237.60 02/24/2021
WATER -IRRIGATION INSPECTION ¤25.00 02/24/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 02/24/2021
PLAN CHECK FEE ¤118.40 02/24/2021
PLUMBING FEE ¤237.60 02/24/2021
NEW RESIDENTIAL INSPECTIONS ¤592.00 02/24/2021
SITE PLAN 20 ¤20.00 02/24/2021
SURCHARGE FS 533.721 ¤2.00 02/24/2021
SURCHARGE - FS 468.631 ¤2.00 02/24/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,341.43