I want to search for...

Permit #2021020266

Permit Details

Status: COED

Parcel Id: 07-11-31-7022-00280-0130
CONDITIONED SPACE: 2282 sqft
GARAGE: 673 sqft
OPENED PORCH (WITH ROOF) : 252 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
Total Square Footage: 3245 sqft
Block: 00280
Subdivision: 2217 - SECTION 22-WYNNFIELD
Job Phone: (386) 246-6123
Location Address: 96 WESTROBIN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/10/2021
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PKWY STE 7

PALM COAST, FL 32164

Lot: 0130
Contracted Stated Job Value: ¤228,026.00
Job Description: SINGLE FAMILY RESIDENTIAL
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/31/2021 FINAL APPROVED KSANDOE
ROW - FINAL APRON (AFTER POUR) 08/31/2021 APPROVED KRUTH
Note: the concrete apron wing on the right side has a broken point cut back on both sides to make even or repour the corner is my suggestion corrections made
ROW - STORMWATER FINAL 08/31/2021 APPROVED - AS NOTED KRUTH
Note: the dumpster and porta john is the other home being built not 96
U -UTILITY RESIDENTIAL FINAL 08/27/2021 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 08/27/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 08/23/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 08/23/2021 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 07/23/2021 APPROVED - AS NOTED RGROSS
Note: Face board was knocked loose at the center joint. Make sure face board is level all the way across to avoid a bird bath in the center after the pour. After that...READY TO POUR. NOTE: Heavy rain is in the forecast this weekend. Builder should double check Culvert elevation before pouring.
ELECTRIC - EARLY POWER 07/20/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:47 am
LATH/BRICK/ WATER BARRIER 05/28/2021 APPROVED MMESSER
INSULATION 05/27/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION
INSULATION 05/26/2021 CANCELLED BY APPLICANT JWALKER
ALL ROUGH 05/19/2021 APPROVED - AS NOTED JWALKER
Note: Several Anchor bolt nuts at bearing wall in garage need to be thightened. Seal all joints on dryer duct and kitchen duct ehaust vents. Set screws in jamb properly at sliding glass doors. Missing nail plate at UFB wire in master bath near sink drain. Check above listed at insulation inspection
ROOF VALLEY & METAL 05/13/2021 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/06/2021 APPROVED - AS NOTED JWALKER
Note: Trusses T-09 and T-14 missing engineering marked on engineer packet. Check at all rough
TIE BEAM / LINTEL 04/20/2021 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 04/19/2021 APPROVED TBAKER
U - SEWER TIE IN 03/30/2021 APPROVED JGIBSON
MONOLITHIC SLAB 03/25/2021 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION NO APPROVED PLANS IN CONSTRUCTION BOX. NO PROOF OF COMPACTION AND TERMITE PROTECTION. 03-25-21... still needs compaction report
MONOLITHIC SLAB 03/25/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NO APPROVED PLANS IN CONSTRUCTION BOX. NO PROOF OF COMPACTION AND TERMITE PROTECTION. 03-25-21... still needs compaction report 03-25-21... after todays inspection DR was able to get the compaction report in the box, I was able to come back to verify, result is now approved
MONOLITHIC SLAB 03/24/2021 Disapproved -FEE REQUIRED FWILLIS
Note: NO APPROVED PLANS IN CONSTRUCTION BOX. NO PROOF OF COMPACTION AND TERMITE PROTECTION.
PLUMBING 1ST ROUGH UNDERGROUND 03/22/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 03/22/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/26/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/16/2021 04/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/16/2021 04/16/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 02/10/2021 02/10/2021
Note: Released By: CPISCITELLI
MECH HOLD 02/08/2021 02/08/2021
Note: Held By: CPISCITELLI Energy calcs need to be from 2020 7Th edition code cycle. (Second Request)
ZON COMPLETE 02/08/2021 02/08/2021
Note: Released By: AMOBLEY
MECH HOLD 02/08/2021 02/09/2021
Note: Held By: CPISCITELLI Square footage on Energy Calcs and heatload does not match the plans. Revise to match the plans
SWALE COMPLETE 02/04/2021 05/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 02/03/2021 02/04/2021
Note: Released By: JPI
CUSVC COMPLETE 02/03/2021 02/05/2021
Note: Released By: BVITALE
ELEC COMPLETE 02/03/2021 02/04/2021
Note: Released By: JMUNSON
ENGIN1 COMPLETE 02/03/2021 02/04/2021
Note: Released By: TBAKER
LOCATE COMPLETE 02/03/2021 02/05/2021
Note: Released By: CSTONE
MECH HOLD 02/03/2021 02/04/2021
Note: Held By: CPISCITELLI Energy calcs need to be from 2020 7Th edition code cycle
PLUM COMPLETE 02/03/2021 02/04/2021
Note: Released By: JPI
SW1 COMPLETE 02/03/2021 02/08/2021
Note: Released By: KRUTH
ZON HOLD 02/03/2021 02/08/2021
Note: Held By: AMOBLEY Please provide garage door color on color sheet for review

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 09/01/2021
REINSPECTION FEE ¤40.00 09/01/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 09/01/2021
STORM WATER PERMIT FEES ¤80.00 02/10/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 02/10/2021
SEWER CREDIT (¤1,147.00) 02/10/2021
SEWER INSPECTION ¤25.00 02/10/2021
SEWER CAPITAL FACILITY ¤4,664.55 02/10/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 02/10/2021
NEW RESIDENTIAL INSPECTIONS ¤586.00 02/10/2021
SITE PLAN 20 ¤20.00 02/10/2021
SURCHARGE FS 533.721 ¤2.00 02/10/2021
SURCHARGE - FS 468.631 ¤2.00 02/10/2021
METER - DEPOSIT ¤60.00 02/10/2021
WATER- TURN ON ¤25.00 02/10/2021
ADMIN FEE ¤20.00 02/10/2021
CONNECTION FEES ¤1,017.83 02/10/2021
BUILDING DISCOUNT 100% (¤1,430.60) 02/10/2021
ELECTRIC FEE ¤235.80 02/10/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 02/10/2021
IMPACT FEE FIRE ¤367.00 02/10/2021
IMPACT FEE PARKS ¤1,199.12 02/10/2021
IMPACT FEE SCHOOL ¤3,600.00 02/10/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 02/10/2021
MECHANICAL FEE ¤235.80 02/10/2021
WATER -IRRIGATION INSPECTION ¤25.00 02/10/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 02/10/2021
PLAN CHECK FEE ¤117.20 02/10/2021
PLUMBING FEE ¤235.80 02/10/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,084.43