I want to search for...
Permit #2021020266
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00280-0130 |
| CONDITIONED SPACE: 2282 sqft |
| GARAGE: 673 sqft |
| OPENED PORCH (WITH ROOF) : 252 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| Total Square Footage: 3245 sqft |
| Block: 00280 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: (386) 246-6123 |
| Location Address: 96 WESTROBIN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/10/2021 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PKWY STE 7 PALM COAST, FL 32164 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤228,026.00 |
| Job Description: SINGLE FAMILY RESIDENTIAL |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/31/2021 | FINAL APPROVED | KSANDOE |
| ROW - FINAL APRON (AFTER POUR) | 08/31/2021 | APPROVED | KRUTH |
| Note: the concrete apron wing on the right side has a broken point cut back on both sides to make even or repour the corner is my suggestion corrections made | |||
| ROW - STORMWATER FINAL | 08/31/2021 | APPROVED - AS NOTED | KRUTH |
| Note: the dumpster and porta john is the other home being built not 96 | |||
| U -UTILITY RESIDENTIAL FINAL | 08/27/2021 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 08/27/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/23/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 08/23/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 07/23/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Face board was knocked loose at the center joint. Make sure face board is level all the way across to avoid a bird bath in the center after the pour. After that...READY TO POUR. NOTE: Heavy rain is in the forecast this weekend. Builder should double check Culvert elevation before pouring. | |||
| ELECTRIC - EARLY POWER | 07/20/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:47 am | |||
| LATH/BRICK/ WATER BARRIER | 05/28/2021 | APPROVED | MMESSER |
| INSULATION | 05/27/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 05/26/2021 | CANCELLED BY APPLICANT | JWALKER |
| ALL ROUGH | 05/19/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Several Anchor bolt nuts at bearing wall in garage need to be thightened. Seal all joints on dryer duct and kitchen duct ehaust vents. Set screws in jamb properly at sliding glass doors. Missing nail plate at UFB wire in master bath near sink drain. Check above listed at insulation inspection | |||
| ROOF VALLEY & METAL | 05/13/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Trusses T-09 and T-14 missing engineering marked on engineer packet. Check at all rough | |||
| TIE BEAM / LINTEL | 04/20/2021 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 04/19/2021 | APPROVED | TBAKER |
| U - SEWER TIE IN | 03/30/2021 | APPROVED | JGIBSON |
| MONOLITHIC SLAB | 03/25/2021 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION NO APPROVED PLANS IN CONSTRUCTION BOX. NO PROOF OF COMPACTION AND TERMITE PROTECTION. 03-25-21... still needs compaction report | |||
| MONOLITHIC SLAB | 03/25/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NO APPROVED PLANS IN CONSTRUCTION BOX. NO PROOF OF COMPACTION AND TERMITE PROTECTION. 03-25-21... still needs compaction report 03-25-21... after todays inspection DR was able to get the compaction report in the box, I was able to come back to verify, result is now approved | |||
| MONOLITHIC SLAB | 03/24/2021 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: NO APPROVED PLANS IN CONSTRUCTION BOX. NO PROOF OF COMPACTION AND TERMITE PROTECTION. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/22/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 03/22/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/26/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/16/2021 | 04/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/10/2021 | 02/10/2021 |
| Note: Released By: CPISCITELLI | |||
| MECH | HOLD | 02/08/2021 | 02/08/2021 |
| Note: Held By: CPISCITELLI Energy calcs need to be from 2020 7Th edition code cycle. (Second Request) | |||
| ZON | COMPLETE | 02/08/2021 | 02/08/2021 |
| Note: Released By: AMOBLEY | |||
| MECH | HOLD | 02/08/2021 | 02/09/2021 |
| Note: Held By: CPISCITELLI Square footage on Energy Calcs and heatload does not match the plans. Revise to match the plans | |||
| SWALE | COMPLETE | 02/04/2021 | 05/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/03/2021 | 02/04/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 02/03/2021 | 02/05/2021 |
| Note: Released By: BVITALE | |||
| ELEC | COMPLETE | 02/03/2021 | 02/04/2021 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 02/03/2021 | 02/04/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/03/2021 | 02/05/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 02/03/2021 | 02/04/2021 |
| Note: Held By: CPISCITELLI Energy calcs need to be from 2020 7Th edition code cycle | |||
| PLUM | COMPLETE | 02/03/2021 | 02/04/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/03/2021 | 02/08/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 02/03/2021 | 02/08/2021 |
| Note: Held By: AMOBLEY Please provide garage door color on color sheet for review |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 09/01/2021 |
| REINSPECTION FEE | ¤40.00 | 09/01/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 09/01/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/10/2021 |
| SEWER CREDIT | (¤1,147.00) | 02/10/2021 |
| SEWER INSPECTION | ¤25.00 | 02/10/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 02/10/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 02/10/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 02/10/2021 |
| SITE PLAN 20 | ¤20.00 | 02/10/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/10/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/10/2021 |
| METER - DEPOSIT | ¤60.00 | 02/10/2021 |
| WATER- TURN ON | ¤25.00 | 02/10/2021 |
| ADMIN FEE | ¤20.00 | 02/10/2021 |
| CONNECTION FEES | ¤1,017.83 | 02/10/2021 |
| BUILDING DISCOUNT 100% | (¤1,430.60) | 02/10/2021 |
| ELECTRIC FEE | ¤235.80 | 02/10/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 02/10/2021 |
| IMPACT FEE FIRE | ¤367.00 | 02/10/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 02/10/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/10/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/10/2021 |
| MECHANICAL FEE | ¤235.80 | 02/10/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/10/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 02/10/2021 |
| PLAN CHECK FEE | ¤117.20 | 02/10/2021 |
| PLUMBING FEE | ¤235.80 | 02/10/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,084.43 |