I want to search for...
Permit #2021020444
Permit Details
Status: COED
| Parcel Id: 07-11-31-7006-00040-0120 |
| CONDITIONED SPACE: 2084 sqft |
| GARAGE: 675 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 578 sqft |
| Total Square Footage: 3376 sqft |
| Block: 00040 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: 386-447-4400 |
| Location Address: 24 FLINTSTONE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/04/2021 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: PARKS, SCOTT & MARI |
|
Address 36 FAIRHILL LN PALM COAST, FL 32137 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤355,300.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/16/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Master bath GFCI has no power. 2. Microwave not installed. 3. Seal duct at AHU at ceiling. 4. AC equipment installed does not match the Energy Calcs. 5. Ceiling lights in guest bedrooms and master bedroom not working. | |||
| U-CROSS CONNECTION | 06/13/2022 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 06/13/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Master bath GFCI has no power. 2. Microwave not installed. 3. Seal duct at AHU at ceiling. 4. AC equipment installed does not match the Energy Calcs. 5. Ceiling lights in guest bedrooms and master bedroom not working. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/09/2022 | FINAL APPROVED | DHANEY |
| ROW - DRAINAGE | 06/08/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION Inspect for swlae blockage W/O #25389 12/15/21 - Swale is completely blocked. Next Inspection. 12/17/21. Contacted builder to let him know we would be back Friday. Said He would contact Darrell Cone for corrections. | |||
| ROW - STORMWATER FINAL | 06/08/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 06/08/2022 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/08/2022 | APPROVED | EMADISON |
| FINAL SURVEY (OFFICE USE ONLY) | 06/08/2022 | APPROVED | EMADISON |
| ROW- PAVER RESTRAINTS | 04/20/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION call in for the paver restraints after the restraints are poured and the matierial is compacted | |||
| ROW- PAVER RESTRAINTS | 04/18/2022 | CANCELLED BY APPLICANT | RGROSS |
| Note: THIS IS A REINSPECTION call in for the paver restraints after the restraints are poured and the matierial is compacted | |||
| ELECTRIC - EARLY POWER | 03/28/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:15 | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PAVER RESTRAINTS | 03/15/2022 | PARTIALLY APPROVED | KRUTH |
| Note: call in for the paver restraints after the restraints are poured and the matierial is compacted | |||
| LATH/BRICK/ WATER BARRIER | 01/14/2022 | APPROVED | AGAETANO |
| INSULATION | 01/04/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 12/20/2021 | APPROVED | AGAETANO |
| ROW - DRAINAGE | 12/17/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION Inspect for swlae blockage W/O #25389 12/15/21 - Swale is completely blocked. Next Inspection. 12/17/21 corrections made | |||
| ROW - DRAINAGE | 12/15/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Inspect for swlae blockage W/O #25389 12/15/21 - Swale is completely blocked. Next Inspection. 12/17/21. Contacted builder to let him know we would be back Friday. Said He would contact Darrell Cone for corrections. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/12/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/12/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 11/12/2021 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 09/16/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 12:00 | |||
| TIE BEAM / LINTEL | 09/10/2021 | APPROVED | DCUSHING |
| ELEV CERT-FOUNDATION APPROVAL | 08/18/2021 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 08/18/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/16/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 07/15/2021 | CANCELLED BY APPLICANT | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/09/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/09/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 07/09/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/20/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/23/2022 | 06/23/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM WE NEED THE CERIFICATE OF COMPIANCE FOR TERMITE PROTECTION THIS A TREATMENT DOCUMENT NOT CERTIFICATE | |||
| PLFM | COMPLETE | 06/07/2022 | 06/08/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| BADMIN | INFORMATION | 05/16/2022 | 05/16/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM BLOWER DOOR TEST HAS TO BE 2020 CODE 7 EDTION THIS ONE IS 2017 6TH EDITION. | |||
| ZON | COMPLETE | 03/11/2022 | 03/11/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/18/2021 | 08/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 08/18/2021 | 08/18/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 08/18/2021 | 08/18/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/01/2021 | 03/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/01/2021 | 03/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/17/2021 | 02/17/2021 |
| Note: Released By: CPISCITELLI | |||
| ELEC | HOLD | 02/17/2021 | 02/17/2021 |
| Note: Held By: JMUNSON Electric load calcs do match the square footage of the house. | |||
| ZON | HOLD | 02/17/2021 | 02/18/2021 |
| Note: Held By: AMOBLEY No new landscape plan submitted with correction... Additional foundation plantings required along rear because house backs to a canal Additional foundation planting required along side to total four wrapping corners | |||
| PLFM | COMPLETE | 02/17/2021 | 02/17/2021 |
| Note: Released By: JMYERS The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO. | |||
| BLD | COMPLETE | 02/17/2021 | 02/19/2021 |
| Note: Released By: JPI | |||
| PLFM | HOLD | 02/10/2021 | 02/10/2021 |
| Note: Held By: JMYERS According to the Site Plan provided, the structure will be inside of the Special Flood Hazard Area. Please provide elevation certificates at construction, foundation, and final. | |||
| BLD | HOLD | 02/08/2021 | 02/11/2021 |
| Note: Held By: JPI 1. Siding, FL 24161 and roof tiles, FL 601, have not been approved for 2020 code cycle. Please select other products. 2. Step down from dwelling to garage is not illustrated on foundation plan or sheet 5 (structural). Please identify. 3. Rear porch section/wall detail not provided on page 5. 4. Provide a mixed construction detail of wood framing to block with attachments clearly identified. 5. Provide design loads, per R301. 6. Provide typical interior wall detail. 7. Product approval missing the following item: mullions. | |||
| CUSVC | COMPLETE | 02/08/2021 | 02/16/2021 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 02/08/2021 | 02/09/2021 |
| Note: Held By: JMUNSON 1. Electric load calcs do not match the square footage of the house. 2. Need smoke alarm outside of bedroom 2 and 3. FRC 2020 314.3 & 315.1 | |||
| ENGIN1 | COMPLETE | 02/08/2021 | 02/08/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/08/2021 | 02/10/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 02/08/2021 | 02/09/2021 |
| Note: Held By: CPISCITELLI Energy Calcs need to be signed by the builder | |||
| PLUM | COMPLETE | 02/08/2021 | 02/11/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/08/2021 | 02/16/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 02/08/2021 | 02/10/2021 |
| Note: Held By: AMOBLEY Additional foundation plantings required along rear because house backs to a canal Additional foundation planting required along side to total four wrapping corners Site plan/survey does not specify the apron being concrete or pavers Right of way agreement signed by all owners and notarized will be required if paver driveway will be going into the right of way. | |||
| SWALE | COMPLETE | 02/08/2021 | 05/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/16/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/16/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/16/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/04/2021 |
| SEWER INSPECTION | ¤25.00 | 03/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/04/2021 |
| METER - DEPOSIT | ¤60.00 | 03/04/2021 |
| WATER- TURN ON | ¤25.00 | 03/04/2021 |
| ADMIN FEE | ¤20.00 | 03/04/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/04/2021 |
| BUILDING DISCOUNT 100% | (¤1,695.20) | 03/04/2021 |
| ELECTRIC FEE | ¤273.60 | 03/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/04/2021 |
| MECHANICAL FEE | ¤273.60 | 03/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/04/2021 |
| PLAN CHECK FEE | ¤142.40 | 03/04/2021 |
| PLUMBING FEE | ¤273.60 | 03/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤712.00 | 03/04/2021 |
| SITE PLAN 20 | ¤20.00 | 03/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,191.43 |