Permit #2021020481

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00240-0250
CONDITIONED SPACE: 1280 sqft
CONDITIONED SPACE: 1280 sqft
GARAGE: 250 sqft
GARAGE: 250 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 3420 sqft
Block: 00240
Subdivision: 2211 - SECTION 59-SEMINOLE PARK
Job Phone: 386-447-7007
Location Address: 6 SEATON VALLEY PATH
Type: DU - DUPLEX
Issue Date: 05/14/2021
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: GULPE NATALIA

Address

37 PEAR BLOSSOM WAY

HOLLAND LANDING, 0

Lot: 0250
Contracted Stated Job Value: ¤312,000.00
Job Description: Duplex
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
FERNANDO MEZA SR
Status Location Address State License Number Phone
CANCEL

457 CHELSEA PLACE AV

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2022) 570-575-8139
FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 01/27/2023 FINAL APPROVED JHARDING
Note: 1/18/2023 - PREVIOUS INSPECTION NOTES need access to garages to inspect pep circuit breakers
U-CROSS CONNECTION 01/26/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
BLD - BUILDING FINAL 01/25/2023 FINAL APPROVED BTAYLOR
Note: 1/18/2023 - PREVIOUS INSPECTION NOTES Missing weatherstrip in both units Uncover smoke detectors Hot water not turned on No insulation certificate posted Provide ladder for inspection of attic space
BLD - BUILDING FINAL 01/18/2023 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 01/18/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Missing weatherstrip in both units Uncover smoke detectors Hot water not turned on No insulation certificate posted Provide ladder for inspection of attic space
U -UTILITY RESIDENTIAL FINAL 01/18/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: need access to garages to inspect pep circuit breakers
ROW - FINAL INSPECTION 01/17/2023 APPROVED GBERTOLA
Note: 01/17/23= CORRECTION WERE MADE 1/12/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE BACK AT THE VACANT LOT
ROW - FINAL INSPECTION 01/12/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE BACK AT THE VACANT LOT
ROW FIELD SURVEY /GRADING CERTIFICATION 01/12/2023 APPROVED PFLANAGAN
Note: 1/6/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL MATCH THE EXISTING GRADE ON LEFT PROPERTY LINE IN THE SWALE -------------------------------------------------------------------- 1/5/2023 - PREVIOUS INSPECTION NOTES THE SOD AT LEFT PROPERTY LINE NEED TO MATCH THE EXISTING GRADE IN THE SWALE
ROW - FINAL APRON (AFTER POUR) 01/12/2023 APPROVED PFLANAGAN
ROW- PROJECT STATUS 01/10/2023 APPROVED PFLANAGAN
Note: MEETING WITH CONTRACTOR TO SHOW HUMP IN SWALE THAT NEEDS GONE BEFORE FINAL PASSES
ROW - FINAL INSPECTION 01/06/2023 CANCELLED BY APPLICANT WEB
ROW FIELD SURVEY /GRADING CERTIFICATION 01/06/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO STILL MATCH THE EXISTING GRADE ON LEFT PROPERTY LINE IN THE SWALE -------------------------------------------------------------------- 1/5/2023 - PREVIOUS INSPECTION NOTES THE SOD AT LEFT PROPERTY LINE NEED TO MATCH THE EXISTING GRADE IN THE SWALE
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/05/2023 APPROVED PFLANAGAN
Note: 12/20/2022 - PREVIOUS INSPECTION NOTES 1) YOU ARE STILL FLOWING WATER ON TO LOTS AROUND YOURS 2) THE WATER IS STILL FLOW TOWARDS THE HOUSEIN THE BACK ----------------------------------------------------------------------------------------------- 11/30/2022 - PREVIOUS INSPECTION NOTES HERE ARE ALL THE THINGS THAT NEED TO BE CORRECTED BEFORE PASSING THE FINAL SIRVEY INSPECTION 1) YOUR DRAINAGE IS IMPACTING THE LOT AROUND YOUR 2) THERE ARE NO SWALE ELEVATION 3) THERE IS A HOLE IN THE BACK YARD THAT WON'T LET THE WATER TO FLOW TO THE SWALE IN THE FRONT 4) THE MIDDLE BACK YARD THE DRAINAGE IS FLPWING TO THE HOUSE 5) YOU NEED TO HAVE POSITIVE FALL FROM BACK TO FRONT EVERY 20' YOU NEED TO HAVE A MINIMUM OF 0.10 OF FALL 6) THE LEFT CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE DIAGRAM 7) THE RIGHT CULVERT PIPE IS PITCHED THE WRONG WAY NEEDS TO FLOW TO THE LEFT
ROW FIELD SURVEY /GRADING CERTIFICATION 01/05/2023 Disapproved - NO FEE PFLANAGAN
Note: THE SOD AT LEFT PROPERTY LINE NEED TO MATCH THE EXISTING GRADE IN THE SWALE
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/20/2022 Disapproved - NO FEE PFLANAGAN
Note: 1) YOU ARE STILL FLOWING WATER ON TO LOTS AROUND YOURS 2) THE WATER IS STILL FLOW TOWARDS THE HOUSEIN THE BACK ----------------------------------------------------------------------------------------------- 11/30/2022 - PREVIOUS INSPECTION NOTES HERE ARE ALL THE THINGS THAT NEED TO BE CORRECTED BEFORE PASSING THE FINAL SIRVEY INSPECTION 1) YOUR DRAINAGE IS IMPACTING THE LOT AROUND YOUR 2) THERE ARE NO SWALE ELEVATION 3) THERE IS A HOLE IN THE BACK YARD THAT WON'T LET THE WATER TO FLOW TO THE SWALE IN THE FRONT 4) THE MIDDLE BACK YARD THE DRAINAGE IS FLPWING TO THE HOUSE 5) YOU NEED TO HAVE POSITIVE FALL FROM BACK TO FRONT EVERY 20' YOU NEED TO HAVE A MINIMUM OF 0.10 OF FALL 6) THE LEFT CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE DIAGRAM 7) THE RIGHT CULVERT PIPE IS PITCHED THE WRONG WAY NEEDS TO FLOW TO THE LEFT
ROW- PROJECT STATUS 12/13/2022 APPROVED PFLANAGAN
Note: THIS WAS A MEET WITH THE BUILDER ABOUT THERE FINAL SURVEY THAT DIDNT PASS SHOWED HIM WHY IT DIDNT PASS AND NEED TO GET THEM TO TALK TO THE SURVEYOR TO REFLECT WHATS IN THE FIELD
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/30/2022 Disapproved - NO FEE PFLANAGAN
Note: HERE ARE ALL THE THINGS THAT NEED TO BE CORRECTED BEFORE PASSING THE FINAL SIRVEY INSPECTION 1) YOUR DRAINAGE IS IMPACTING THE LOT AROUND YOUR 2) THERE ARE NO SWALE ELEVATION 3) THERE IS A HOLE IN THE BACK YARD THAT WON'T LET THE WATER TO FLOW TO THE SWALE IN THE FRONT 4) THE MIDDLE BACK YARD THE DRAINAGE IS FLPWING TO THE HOUSE 5) YOU NEED TO HAVE POSITIVE FALL FROM BACK TO FRONT EVERY 20' YOU NEED TO HAVE A MINIMUM OF 0.10 OF FALL 6) THE LEFT CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE DIAGRAM 7) THE RIGHT CULVERT PIPE IS PITCHED THE WRONG WAY NEEDS TO FLOW TO THE LEFT
ROW- PRE-APRON (PRE-POUR) 10/18/2022 APPROVED - AS NOTED PFLANAGAN
Note: TALK TO CM HE HAS STATED HE WAS GOING TO PUT REBAR WHEN POURING SO PASSING AS NOTED IF ANYTHING HAPPENS WITH THE MITER ENDS HE IS TO FIX. IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE -------------------------------------------------------------------------------------------------- 10/17/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE #4 REBAR ON SITE AT THE TIME OF THE INSPECTION ------------------------------------------------------------------------------------------- 10/14/2022 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN POURING THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) SOIL AROUND CULVERT PIPE NEEDS MORE COMPACTION 3) TO MUCH ORGANICS IN POURING AREA --------------------------------------------------------------------------------------------------- 9/22/2022 - PREVIOUS INSPECTION NOTES THE POURING AREA AND APRON IF FULL WATER CAN NOT POUR WITH ALL THE WATER IN THE POURING AREA NEED TO PUMP ALL WATER OUT BEFORE THIS INSPECTION ---------------------------------------------------------------------------------------------------------------------------- 09/08/22= DRIVEWAY IS NOT FORM ACCORDING WITH THE SITE PLAN . SITE PLAN IS 16 FEET WIDE, YOU FORM THE DRIVEWAY 10 FEET WIDE ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8/30/22 1) STILL NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) THE RIGHT CULVERT PIPE IS STILL NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE --------------------------------------------------------------------------------------------------------------------------- 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 10/17/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE #4 REBAR ON SITE AT THE TIME OF THE INSPECTION ------------------------------------------------------------------------------------------- 10/14/2022 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN POURING THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) SOIL AROUND CULVERT PIPE NEEDS MORE COMPACTION 3) TO MUCH ORGANICS IN POURING AREA --------------------------------------------------------------------------------------------------- 9/22/2022 - PREVIOUS INSPECTION NOTES THE POURING AREA AND APRON IF FULL WATER CAN NOT POUR WITH ALL THE WATER IN THE POURING AREA NEED TO PUMP ALL WATER OUT BEFORE THIS INSPECTION ---------------------------------------------------------------------------------------------------------------------------- 09/08/22= DRIVEWAY IS NOT FORM ACCORDING WITH THE SITE PLAN . SITE PLAN IS 16 FEET WIDE, YOU FORM THE DRIVEWAY 10 FEET WIDE ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8/30/22 1) STILL NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) THE RIGHT CULVERT PIPE IS STILL NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE --------------------------------------------------------------------------------------------------------------------------- 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 10/14/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THERE ARE AREAS IN POURING THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) SOIL AROUND CULVERT PIPE NEEDS MORE COMPACTION 3) TO MUCH ORGANICS IN POURING AREA --------------------------------------------------------------------------------------------------- 9/22/2022 - PREVIOUS INSPECTION NOTES THE POURING AREA AND APRON IF FULL WATER CAN NOT POUR WITH ALL THE WATER IN THE POURING AREA NEED TO PUMP ALL WATER OUT BEFORE THIS INSPECTION ---------------------------------------------------------------------------------------------------------------------------- 09/08/22= DRIVEWAY IS NOT FORM ACCORDING WITH THE SITE PLAN . SITE PLAN IS 16 FEET WIDE, YOU FORM THE DRIVEWAY 10 FEET WIDE ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8/30/22 1) STILL NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) THE RIGHT CULVERT PIPE IS STILL NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE --------------------------------------------------------------------------------------------------------------------------- 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 09/22/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE POURING AREA AND APRON IF FULL WATER CAN NOT POUR WITH ALL THE WATER IN THE POURING AREA NEED TO PUMP ALL WATER OUT BEFORE THIS INSPECTION ---------------------------------------------------------------------------------------------------------------------------- 09/08/22= DRIVEWAY IS NOT FORM ACCORDING WITH THE SITE PLAN . SITE PLAN IS 16 FEET WIDE, YOU FORM THE DRIVEWAY 10 FEET WIDE ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8/30/22 1) STILL NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) THE RIGHT CULVERT PIPE IS STILL NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE --------------------------------------------------------------------------------------------------------------------------- 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ELECTRIC - EARLY POWER 09/14/2022 APPROVED BTAYLOR
Note: THIS IS A REINSPECTION 9-12-22 1. Need covers on generator wiring. 2. Need boxes and safe off wires under sink. 3. Attic light needs to be safed off.
ELECTRIC - EARLY POWER 09/12/2022 Disapproved - NO FEE BTAYLOR
Note: 9-12-22 1. Need covers on generator wiring. 2. Need boxes and safe off wires under sink. 3. Attic light needs to be safed off.
ROW- PRE-APRON (PRE-POUR) 09/08/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 09/08/22= DRIVEWAY IS NOT FORM ACCORDING WITH THE SITE PLAN . SITE PLAN IS 16 FEET WIDE, YOU FORM THE DRIVEWAY 10 FEET WIDE ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8/30/22 1) STILL NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) THE RIGHT CULVERT PIPE IS STILL NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE --------------------------------------------------------------------------------------------------------------------------- 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 08/30/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 8/30/22 1) STILL NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) THE RIGHT CULVERT PIPE IS STILL NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE --------------------------------------------------------------------------------------------------------------------------- 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 08/25/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 8/25/22 1) NEED TO DIG OUT POURING AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT PIPE IS NOW NOT THE MINIMUM DISTANCE FROM THE FORMS AT MITER END DO TO YOU PUTTING PIPE A THE RIGHT DISTANCE FROM ROAD EDGE ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 08/23/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 8/23/22 1) NEED TO DIG OUT POUR AREA AT THE TIME OF THE INSPECTION THERE ARE AREAS THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE 2) RIGHT CULVERT IS TO FAR FROM EDGE OF PAVEMENT 3) TOO MUCH ORGANICS IN POURING AREA NEED TO REMOVE ALL ------------------------------------------------------------------------------------------------------------------------------- 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 08/17/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 8/17/22 1) NEED TO HAVE #4 REBAR ON SITE AT TIME OF INSPECTION 2) NEED TO DIG OUT POURING AREA IT WILL NOT GIVE YOU THE MINIMUM 3) NEED TO DIG OUT FOOTERS AT MITER ENDS 4) NEED TO GET ALL ASPHALT AND WOOD OUT OF POURING AREA BEFORE THIS INSPECTION 5) CULVERT PIPES NEED TO BE 8' OFF EDGE OF PAVEMENT 6) DIRT HAVE WASHED OUT AROUND PIPE AND UNDER PIPE NEED TO FILL IN AROUND PIPE WITH DIRT ----------------------------------------------------------------------------------------------------------------------------- (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 08/05/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THINGS WERONG (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM. 8/5/22 - BM not where indicated by both the Site Plan and Swale Plan. Painted a question mark on the road near where a DIR (Disc in Road) is supposed to be.
ROW- PRE-APRON (PRE-POUR) 07/18/2022 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION THINGS WERONG (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED 7/18/22 - No clear BM on site as indicated by the Swale Plan. Re-establish and clearly identify a correct on site BM.
ROW- PRE-APRON (PRE-POUR) 07/13/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THINGS WERONG (1) NEED TO HAVE #4 REBAR PRESENT AT TIME OF INSPECTION (2) CULVERT PIPE IS NOT THE MINIMUM DISTANCE FROM EGDE OF PAVEMENT (3) THE RIGHT CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE DIAGRAM THAT WAS PROPOSED
GRAVITY SEWER TEST 07/11/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION NOT READY STILL WORKING
U - SEWER TIE IN 07/11/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION NOT READY STILL WORKING
U - SEWER TIE IN 07/08/2022 Disapproved - NO FEE MGIBSON
Note: NOT READY STILL WORKING
GRAVITY SEWER TEST 07/08/2022 Disapproved - NO FEE MGIBSON
Note: NOT READY STILL WORKING
PEP TANK INSTALLATION REQUEST 06/24/2022 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 06/01/2022 APPROVED RMARTIN
ALL ROUGH 05/25/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Electrical boxes in hallway left unit not secure No pressure on water supply Please clean up jobsite
INSULATION 05/25/2022 APPROVED TSTAUFFACHER
Note: Done with re-inspection of all rough
ALL ROUGH 05/11/2022 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Electrical boxes in hallway left unit not secure No pressure on water supply Please clean up jobsite
FIREWALL DRYWALL NAILING 03/22/2022 APPROVED TSTAUFFACHER
ALL ROUGH 03/22/2022 CANCELLED BY APPLICANT WEB
ALL ROUGH 03/22/2022 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2022 APPROVED RMARTIN
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheathing approved 02/24/2022 02/25/2022: No plans in box or on site 03/02/2022: Per detail on page 9S1 detail 37-missing straps on rafter ends and on base plate to trusses below. Left side unit-Girder truss T09 missing nails in straps
ROOF VALLEY & METAL 03/04/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION House is not ready for this inspection//02/24/2022 Roof sheathing inspected at this time/pass
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/03/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheathing approved 02/24/2022 02/25/2022: No plans in box or on site 03/02/2022: Per detail on page 9S1 detail 37-missing straps on rafter ends and on base plate to trusses below. Left side unit-Girder truss T09 missing nails in straps
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/02/2022 Disapproved - NO FEE TSTAUFFACHER
Note: THIS IS A REINSPECTION Roof sheathing approved 02/24/2022 02/25/2022: No plans in box or on site 03/02/2022: Per detail on page 9S1 detail 37-missing straps on rafter ends and on base plate to trusses below. Left side unit-Girder truss T09 missing nails in straps
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/25/2022 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Roof sheathing approved 02/24/2022 02/25/2022: No plans in box or on site
ROOF VALLEY & METAL 02/24/2022 Disapproved - NO FEE TSTAUFFACHER
Note: House is not ready for this inspection//02/24/2022 Roof sheathing inspected at this time/pass
FOUND SURVEY APPROVED (OFFICE) 01/27/2022 APPROVED TBAKER
TIE BEAM / LINTEL 12/13/2021 APPROVED DCUSHING
Note: THIS IS A REINSPECTION Cancelled--not ready
TIE BEAM / LINTEL 12/09/2021 CANCELLED BY APPLICANT TSTAUFFACHER
Note: Cancelled--not ready
TIE BEAM / LINTEL 09/07/2021 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 09/07/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Job has just started at 11.36
PLUMBING 1ST ROUGH UNDERGROUND 08/18/2021 APPROVED JGIBSON
MONOLITHIC SLAB 08/12/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Job has just started at 11.36
WATER METER INSTALLATION REQUEST 08/12/2021 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 7/9/2021 8:43:53 AM Lot not cleared visited site 7 different times last was done on 6/28
WATER METER INSTALLATION REQUEST 05/17/2021 Disapproved - NO FEE CSTONE
Note: Lot not cleared visited site 7 different times last was done on 6/28

Review History

Department Status Date In Date Out
BADMIN INFORMATION 11/07/2022 11/07/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The required file naming convention is to be followed for all documents uploaded. Please refer to website for the document submittal requirements (file naming).
ENGIN1 COMPLETE 11/07/2022 11/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 01/27/2022 01/27/2022
Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM In the future, please be sure to upload tot he correct document type - we have triggers in the system specifically for foundation and final surveys that are automatic when that doc type is chosen.
BADMIN COMPLETE 01/27/2022 01/27/2022
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/27/2022 01/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/27/2022 01/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 05/07/2021 05/07/2021
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM
SW1 COMPLETE 04/29/2021 04/29/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM correction were made
SW1 COMPLETE 04/22/2021 04/22/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
SW1 HOLD 03/30/2021 04/07/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D)
ZON COMPLETE 03/30/2021 03/31/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 03/19/2021 03/19/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D)
ZON COMPLETE 03/12/2021 03/12/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 03/03/2021 03/03/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM New site plan submitted but does not have the driveway width and material listed It must show width and material of driveways and walkways for review Driveways must be a minimum 16ft in width for a one car garage revised site plan does not appear to meet this.
ENGIN1 COMPLETE 03/03/2021 03/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
SW1 HOLD 03/03/2021 03/08/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D) Lot drainage features and patterns must be clearly depicted and include flow arrows.
ELEC COMPLETE 03/02/2021 03/02/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 03/02/2021 03/02/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Site plan/survey must show width of walkway Required Foundation plantings must be along the foundation of the home NOT the walkway
ELEC HOLD 03/01/2021 03/02/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Did not submit electric load.
ZON HOLD 03/01/2021 03/02/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Site plan must show width of walkway Required Foundation plantings must be along the foundation of the home not the walkway
ENGIN1 COMPLETE 02/19/2021 02/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON HOLD 02/19/2021 02/23/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM AC pad location on site plan and landscape plan do not match Residential homes shall have foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs along each side wrapping corners. Need one additional tree for this lot size
ELEC HOLD 02/19/2021 02/22/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs do not match the square footage of the house.
BLD COMPLETE 02/19/2021 02/26/2021
Note: Released By: JPI
SWALE COMPLETE 02/19/2021 05/06/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 02/09/2021 02/12/2021
Note: Held By: JPI 1. Rated separation between units, detail #4, page 5, does not match UL design selected. Please select a matching UL for design illustrated. 2. Provide roof ventilation calculations. 3. Provide mixed construction details. (wood to masonry connection) 4. Provide pony wall construction details. 5. Underlayment called out on page 9 to be 15lb felt. Per R905.1.1 30lb felt must be used. Also, the 7th edition does not allow 15# felt in this application.
CUSVC COMPLETE 02/09/2021 02/16/2021
Note: Released By: HHAND
ELEC HOLD 02/09/2021 02/10/2021
Note: Held By: JMUNSON Submit electrical load calcs and riser diagram
ENGIN1 HOLD 02/09/2021 02/10/2021
Note: Held By: TBAKER No benchmark on survey
LOCATE COMPLETE 02/09/2021 02/10/2021
Note: Released By: CSTONE
MECH COMPLETE 02/09/2021 02/10/2021
Note: Released By: CPISCITELLI
PLUM COMPLETE 02/09/2021 02/12/2021
Note: Released By: JPI
SW1 COMPLETE 02/09/2021 02/16/2021
Note: Released By: KRUTH
ZON HOLD 02/09/2021 02/10/2021
Note: Held By: AMOBLEY Please provide a landscape plan Survey/Site plan must show the width and material of front entry walkway and driveway Driveways for a one car garaqge must be a minimum of 16ft wide Please show the setback from the AC pads to property line on site plan/survey Survey must label the 5ft utility easement

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/25/2023
REINSPECTION RESIDENTIAL ¤40.00 01/25/2023
CONTRACTOR CHANGE ¤20.00 01/25/2023
SW ENG REINSPECTION 20 ¤20.00 01/25/2023
SW ENG REINSPECTION 20 ¤20.00 01/25/2023
SW ENG REINSPECTION 20 ¤20.00 01/25/2023
SW ENG REINSPECTION 20 ¤20.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
SW ENG REINSPECTION 30 ¤30.00 01/25/2023
REINSPECTION FEE ¤40.00 01/25/2023
CONTRACTOR CHANGE ¤40.00 01/27/2022
REINSPECTION RESIDENTIAL ¤40.00 11/02/2021
CONTRACTOR CHANGE ¤40.00 11/02/2021
CONTRACTOR CHANGE ¤40.00 11/02/2021
CONTRACTOR CHANGE ¤40.00 11/02/2021
BUILDING DISCOUNT 100% (¤1,539.80) 05/14/2021
ELECTRIC FEE ¤251.40 05/14/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 05/14/2021
IMPACT FEE FIRE ¤734.00 05/14/2021
IMPACT FEE PARKS ¤2,398.24 05/14/2021
IMPACT FEE SCHOOL ¤7,200.00 05/14/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 05/14/2021
MECHANICAL FEE ¤251.40 05/14/2021
WATER -IRRIGATION INSPECTION ¤50.00 05/14/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 05/14/2021
PLAN CHECK FEE ¤127.60 05/14/2021
PLUMBING FEE ¤251.40 05/14/2021
CONNECTION FEES ¤2,035.66 05/14/2021
METER - DEPOSIT ¤120.00 05/14/2021
WATER- TURN ON ¤50.00 05/14/2021
ADMIN FEE ¤20.00 05/14/2021
STORM WATER PERMIT FEES ¤80.00 05/14/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 05/14/2021
SEWER CREDIT (¤2,016.00) 05/14/2021
SEWER INSPECTION ¤25.00 05/14/2021
SEWER CAPITAL FACILITY ¤9,329.10 05/14/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 05/14/2021
NEW RESIDENTIAL INSPECTIONS ¤638.00 05/14/2021
SITE PLAN 20 ¤20.00 05/14/2021
SURCHARGE FS 533.721 ¤2.00 05/14/2021
SURCHARGE - FS 468.631 ¤2.00 05/14/2021
Fees Total Due: ¤0.00 Total Paid: ¤30,090.95