I want to search for...
Permit #2021020529
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00130-0110 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00130 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 631-929-5500 |
| Location Address: 114 FORSYTHE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/05/2021 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: SEASMOKE PROPERTIES FLORIDA LLC |
|
Address 256 ROUTE 25A WADING RIVER, NY 11792 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤154,890.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JUSTIN JACKSON
| Status | Location Address | Phone |
| INACTIVE |
51 LLWELLYN TRAIL PALM COAST , FL 32164 |
386-338-1000 |
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/27/2021 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION 7-22-21... revision needed number still not matching 7-27-21... notes above resolved | |||
| BLD - BUILDING FINAL | 07/22/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION 7-22-21... revision needed number still not matching | |||
| BLD - BUILDING FINAL | 07/19/2021 | Disapproved - NO FEE | WMILLER |
| Note: MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION | |||
| U -UTILITY RESIDENTIAL FINAL | 07/16/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 07/15/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/15/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION WE NEED A TOPOGRAPHIC SURVEYS, NO BOUNDARY SURVEY Full Final Survey needed with many more elevations to indicate proper drainage. Not a foundation survey as submitted corrections made | |||
| ROW - STORMWATER FINAL | 07/15/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 07/15/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION WE NEED A TOPOGRAPHIC SURVEYS, NO BOUNDARY SURVEY Full Final Survey needed with many more elevations to indicate proper drainage. Not a foundation survey as submitted corrections made | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/14/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: WE NEED A TOPOGRAPHIC SURVEYS, NO BOUNDARY SURVEY Full Final Survey needed with many more elevations to indicate proper drainage. Not a foundation survey as submitted | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/14/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: WE NEED A TOPOGRAPHIC SURVEYS, NO BOUNDARY SURVEY Full Final Survey needed with many more elevations to indicate proper drainage. Not a foundation survey as submitted | |||
| U-CROSS CONNECTION | 07/07/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ELECTRIC - EARLY POWER | 06/28/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:50 | |||
| GRAVITY SEWER TEST | 06/22/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 06/22/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/07/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION pipe is 1and1/2 tenths out of tolerance high on the right side needs to be redone corrections made pipe is good It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/01/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: pipe is 1and1/2 tenths out of tolerance high on the right side needs to be redone | |||
| INSULATION | 05/10/2021 | APPROVED | BGREVE |
| LATH/BRICK/ WATER BARRIER | 05/10/2021 | APPROVED | BGREVE |
| ALL ROUGH | 05/06/2021 | APPROVED - AS NOTED | BGREVE |
| Note: wall between living area and two bedrooms and hallway will require firestopping at truss elevation on hall and bedroom side of wal. ceinging height is different on each side of the wall. firestop is required at ceiling height. this will need to be completed by insulation inspection | |||
| ELECTRIC-TUG | 04/22/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:50 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/20/2021 | APPROVED | BGREVE |
| ROOF VALLEY & METAL | 04/20/2021 | APPROVED | BGREVE |
| FOUND SURVEY APPROVED (OFFICE) | 04/19/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/12/2021 | APPROVED | BGREVE |
| MONOLITHIC SLAB | 04/05/2021 | APPROVED | BGREVE |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/01/2021 | APPROVED | JGIBSON |
| WILDLIFE CHECK - ENVIRONMENTAL | 03/30/2021 | APPROVED | JMYERS |
| WATER METER INSTALLATION REQUEST | 03/08/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/20/2021 | 07/20/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/16/2021 | 04/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/16/2021 | 04/16/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/12/2021 | 04/12/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 04/12/2021 | 04/13/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM FFE on Foundation Plan is 8' higher than approved site plan and 10' +/- higher than CL of road elevations | |||
| ELEC | COMPLETE | 03/04/2021 | 03/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/03/2021 | 03/03/2021 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 03/03/2021 | 03/04/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/03/2021 | 03/03/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/03/2021 | 03/03/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reference the 2017 NEC on the cover page | |||
| PLENV | COMPLETE | 03/03/2021 | 03/04/2021 |
| Note: Released By: JORDAN MYERS - (386)986-2320 - JMEYERS@PALMCOASTGOV.COM The Gopher Tortoise letter from Tri-County Bobcat has been accepted. | |||
| SWALE | COMPLETE | 02/10/2021 | 05/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 02/10/2021 | 02/11/2021 |
| Note: Held By: JMYERS Staff conducted a site visit on 2/11/2021 and noted a Potentially Occupied Gopher Tortoise burrow. Please provide a Gopher Tortoise survey by a QEP. If burrows exist within 25ft of construction activities they will have to be relocated and an approved After Action Report submitted. | |||
| BLD | HOLD | 02/09/2021 | 02/15/2021 |
| Note: Held By: JPI 1. PA spec sheet indicates threaded rod as a wood connector. This is a block structure. Please explain. | |||
| CUSVC | COMPLETE | 02/09/2021 | 02/12/2021 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 02/09/2021 | 02/10/2021 |
| Note: Held By: JMUNSON Need to reference the 2017 NEC | |||
| ENGIN1 | COMPLETE | 02/09/2021 | 02/10/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/09/2021 | 02/10/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 02/09/2021 | 02/10/2021 |
| Note: Held By: CPISCITELLI Energy calcs and EPL card need to be signed by the builder | |||
| PLUM | COMPLETE | 02/09/2021 | 02/15/2021 |
| Note: Released By: JPI 1. Advisory Note. To alleviate confusion, please remove riser diagram from electrical plan, plumber has supplied actual riser diagram. | |||
| SW1 | COMPLETE | 02/09/2021 | 02/16/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 02/09/2021 | 02/11/2021 |
| Note: Held By: AMOBLEY Landscape plan house layout does not match site plan and plans |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/27/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 07/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/05/2021 |
| SEWER CREDIT | (¤850.00) | 03/05/2021 |
| SEWER INSPECTION | ¤25.00 | 03/05/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/05/2021 |
| WATER CREDIT | (¤60.00) | 03/05/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/05/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤442.00 | 03/05/2021 |
| SITE PLAN 20 | ¤20.00 | 03/05/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/05/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/05/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/05/2021 |
| METER - DEPOSIT | ¤60.00 | 03/05/2021 |
| WATER- TURN ON | ¤25.00 | 03/05/2021 |
| ADMIN FEE | ¤20.00 | 03/05/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/05/2021 |
| BUILDING DISCOUNT 100% | (¤1,128.20) | 03/05/2021 |
| ELECTRIC FEE | ¤192.60 | 03/05/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/05/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/05/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/05/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/05/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/05/2021 |
| MECHANICAL FEE | ¤192.60 | 03/05/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/05/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/05/2021 |
| PLAN CHECK FEE | ¤88.40 | 03/05/2021 |
| PLUMBING FEE | ¤192.60 | 03/05/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,301.43 |