Permit #2021020683

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00520-0210
CONDITIONED SPACE: 1478 sqft
CONDITIONED SPACE: 1478 sqft
GARAGE: 444 sqft
GARAGE: 444 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
OPENED PORCH (WITH ROOF) : 65 sqft
OPENED PORCH (WITH ROOF) : 65 sqft
Total Square Footage: 4114 sqft
Block: 00520
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 386-237-5837
Location Address: 56 PROVIDENCE LN
Type: DU - DUPLEX
Issue Date: 03/31/2021
NOC: RECORDED
Applicant name: MARSEL GILMANSHIN
Owner: GILMANS DEVELPOMENT CORP

Address

STE 4

PALM COAST, FL 32137

Address

4873 PALM COAST PKWY, NW

PALM COAST, FL 32137

Lot: 0210
Contracted Stated Job Value: ¤280,000.00
Job Description: DUPLEX
Type: CN

Contractor

GILMANS DEVELOPMENT CORP
Status Location Address State License Number Phone
ACTIVE

4873 PALM COAST PARKWAY NW #4

PALM COAST, FL 32137

CBC1263180 (Exp: 08/31/2026) 386-237-5837

Sub Contractors

MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 12/05/2022 APPROVED GBERTOLA
Note: 12/05/22=CORRECTION WERE MADE 12/2/2022 - PREVIOUS INSPECTION NOTES THERE IS TRASH IN THE VACANT LOT NEXT TO YOUR LOT NEED TO REMOVE BEFORE PASSING -------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION Final Survey needs to be approved before this Inspection. Form boards and pile of trash in the vacant will need removed before this inspection can be approved.
ROW - FINAL INSPECTION 12/02/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE IS TRASH IN THE VACANT LOT NEXT TO YOUR LOT NEED TO REMOVE BEFORE PASSING -------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION Final Survey needs to be approved before this Inspection. Form boards and pile of trash in the vacant will need removed before this inspection can be approved.
BLD - BUILDING FINAL 12/01/2022 FINAL APPROVED KSANDOE
Note: 12/1/22 Units cannot be staged for move in by residents until CO is issued. 11/30/2022 - PREVIOUS INSPECTION NOTES 11/30/22 Unit B locked. Need access for inspection Unit A Gararage door bucking anchor have been removed to allow door track mounting. 11/29/2022 - PREVIOUS INSPECTION NOTES 11/29/22 Complete set of updated energy calcs need to be on site for inspection. Key provided for unit A does not work for unit B. Stopped inspection 10/20/2022 - PREVIOUS INSPECTION NOTES 10/19/2022 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 No house numbers. 10/20/22 Job box needs attention. Energy calcs do not match installed equipment. Breaker lock required in panel on dishwasher breaker. Stopped inspection.
BLD - BUILDING FINAL 11/30/2022 Disapproved -FEE REQUIRED KSANDOE
Note: 11/30/22 Unit B locked. Need access for inspection Unit A Gararage door bucking anchor have been removed to allow door track mounting. 11/29/2022 - PREVIOUS INSPECTION NOTES 11/29/22 Complete set of updated energy calcs need to be on site for inspection. Key provided for unit A does not work for unit B. Stopped inspection 10/20/2022 - PREVIOUS INSPECTION NOTES 10/19/2022 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 No house numbers. 10/20/22 Job box needs attention. Energy calcs do not match installed equipment. Breaker lock required in panel on dishwasher breaker. Stopped inspection.
U-CROSS CONNECTION 11/29/2022 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
BLD - BUILDING FINAL 11/29/2022 Disapproved -FEE REQUIRED KSANDOE
Note: 11/29/22 Complete set of updated energy calcs need to be on site for inspection. Key provided for unit A does not work for unit B. Stopped inspection 10/20/2022 - PREVIOUS INSPECTION NOTES 10/19/2022 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 No house numbers. 10/20/22 Job box needs attention. Energy calcs do not match installed equipment. Breaker lock required in panel on dishwasher breaker. Stopped inspection.
BLD - BUILDING FINAL 10/20/2022 Disapproved -FEE REQUIRED KSANDOE
Note: 10/19/2022 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 No house numbers. 10/20/22 Job box needs attention. Energy calcs do not match installed equipment. Breaker lock required in panel on dishwasher breaker. Stopped inspection.
BLD - BUILDING FINAL 10/19/2022 Disapproved -FEE REQUIRED KSANDOE
Note: House is locked. Need access for inspection FRC110.1 No house numbers.
U -UTILITY RESIDENTIAL FINAL 10/19/2022 APPROVED - AS NOTED LFITZGERALD
Note: place sod around area around sewer clean out cap-send pic to inspector at 386-214-3376
ROW - FINAL APRON (AFTER POUR) 09/09/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/09/2022 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 09/09/2022 APPROVED GBERTOLA
ROW - FINAL INSPECTION 08/23/2022 Disapproved -FEE REQUIRED RGROSS
Note: Final Survey needs to be approved before this Inspection. Form boards and pile of trash in the vacant will need removed before this inspection can be approved.
ROW- PRE-APRON (PRE-POUR) 07/26/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 07/20/22=LEFT DRIVEWAY IS SLOPED IN THE WRONG DIRECTION AND THE RIGHT SIDE MITER END IS OUT OF TOLERANCE. CULVERT TILTED IN THE WRONG DIRECTION, WATER FLOW TFROM THE LEFT TO THE RIGHT . The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. SECTION 300.01 ROADSIDE SWALE AND CULVERT #3 THE DRIVEWAY ON THE RIGHT SIDE CULVERT GOOD 07/19/22=is not a permit box outside, NO NUMBER IN THE HOUSE TO IDENTIFY THE HOUSE Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative Pipe end footers all washed out. Culvert tilted more than a tenth. 7/25/22 - DUPLEX - left culvert picked in the wrong direction. Looks like it washed out and raised the culvert on the right end.
ROW- PRE-APRON (PRE-POUR) 07/25/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION 07/20/22=LEFT DRIVEWAY IS SLOPED IN THE WRONG DIRECTION AND THE RIGHT SIDE MITER END IS OUT OF TOLERANCE. CULVERT TILTED IN THE WRONG DIRECTION, WATER FLOW TFROM THE LEFT TO THE RIGHT . The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. SECTION 300.01 ROADSIDE SWALE AND CULVERT #3 THE DRIVEWAY ON THE RIGHT SIDE CULVERT GOOD 07/19/22=is not a permit box outside, NO NUMBER IN THE HOUSE TO IDENTIFY THE HOUSE Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative Pipe end footers all washed out. Culvert tilted more than a tenth. 7/25/22 - DUPLEX - left culvert picked in the wrong direction. Looks like it washed out and raised the culvert on the right end.
ROW- PRE-APRON (PRE-POUR) 07/20/2022 Disapproved - NO FEE GBERTOLA
Note: 07/20/22=LEFT DRIVEWAY IS SLOPED IN THE WRONG DIRECTION AND THE RIGHT SIDE MITER END IS OUT OF TOLERANCE. CULVERT TILTED IN THE WRONG DIRECTION, WATER FLOW TFROM THE LEFT TO THE RIGHT . The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. SECTION 300.01 ROADSIDE SWALE AND CULVERT #3 THE DRIVEWAY ON THE RIGHT SIDE CULVERT IS GOOD . .......................................................................................................................................................................................................................................... 07/19/22=is not a permit box outside, NO NUMBER IN THE HOUSE TO IDENTIFY THE HOUSE Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative Pipe end footers all washed out. Culvert tilted more than a tenth.
ROW- PRE-APRON (PRE-POUR) 07/19/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 07/19/22=is not a permit box outside, NO NUMBER IN THE HOUSE TO IDENTIFY THE HOUSE Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative Pipe end footers all washed out. Culvert tilted more than a tenth.
ROW- PRE-APRON (PRE-POUR) 07/18/2022 Disapproved - NO FEE RGROSS
Note: Pipe end footers all washed out. Culvert tilted more than a tenth.
ELECTRIC - EARLY POWER 06/21/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION House needs to be unlocked for inspection 6/21/22 Emailed FPL at 9:01am
ELECTRIC - EARLY POWER 06/13/2022 Disapproved -FEE REQUIRED KSANDOE
Note: House needs to be unlocked for inspection
GRAVITY SEWER TEST 05/02/2022 APPROVED MGIBSON
U - SEWER TIE IN 05/02/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 04/06/2022 APPROVED KSANDOE
FIREWALL FINAL 04/06/2022 APPROVED KSANDOE
INSULATION 03/29/2022 APPROVED KSANDOE
FIREWALL DRYWALL NAILING 03/29/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION Need to be able to see attachment hardware used. Cannot be covered prior to inspection
FIREWALL DRYWALL NAILING 03/25/2022 Disapproved - NO FEE KSANDOE
Note: Need to be able to see attachment hardware used. Cannot be covered prior to inspection
ALL ROUGH 03/24/2022 APPROVED - AS NOTED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Electric supply for DW must occupy adjacent cabinet. Cannot be directly behind. Water pressure test failed. Clean up job site. Need dumpster on site. 3/15/22 Water pressure test failed Clean up job site, debris, trash Dumpster required on site. 3/24/22 - Still need dumpster on site
ALL ROUGH 03/15/2022 Disapproved -FEE REQUIRED KSANDOE
Note: THIS IS A REINSPECTION Electric supply for DW must occupy adjacent cabinet. Cannot be directly behind. Water pressure test failed. Clean up job site. Need dumpster on site. 3/15/22 Water pressure test failed Clean up job site, debris, trash Dumpster required on site.
ALL ROUGH 03/03/2022 Disapproved - NO FEE KSANDOE
Note: Electric supply for DW must occupy adjacent cabinet. Cannot be directly behind. Water pressure test failed. Clean up job site. Need dumpster on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/22/2021 APPROVED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Need tgo have approved building plans on site for inspector use. Truss 01 and 02 missing engineering. Truss 03-09, 14, 15 engineering not nailed per plan. 12/15/21 - Above truss engineering issues have not been corrected. Highlighted in engineering packet for reference.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/15/2021 Disapproved -FEE REQUIRED KSANDOE
Note: THIS IS A REINSPECTION Need tgo have approved building plans on site for inspector use. Truss 01 and 02 missing engineering. Truss 03-09, 14, 15 engineering not nailed per plan. 12/15/21 - Above truss engineering issues have not been corrected. Highlighted in engineering packet for reference.
ROOF VALLEY & METAL 12/13/2021 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/13/2021 Disapproved - NO FEE KSANDOE
Note: Need tgo have approved building plans on site for inspector use. Truss 01 and 02 missing engineering. Truss 03 - 20 engineering not nailed per plan.
FOUND SURVEY APPROVED (OFFICE) 12/06/2021 APPROVED AMOBLEY
TIE BEAM / LINTEL 10/27/2021 APPROVED KSANDOE
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 10/25/2021 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 10/25/2021 CANCELLED BY APPLICANT KSANDOE
MONOLITHIC SLAB 07/06/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 06/23/2021 APPROVED - AS NOTED JGIBSON
Note: THIS INSPECTION WAS DONE ON 6/22/21. ALSO NEED PORTABLE RESTROOM BEFORE MONOLITHIC SLAB INSPECTION
WATER METER INSTALLATION REQUEST 06/23/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 10/31/2022 10/31/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/20/2022 07/20/2022
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Foundation Survey is wrong address
ENGIN1 COMPLETE 12/06/2021 12/06/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/06/2021 12/06/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN HOLD 07/19/2021 07/19/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF
BADMIN COMPLETE 07/19/2021 07/19/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ZON COMPLETE 03/22/2021 03/29/2021
Note: Released By: ESTELLE LENS - (386)986-2655 -
ELEC COMPLETE 03/15/2021 03/16/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 03/15/2021 03/17/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - The A/C pad is required to be screened with 7 gallon shrubs. Please include more than one 7 gallon shrub to screen the A/C pads. Foundation shrubs are required to be a minimum of 3 gallons. 16 foundation plantings are required: 8 across the front and 4 on each side.
SW1 COMPLETE 03/15/2021 03/19/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
MECH COMPLETE 03/03/2021 03/03/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 03/03/2021 03/03/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to reference the 2017 NEC not the 2014. On the electrical page in the notes on the right hand side.
ZON HOLD 03/03/2021 03/04/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Repeat comments: Please upload the landscape plan so Zoning can complete the review. The survey and site plan have blanks. Please have surveyor complete the survey/site plan with all missing information including the legal description, flood zone and FEMA map panel number. Additional comments may follow once all required information is submitted for review.
BLD COMPLETE 03/03/2021 03/08/2021
Note: Released By: JPI
PLUM COMPLETE 03/03/2021 03/08/2021
Note: Released By: JPI
SW1 HOLD 03/03/2021 03/08/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM You will need to review the stormwater checklist and correct all the highlighted unchecked boxes and resubmitt a revised site plan
SWALE COMPLETE 02/16/2021 05/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 02/12/2021 02/18/2021
Note: Held By: JPI 1. Product approval spec sheet is incomplete. Florida Door is noted as supplier of all doors and windows and the products are from multiple suppliers. Note proper manufacturer for all products. Also, no PA # listed for sectional/garage door, mullions, or HZ windows. 2. Product Approval spec sheet items that have not been approved for 2020 code cycle: 11472 truss anchor, and 199 truss plate. 3. It appears fire rated separation does not extend into lanai area as central truss stops at rear wall. Separation wall required to extend thru lanai. Please correct. 4. Clarify construction of rated separation at front entry as central truss stops at front wall. Separation required thru entry. 5. Provide wood beam to block wall connection at front entry as illustrated on truss drawing.
CUSVC COMPLETE 02/12/2021 02/19/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 02/12/2021 02/17/2021
Note: Held By: JMUNSON 1. Need to reference the 2017 NEC not the 2014 2. Need outlet near A/C on left unit. 210.63 3. Show wire sizes on riser diagram
ENGIN1 COMPLETE 02/12/2021 02/16/2021
Note: Released By: TBAKER
LOCATE COMPLETE 02/12/2021 02/16/2021
Note: Released By: CSTONE
MECH HOLD 02/12/2021 02/16/2021
Note: Held By: CPISCITELLI Energy calcs and EPL card need to be signed by the builder
PLUM HOLD 02/12/2021 02/18/2021
Note: Held By: JPI 1. DWV isometric indicates a shower in Bath 1. Floor plans illustrate tub. Clarify.
SW1 HOLD 02/12/2021 02/19/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM please review the checklist that has been attached and correct all of the highlighted bullet points
ZON HOLD 02/12/2021 02/17/2021
Note: Held By: ELENS Please upload the landscape plan so Zoning can complete the review. The survey and site plan have blanks. Please have surveyor complete the survey with all missing information including the legal description, flood zone and FEMA map panel number. The color sheet is missing the LRV of the exterior color. Please include the LRV and provide the exterior material of the residence where requested. (ie. Stucco or Siding...not "paint". Additional comments may follow once all required information is submitted for review.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
REINSPECTION RESIDENTIAL ¤40.00 12/05/2022
CONTRACTOR CHANGE ¤40.00 12/05/2022
SW ENG REINSPECTION 20 ¤20.00 12/05/2022
SW ENG REINSPECTION 20 ¤20.00 12/05/2022
SW ENG REINSPECTION 30 ¤30.00 12/05/2022
SW ENG REINSPECTION 30 ¤30.00 12/05/2022
STORM WATER PERMIT FEES ¤80.00 03/31/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 03/31/2021
SEWER CREDIT (¤2,016.00) 03/31/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 03/31/2021
PLAN CHECK FEE ¤150.00 03/31/2021
PLUMBING FEE ¤285.00 03/31/2021
NEW RESIDENTIAL INSPECTIONS ¤750.00 03/31/2021
SITE PLAN 20 ¤20.00 03/31/2021
SURCHARGE FS 533.721 ¤2.00 03/31/2021
SURCHARGE - FS 468.631 ¤2.00 03/31/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 03/31/2021
MECHANICAL FEE ¤285.00 03/31/2021
SEWER CAPITAL FACILITY ¤9,329.10 03/31/2021
ELECTRIC FEE ¤285.00 03/31/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 03/31/2021
IMPACT FEE FIRE ¤734.00 03/31/2021
IMPACT FEE PARKS ¤2,398.24 03/31/2021
CONNECTION FEES ¤2,035.66 03/31/2021
ADMIN FEE ¤20.00 03/31/2021
IMPACT FEE SCHOOL ¤7,200.00 03/29/2021
BUILDING DISCOUNT 100% (¤1,775.00) 03/29/2021
METER - DEPOSIT ¤120.00 03/03/2021
WATER- TURN ON ¤50.00 03/03/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 03/03/2021
WATER -IRRIGATION INSPECTION ¤50.00 03/03/2021
SEWER INSPECTION ¤25.00 03/03/2021
Fees Total Due: ¤0.00 Total Paid: ¤29,823.45