Permit #2021020829
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00660-0570 |
| CONDITIONED SPACE: 1875 sqft |
| GARAGE: 750 sqft |
| OPENED PORCH (WITH ROOF) : 252 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| Total Square Footage: 2944 sqft |
| Block: 00660 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 386-931-1725 |
| Location Address: 69 ROLLING SANDS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/26/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH ALEIXO PORTAL |
| Owner: PORTAL FELISBERTO A TRUSTEE |
|
Address 21 PRINCESS KIM LANE PALM COAST, FL 32164 |
| Lot: 0570 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SWEETWATER CUSTOM HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
CBC1252965 (Exp: 08/31/2024) | 386-931-1725 | 386-439-4676 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
KENNETH J STYS JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
824 CREEKWOOD DR ORMOND BEACH, FL 32174 |
ER13015561 (Exp: 08/31/2024) | 386-333-4716 |
JOSE E ORTIZ JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4601 E MOODY BLVD BUNNELL, FL 32110 |
SUITE B7 BUNNELL, FL 32110 |
RC29027619 (Exp: 08/31/2023) | 386-503-6922 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 06/15/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -has potable irrigation with PVB now installed-no cross connection please install a pressure vacume breaker instead of the atmospheric vacume breaker that is currently installed for your potable irrigation | |||
| BLD - BUILDING FINAL | 06/14/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION The A/C unit has been installed in the path of an emergeny escape and rescure. Paths are to remain open to a yard or court. R-310 | |||
| BLD - BUILDING FINAL | 06/13/2022 | Disapproved - NO FEE | JWALKER |
| Note: The A/C unit has been installed in the path of an emergeny escape and rescure. Paths are to remain open to a yard or court. R-310 | |||
| U-CROSS CONNECTION | 06/13/2022 | Disapproved - NO FEE | LFITZGERALD |
| Note: please install a pressure vacume breaker instead of the atmospheric vacume breaker that is currently installed for your potable irrigation | |||
| ROW - STORMWATER FINAL | 06/13/2022 | APPROVED - AS NOTED | EMADISON |
| Note: * EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/13/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 05/13/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/13/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 05/13/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 05/04/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:00 PM | |||
| ROW- PRE-APRON (PRE-POUR) | 12/09/2021 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| INSULATION | 11/08/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Seal the floor arears where plumbing drain lines come through the concrete, Kitchen and left bath. As noted in all rough. The framing at the electrical panel needs to be sealed with fire foam completely where wires run up to attic. Fill in missing foam areas on exterior walls. | |||
| INSULATION | 11/05/2021 | Disapproved - NO FEE | JWALKER |
| Note: Seal the floor arears where plumbing drain lines come through the concrete, Kitchen and left bath. As noted in all rough. The framing at the electrical panel needs to be sealed with fire foam completely where wires run up to attic. Fill in missing foam areas on exterior walls. | |||
| ALL ROUGH | 10/27/2021 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 10/14/21 1-The dryer duct needs to be sealed completely, and a 16 ga strap and 8 fasteners per side needs to be installed at 2-the top plate where the plate was notched out. 3-Nail plates must be installed at the bottom of all furring strips where the wire has been run for outlets through out the building. 4-The kitchen kneewall has not been framed. 5-=Rear exterior door is not fastened properly. Fasteners need to be throught the 1 1/4 thick part of the jamb. 6-The concrete areas where the plumbing comes through need to be seal. 7-Kitchen exhaust duct is needs to be completely sealed at all mechanical joints. The 2 HVAC supply flex ducts running next to the kitchen exhaust need to be re-routed to remove the kinks being caused by running to close to the kitchen exhaust and proper spacing needs occur where the supply ducts are up against the kitchen exhaust duct. 10/27/27 Concrete cut out for plumbing lines need to be sealed. | |||
| ALL ROUGH | 10/14/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION 10/14/21 1-The dryer duct needs to be sealed completely, and a 16 ga strap and 8 fasteners per side needs to be installed at 2-the top plate where the plate was notched out. 3-Nail plates must be installed at the bottom of all furring strips where the wire has been run for outlets through out the building. 4-The kitchen kneewall has not been framed. 5-=Rear exterior door is not fastened properly. Fasteners need to be throught the 1 1/4 thick part of the jamb. 6-The concrete areas where the plumbing comes through need to be seal. 7-Kitchen exhaust duct is needs to be completely sealed at all mechanical joints. The 2 HVAC supply flex ducts running next to the kitchen exhaust need to be re-routed to remove the kinks being caused by running to close to the kitchen exhaust and proper spacing needs occur where the supply ducts are up against the kitchen exhaust duct. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/12/2021 | APPROVED - AS NOTED | MGIBSON |
| Note: DONE 4/20/21 | |||
| GRAVITY SEWER TEST | 10/12/2021 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 10/12/2021 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 10/01/2021 | Disapproved - NO FEE | RMARTIN |
| Note: TUG STANDS FOR TEMPORARY UNDER GROUND, THE SERVICE IS OVERHEAD, CAN NOT GET A TUG ON OVERHEAD SERVICE. WILL NEED TO WAIT ON EARLY POWER | |||
| ALL ROUGH | 10/01/2021 | CANCELLED BY APPLICANT | JWALKER |
| LATH/BRICK/ WATER BARRIER | 09/03/2021 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 08/17/2021 | APPROVED - AS NOTED | JWALKER |
| Note: 8/3/21 Girder trusses AO1, BO3, DO5 do not have proper hold down anchors installed. Anchors to be used are noted on the engineering truss drawing. 8/17/21 The above listed items have not been corrected. Due to weather and possibilty of heavy rains and overall stopping of the job. Roof valley passes. The above items will need to be corrected for the all rough inspection. Contractor stated that the straps used at the hold down areas were proper anchors When asked to supply inspector with the drawings to review the areas listed, the contactor did not have the drawing and engineering packets on site. Please have approved drawings on site for inspections R-107 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/03/2021 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION Please provide full set of approved drawings including roof truss layout and truss engineering packet. Sheating passed inspection and is able to be covered. 8/3/21 Girder trusses AO1, BO3, DO5 do not have proper hold down anchors installed. Anchors to be used are noted on the engineering truss drawing. The MV trusses at garage need to be strapped to truss below. Check that proper anchors are installed at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/27/2021 | Disapproved - NO FEE | JWALKER |
| Note: Please provide full set of approved drawings including roof truss layout and truss engineering packet. Sheating passed inspection and is able to be covered. | |||
| TIE BEAM / LINTEL | 05/26/2021 | APPROVED | MMESSER |
| WATER METER INSTALLATION REQUEST | 05/25/2021 | APPROVED | CSTONE |
| FOUND SURVEY APPROVED (OFFICE) | 05/18/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/30/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/20/2021 | APPROVED | JGIBSON |
| WILDLIFE CHECK - ENVIRONMENTAL | 02/22/2021 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/08/2022 | 06/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2021 | 05/18/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/18/2021 | 05/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/17/2021 | 05/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/17/2021 | 05/17/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/15/2021 | 03/15/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/08/2021 | 03/09/2021 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 03/08/2021 | 03/09/2021 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - | |||
| ELEC | COMPLETE | 03/08/2021 | 03/08/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/23/2021 | 02/23/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM CHECK THE RESIDENTIAL SITE PLAN | |||
| MECH | COMPLETE | 02/18/2021 | 02/18/2021 |
| Note: Released By: BBEMBRY | |||
| ELEC | HOLD | 02/18/2021 | 02/18/2021 |
| Note: Held By: BBEMBRY disregard previous comment regarding digital signature - 1. Need to reference the 2017 NEC | |||
| PLENV | COMPLETE | 02/18/2021 | 02/22/2021 |
| Note: Released By: JMYERS Staff conducted a site visit on 2/22/2021 and found no Gopher Tortoise or their burrows on the property. | |||
| SWALE | COMPLETE | 02/17/2021 | 05/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2021 | 02/18/2021 |
| Note: Released By: ELENS | |||
| BLD | HOLD | 02/16/2021 | 02/23/2021 |
| Note: Held By: JPI 1. Provide Product Approval for mullions, and garage doors. | |||
| CUSVC | COMPLETE | 02/16/2021 | 02/23/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 02/16/2021 | 02/18/2021 |
| Note: Held By: JMUNSON 1. Need to reference the 2017 NEC 2. Need to be able to verify digital signature. FS 471.025 | |||
| ENGIN1 | COMPLETE | 02/16/2021 | 02/17/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/16/2021 | 02/18/2021 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 02/16/2021 | 02/18/2021 |
| Note: Held By: CPISCITELLI Need to be able to verify digital signature on plans. FS 471.025 | |||
| PLUM | COMPLETE | 02/16/2021 | 02/23/2021 |
| Note: Released By: JPI |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 06/15/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 06/15/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/15/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/15/2022 |
| CONNECTION FEES | ¤1,017.83 | 03/26/2021 |
| METER - DEPOSIT | ¤60.00 | 03/26/2021 |
| WATER- TURN ON | ¤25.00 | 03/26/2021 |
| ADMIN FEE | ¤20.00 | 03/26/2021 |
| BUILDING DISCOUNT 100% | (¤1,258.40) | 03/26/2021 |
| ELECTRIC FEE | ¤211.20 | 03/26/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/26/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/26/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/26/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/26/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/26/2021 |
| MECHANICAL FEE | ¤211.20 | 03/26/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/26/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/26/2021 |
| PLAN CHECK FEE | ¤100.80 | 03/26/2021 |
| PLUMBING FEE | ¤211.20 | 03/26/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤504.00 | 03/26/2021 |
| SITE PLAN 20 | ¤20.00 | 03/26/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/26/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/26/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/26/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/26/2021 |
| SEWER CREDIT | (¤1,147.00) | 03/26/2021 |
| SEWER INSPECTION | ¤25.00 | 03/26/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/26/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/26/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,136.93 |