Permit #2021020834
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00420-0110 |
| CONDITIONED SPACE: 2331 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3213 sqft |
| Block: 00420 |
| Subdivision: 2214 - SECTION 19-WYNNFIELD |
| Job Phone: (386) 672-8285 |
| Location Address: 4 WALKER DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/23/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: SAMUEL & LARYSA MOVSESYAN |
|
Address 4 WALKER DR PALM COAST, FL 32164 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤201,999.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 01/05/2022 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 01/05/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 01/05/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 01/05/2022 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 12/16/2021 | APPROVED | GBERTOLA |
| Note: 12/16/2021=CORRECTION WERE MADE Need to Match existing grade on the left swale and on the right swale, and on the right swale need to remove the lip at the end of the swale. swale on the left half of way to the minor end culvert need to be raised ON THE RIGHT SIDE NEED TO RAISED TO MATCH EXISTING GRADE I LEFT IT PAINTED WITH PINK SPRAY PAINT Need positive fall in the direction described in the swale plan. water move from the left to the right PICTURE ATTACHED I HAVE A MEETING WITH THE BUILDER ABOUT THE SWALE, NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| U -UTILITY RESIDENTIAL FINAL | 11/30/2021 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 11/30/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW - STORMWATER FINAL | 11/30/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 11/30/2021=I HAVE A MEETING WITH THE BUILDER ABOUT THE SWALE, NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE Need to Match existing grade on the left swale and on the right swale, and on the right swale need to remove the lip at the end of the swale. swale on the left half of way to the minor end culvert need to be raised ON THE RIGHT SIDE NEED TO RAISED TO MATCH EXISTING GRADE I LEFT IT PAINTED WITH PINK SPRAY PAINT Need positive fall in the direction described in the swale plan. water move from the left to the right PICTURE ATTACHED I HAVE A MEETING WITH THE BUILDER ABOUT THE SWALE, NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/29/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: Need to Match existing grade on the left swale and on the right swale, and on the right swale need to remove the lip at the end of the swale. swale on the left half of way to the minor end culvert need to be raised ON THE RIGHT SIDE NEED TO RAISED TO MATCH EXISTING GRADE I LEFT IT PAINTED WITH PINK SPRAY PAINT Need positive fall in the direction described in the swale plan. water move from the left to the right PICTURE ATTACHED | |||
| ROW - FINAL APRON (AFTER POUR) | 11/29/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/29/2021 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 10/27/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/26/2021 | APPROVED | TBAKER |
| U - SEWER TIE IN | 10/14/2021 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 09/03/2021 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 08/23/2021 | Approval - Private Provider | PPROVIDER |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION CONTACT PRIVATE PROVIDER FOR GRAVITY SEWER INSPECTION, U-SEWER NOT MADE YET | |||
| GRAVITY SEWER TEST | 08/20/2021 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION CONTACT PRIVATE PROVIDER FOR GRAVITY SEWER INSPECTION, U-SEWER NOT MADE YET | |||
| GRAVITY SEWER TEST | 08/19/2021 | Disapproved - NO FEE | JGIBSON |
| Note: CONTACT PRIVATE PROVIDER FOR GRAVITY SEWER INSPECTION, U-SEWER NOT MADE YET | |||
| INSULATION | 06/30/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 06/28/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 06/23/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 06/17/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/07/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 04/20/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 03/31/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/24/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 03/01/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/26/2021 | 10/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/26/2021 | 10/26/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/25/2021 | 03/04/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/17/2021 | 05/07/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/17/2021 | 02/17/2021 |
| Note: Released By: BBEMBRY | |||
| BLD | HOLD | 02/16/2021 | 02/17/2021 |
| Note: Held By: BBEMBRY Plans are not designed to the latest Florida Building Code. | |||
| CUSVC | COMPLETE | 02/16/2021 | 02/16/2021 |
| Note: Released By: HHAND | |||
| ENGIN1 | COMPLETE | 02/16/2021 | 02/17/2021 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/16/2021 | 02/18/2021 |
| Note: Released By: CSTONE | |||
| SW1 | COMPLETE | 02/16/2021 | 02/23/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2021 | 02/18/2021 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 01/05/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/05/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/05/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/23/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/23/2021 |
| SEWER CREDIT | (¤1,147.00) | 02/23/2021 |
| SEWER INSPECTION | ¤25.00 | 02/23/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 02/23/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 02/23/2021 |
| METER - DEPOSIT | ¤60.00 | 02/23/2021 |
| WATER- TURN ON | ¤25.00 | 02/23/2021 |
| ADMIN FEE | ¤20.00 | 02/23/2021 |
| CONNECTION FEES | ¤1,017.83 | 02/23/2021 |
| BUILDING DISCOUNT 100% | (¤20.00) | 02/23/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 02/23/2021 |
| IMPACT FEE FIRE | ¤367.00 | 02/23/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 02/23/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/23/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/23/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/23/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 02/23/2021 |
| SITE PLAN 20 | ¤20.00 | 02/23/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/23/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/23/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,044.43 |