I want to search for...

Permit #2021020997

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00060-0240
CONDITIONED SPACE: 1601 sqft
GARAGE: 391 sqft
OPENED PORCH (WITH ROOF) : 131 sqft
OPENED PORCH (WITH ROOF) : 42 sqft
Total Square Footage: 2165 sqft
Block: 00060
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 904-667-3599
Location Address: 20 PRINCESS LUISE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/26/2021
NOC: RECORDED
Applicant name: TONY S JACKSON
Owner: 3DRE LLC

Address

3544 ST JOHNS BLUFF RD S APT 1104

JACKSONVILLE, FL 32224

Lot: 0240
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

T-DAWG CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

6821 SOUTH POINT DR N

NEPTUNE , FL 32266

CGC1523419 (Exp: 08/31/2024) 904-667-3599

Sub Contractors

MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
JACK RICHARD SHEKIRA
Status Location Address State License Number Phone
INACTIVE

1833 LIVE OAK DR

JACKSONVILLE, FL 32246

CCC048193 (Exp: 08/31/2026) 904-725-4089
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 01/18/2022 FINAL APPROVED JHARDING
PLUMBING FINAL 12/22/2021 Approval - Private Provider PPROVIDER
HVAC FINAL 12/22/2021 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 12/22/2021 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 12/22/2021 Approval - Private Provider PPROVIDER
FINAL SURVEY (OFFICE USE ONLY) 12/20/2021 APPROVED GBERTOLA
ROW - FINAL APRON (AFTER POUR) 12/20/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 12/20/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 12/20/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ELECTRIC - EARLY POWER 12/08/2021 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 11/10/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 11/05/2021 CANCELLED BY APPLICANT RGROSS
U-CROSS CONNECTION 10/25/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
U - SEWER TIE IN 10/25/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 10/25/2021 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 10/05/2021 CANCELLED BY INSPECTOR CSTONE
Note: This is a gravity area no PEP needed.
INSULATION 09/14/2021 Approval - Private Provider PPROVIDER
ALL ROUGH 08/25/2021 Approval - Private Provider PPROVIDER
WALL SHEATHING 07/26/2021 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2021 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 07/26/2021 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 07/12/2021 Disapproved - NO FEE RGROSS
Note: Builder must keep drainage open across the swale at all times during construction. Next inspection 7/15/21. Tried to call...busy signal only.
FOUND SURVEY APPROVED (OFFICE) 06/16/2021 APPROVED TBAKER
MONOLITHIC SLAB 05/17/2021 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 05/05/2021 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 04/28/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN HOLD 06/16/2021 06/16/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY
BADMIN COMPLETE 06/16/2021 06/16/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/16/2021 06/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/16/2021 06/16/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 02/25/2021 02/25/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 02/19/2021 05/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 02/18/2021 02/24/2021
Note: Released By: JPI
CUSVC COMPLETE 02/18/2021 02/19/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 02/18/2021 02/19/2021
Note: Held By: JOSH MUNSON - (386)341-3640 - Submit electric riser diagram
ENGIN1 COMPLETE 02/18/2021 02/19/2021
Note: Released By: TIM BAKER - - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 02/18/2021 02/22/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 02/18/2021 02/19/2021
Note: Released By: CHRIS PISCITELLI - (386)597-9959 - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 02/18/2021 02/24/2021
Note: Released By: JPI
SW1 COMPLETE 02/18/2021 02/24/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 02/18/2021 02/22/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 04/26/2021
WATER- TURN ON ¤25.00 04/26/2021
ADMIN FEE ¤20.00 04/26/2021
CONNECTION FEES ¤1,017.83 04/26/2021
BUILDING DISCOUNT 100% (¤1,044.20) 04/26/2021
ELECTRIC FEE ¤180.60 04/26/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/26/2021
IMPACT FEE FIRE ¤367.00 04/26/2021
IMPACT FEE PARKS ¤1,199.12 04/26/2021
IMPACT FEE SCHOOL ¤3,600.00 04/26/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/26/2021
MECHANICAL FEE ¤180.60 04/26/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/26/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/26/2021
PLAN CHECK FEE ¤80.40 04/26/2021
PLUMBING FEE ¤180.60 04/26/2021
NEW RESIDENTIAL INSPECTIONS ¤402.00 04/26/2021
SITE PLAN 20 ¤20.00 04/26/2021
SURCHARGE FS 533.721 ¤2.00 04/26/2021
SURCHARGE - FS 468.631 ¤2.00 04/26/2021
STORM WATER PERMIT FEES ¤80.00 04/26/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/26/2021
SEWER INSPECTION ¤25.00 04/26/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/26/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/26/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,131.43