I want to search for...
Permit #2021021002
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00510-0030 |
| CONDITIONED SPACE: 2117 sqft |
| GARAGE: 701 sqft |
| OPENED PORCH (WITH ROOF) : 186 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| Total Square Footage: 3042 sqft |
| Block: 00510 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: (386)437-1508 |
| Location Address: 15 RALEIGH DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/15/2021 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: TRUST NO 15RD |
|
Address PO BOX 186 LAKE WALES, FL 33859 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/17/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION IS GOING TO HOLD WATER IN THE BACK RIGHT CORNER, NEED TO MOVE THE WATER TO THE FRONT LETTER HEAD IS ON THE CITY . | |||
| ROW - STORMWATER FINAL | 12/16/2021 | APPROVED | RGROSS |
| BLD - BUILDING FINAL | 12/16/2021 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Sewer line next to condensor is missing a cap No hot water possibly due to the breaker being off. The plenums and wire running through the garage wall and ceiling need to be sealed Have the trash removed from the garage. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/15/2021 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 12/15/2021 | Disapproved - NO FEE | JWALKER |
| Note: Sewer line next to condensor is missing a cap No hot water possibly due to the breaker being off. The plenums and wire running through the garage wall and ceiling need to be sealed Have the trash removed from the garage. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/14/2021 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/14/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: IS GOING TO HOLD WATER IN THE BACK RIGHT CORNER, NEED TO MOVE THE WATER TO THE FRONT | |||
| ROW - FINAL APRON (AFTER POUR) | 12/14/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| GRAVITY SEWER TEST | 12/06/2021 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/17/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION CULVERT PIPE IS OUT OF TOLERANCE ON THE RIGHT SIDE . PLEASE RESET THE PIPE ACCORDING SWALE PLAN APRON WING NEED TO BE MINIMUM 36 INCH,CHECK THAT THERE IS 36 INCHES OF FLARE ON THE DRIVEWAY APRON. 11/17/2021=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/16/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: CULVERT PIPE IS OUT OF TOLERANCE ON THE RIGHT SIDE . PLEASE RESET THE PIPE ACCORDING SWALE PLAN APRON WING NEED TO BE MINIMUM 36 INCH,CHECK THAT THERE IS 36 INCHES OF FLARE ON THE DRIVEWAY APRON. | |||
| U - SEWER TIE IN | 10/28/2021 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 10/28/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 10/18/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Unable to gain access Front door locked, rear slider locked, and garage door locked 10/18/21 Emailed FPL at 9:20 am | |||
| ELECTRIC - EARLY POWER | 10/13/2021 | Disapproved - NO FEE | JWALKER |
| Note: Unable to gain access Front door locked, rear slider locked, and garage door locked | |||
| PEP TANK INSTALLATION REQUEST | 09/30/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 09/16/2021 | APPROVED | JWALKER |
| INSULATION | 09/13/2021 | APPROVED | JWALKER |
| ALL ROUGH | 09/03/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Phase out 2 wire in electrical panel The smoke detector conduit needs to have all grounds tied together. The large flex duct in bedroom near garage needs to be lifted off ceiling joist to allow for proper insulation fill The dryer duct fittings need to be sealed and where the 2x6 was notched out install 16ga strap Kitchen hood exhaust vent needs to be completely sealed 14-2 wire hanging in garage is not terminated in outlet boxes and ground not tied Recessed light mounting brackets in master bed are not installed properly. ceiling joists running through center cut outs. 8/31/21 Corrections from above list that still need to be addressed Phase out 2 wire in electrical pane The large flex duct in bedroom near garage needs to be lifted off ceiling joist to allow for proper insulation fill The dryer duct fittings need to be sealed and where the 2x6 was notched out install 16ga strap Kitchen hood exhaust vent needs to be completely sealed Recessed light mounting brackets in master bed are not installed properly. ceiling joists running through center cut outs. | |||
| ALL ROUGH | 08/31/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Phase out 2 wire in electrical panel The smoke detector conduit needs to have all grounds tied together. The large flex duct in bedroom near garage needs to be lifted off ceiling joist to allow for proper insulation fill The dryer duct fittings need to be sealed and where the 2x6 was notched out install 16ga strap Kitchen hood exhaust vent needs to be completely sealed 14-2 wire hanging in garage is not terminated in outlet boxes and ground not tied Recessed light mounting brackets in master bed are not installed properly. ceiling joists running through center cut outs. 8/31/21 Corrections from above list that still need to be addressed Phase out 2 wire in electrical pane The large flex duct in bedroom near garage needs to be lifted off ceiling joist to allow for proper insulation fill The dryer duct fittings need to be sealed and where the 2x6 was notched out install 16ga strap Kitchen hood exhaust vent needs to be completely sealed Recessed light mounting brackets in master bed are not installed properly. ceiling joists running through center cut outs. | |||
| ALL ROUGH | 08/27/2021 | Disapproved - NO FEE | JWALKER |
| Note: Phase out 2 wire in electrical panel The smoke detector conduit needs to have all grounds tied together. The large flex duct in bedroom near garage needs to be lifted off ceiling joist to allow for proper insulation fill The dryer duct fittings need to be sealed and where the 2x6 was notched out install 16ga strap Kitchen hood exhaust vent needs to be completely sealed 14-2 wire hanging in garage is not terminated in outlet boxes and ground not tied Recessed light mounting brackets in master bed are not installed properly. ceiling joists running through center cut outs. | |||
| ROOF VALLEY & METAL | 07/23/2021 | APPROVED - AS NOTED | JWALKER |
| Note: field nailing of underlayment is to be 12" o.c. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 06/12/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/04/2021 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 05/06/2021 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 05/06/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/03/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 04/15/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/14/2021 | 12/17/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2021 | 06/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/11/2021 | 06/11/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/26/2021 | 06/03/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Correcion to revision: changed product approval to (3) Anderson windows. | |||
| BLD | HOLD | 05/18/2021 | 05/25/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision - changed windows to Anderson (manufacturer). 1. Provide product approval of exterior windows to be changed to Anderson per F.S. 553.842. 2. Letter of the Architect of record regarding the change of window sills for different addresses/permits shall also be included in revision and shall be submitted to corresponding permits/addresses for clarity per FBC 7th Ed. Sec. 107.2.1. | |||
| ZON | COMPLETE | 03/12/2021 | 03/12/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/11/2021 | 03/11/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/11/2021 | 03/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | HOLD | 03/11/2021 | 03/11/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM One additional shrub required on right side to total four. Not at the ac pad. On the front right side we need four shrubs. Need one more. | |||
| BLD | COMPLETE | 03/05/2021 | 03/05/2021 |
| Note: Released By: JOHN BODEN - (386)986-2624 - JBODEN@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/22/2021 | 02/22/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Centerline of road elevations differ from ITT as-builts by 1' +/- | |||
| SWALE | COMPLETE | 02/19/2021 | 05/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/18/2021 | 02/25/2021 |
| Note: Held By: JPI 1. Truss plan indicates bearing wall at 8’ at entry. Section cut on 4 on page A-4 indicates bearing elevation at 10’-4”. Provide accurate plans. 2. Provide design loads. | |||
| CUSVC | COMPLETE | 02/18/2021 | 02/23/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 02/18/2021 | 02/19/2021 |
| Note: Held By: JOSH MUNSON - (386)341-3640 - 1. Add one outlet in garage. NEC 2017 210.52 (G) (1) 2. Smoke alarm outside of guest bedrooms needs to be a combination alarm. FRC 2020 314.3 & 315.1 | |||
| ENGIN1 | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: TIM BAKER - - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)597-9959 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 02/18/2021 | 02/25/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/18/2021 | 02/24/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/18/2021 | 02/22/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM One additional tree required for this lot One additional shrub required on right side to total four |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 12/16/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 12/16/2021 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/16/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/15/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/15/2021 |
| SEWER CREDIT | (¤2,095.60) | 03/15/2021 |
| SEWER INSPECTION | ¤25.00 | 03/15/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/15/2021 |
| WATER CREDIT | (¤426.66) | 03/15/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/15/2021 |
| METER - DEPOSIT | ¤60.00 | 03/15/2021 |
| WATER- TURN ON | ¤25.00 | 03/15/2021 |
| ADMIN FEE | ¤20.00 | 03/15/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/15/2021 |
| BUILDING DISCOUNT 100% | (¤1,346.60) | 03/15/2021 |
| ELECTRIC FEE | ¤223.80 | 03/15/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/15/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/15/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/15/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/15/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/15/2021 |
| MECHANICAL FEE | ¤223.80 | 03/15/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/15/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/15/2021 |
| PLAN CHECK FEE | ¤109.20 | 03/15/2021 |
| PLUMBING FEE | ¤223.80 | 03/15/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤546.00 | 03/15/2021 |
| SITE PLAN 20 | ¤20.00 | 03/15/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/15/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/15/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,679.17 |