I want to search for...
Permit #2021021022
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00560-0080 |
| CONDITIONED SPACE: 1707 sqft |
| OPENED PORCH (WITH ROOF) : 235 sqft |
| GARAGE: 592 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 2576 sqft |
| Block: 00560 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: (386) 445-7001 |
| Location Address: 18 BURBANK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/03/2021 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: ANDERSON REALTY FLORIDA LP |
|
Address 8 CARLOS COURT PALM COAST, FL 32137 |
|
Address % LEWERS & ASSOCIATES PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/14/2022 | FINAL APPROVED | MKRASKI |
| Note: | |||
| ROW - STORMWATER FINAL | 10/14/2022 | FINAL APPROVED | EMADISON |
| Note: ** 10/14/22 ALL CORRECTIONS MADE 10/12/2022 - PREVIOUS INSPECTION NOTES ** 10/12/22 LEFT FRONT CONER OF HOUSE NEED TO FILL HOLE AND SOD AS YOU HAVE A WASHOUT ** CULVERT ENDS NEED TO BE CLEANED OF SEDIMENT AND OVER POUR OF CONCRETE ** BEFORE FINAL ROW IS APPROVED ** 08/23/22 REAR OF HOUSE IS TOO LOW HOLDING WATER WHICH IS PONDING NEEDS TO HAVE A POSITIVE FLOW TO THE FRONT. ** RIGHT SIDE THERE APPEARS TO BE A LEAK IN THE IRRIGATION AS THERE IS A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** LEFT SIDE AT FRONT CORNER OF HOUSE ALSI APPEARS TO BE AN IRRIGATION LEAK CFREATING A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** CLEAN OUT CULVERT ENDS | |||
| U -UTILITY RESIDENTIAL FINAL | 10/12/2022 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 10/12/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/12/22 LEFT FRONT CONER OF HOUSE NEED TO FILL HOLE AND SOD AS YOU HAVE A WASHOUT ** CULVERT ENDS NEED TO BE CLEANED OF SEDIMENT AND OVER POUR OF CONCRETE ** BEFORE FINAL ROW IS APPROVED ** 08/23/22 REAR OF HOUSE IS TOO LOW HOLDING WATER WHICH IS PONDING NEEDS TO HAVE A POSITIVE FLOW TO THE FRONT. ** RIGHT SIDE THERE APPEARS TO BE A LEAK IN THE IRRIGATION AS THERE IS A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** LEFT SIDE AT FRONT CORNER OF HOUSE ALSI APPEARS TO BE AN IRRIGATION LEAK CFREATING A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** CLEAN OUT CULVERT ENDS | |||
| ROW - FINAL APRON (AFTER POUR) | 10/12/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** 08/23/22 REAR OF HOUSE IS TOO LOW HOLDING WATER WHICH IS PONDING NEEDS TO HAVE A POSITIVE FLOW TO THE FRONT. ** RIGHT SIDE THERE APPEARS TO BE A LEAK IN THE IRRIGATION AS THERE IS A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** LEFT SIDE AT FRONT CORNER OF HOUSE ALSI APPEARS TO BE AN IRRIGATION LEAK CFREATING A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** CLEAN OUT CULVERT ENDS | |||
| BLD - BUILDING FINAL | 10/12/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Breaker lock required for AHU 2. Hole in drywall above door bell transformer 3. No energy cals on site 4. Porch light not working (back) 5. Side door to the garage light not working 5. Termite treatment sticker missing on electrical panel | |||
| U-CROSS CONNECTION | 10/12/2022 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2022 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/23/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/23/22 REAR OF HOUSE IS TOO LOW HOLDING WATER WHICH IS PONDING NEEDS TO HAVE A POSITIVE FLOW TO THE FRONT. ** RIGHT SIDE THERE APPEARS TO BE A LEAK IN THE IRRIGATION AS THERE IS A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** LEFT SIDE AT FRONT CORNER OF HOUSE ALSI APPEARS TO BE AN IRRIGATION LEAK CFREATING A HOLE IN THE DRAINAGE CONVEYANCE FROM EROSION ** CLEAN OUT CULVERT ENDS | |||
| ROW- PRE-APRON (PRE-POUR) | 06/29/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ** APRON IS READY TO POUR PARTIAL APPROVAL, NEED TO SCHEDULE ANOTHER PRE-POUR ONCE PAVER BASE IS DOWN AND COMPACTED PRIOR TO SETTING PAVERS. EM NEED MORE COMPACTION AROUND CULVERT PIPE NEED TO RESUBMIT A NEW SITE PLAN THAT SHOWS THAT YOU ARE PUTTING IN A PAVER DRIVEWAY THE SITE PLAN THATS IN THE SYSTEM SHOWS THAT YOU ARE PUTTING IN A 16' CONCRETE DRIVEWAY THE PIPE IS GOOD AND THE PAVER RESTRAINTS ARE GOOD ALSO NEED MORE COMPACTION AND NEW SITE PLAN BEFORE YOU PUT THIS INSPECTION BACK ON | |||
| ROW- PRE-APRON (PRE-POUR) | 06/27/2022 | PARTIALLY APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** APRON IS READY TO POUR PARTIAL APPROVAL, NEED TO SCHEDULE ANOTHER PRE-POUR ONCE PAVER BASE IS DOWN AND COMPACTED PRIOR TO SETTING PAVERS. EM NEED MORE COMPACTION AROUND CULVERT PIPE NEED TO RESUBMIT A NEW SITE PLAN THAT SHOWS THAT YOU ARE PUTTING IN A PAVER DRIVEWAY THE SITE PLAN THATS IN THE SYSTEM SHOWS THAT YOU ARE PUTTING IN A 16' CONCRETE DRIVEWAY THE PIPE IS GOOD AND THE PAVER RESTRAINTS ARE GOOD ALSO NEED MORE COMPACTION AND NEW SITE PLAN BEFORE YOU PUT THIS INSPECTION BACK ON | |||
| ROW- PAVER RESTRAINTS | 06/27/2022 | APPROVED - AS NOTED | EMADISON |
| Note: THIS IS A REINSPECTION ** PAVER RESTRAINTS READY TO POUR. | |||
| ROW- PAVER RESTRAINTS | 06/15/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO RESUBMIT A NEW SITE PLAN THAT SHOWS THAT YOU ARE PUTTING IN A PAVER DRIVEWAY THE SITE PLAN THATS IN THE SYSTEM SHOWS THAT YOU ARE PUTTING IN A 16' CONCRETE DRIVEWAY | |||
| ROW- PRE-APRON (PRE-POUR) | 06/15/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED MORE COMPACTION AROUND CULVERT PIPE NEED TO RESUBMIT A NEW SITE PLAN THAT SHOWS THAT YOU ARE PUTTING IN A PAVER DRIVEWAY THE SITE PLAN THATS IN THE SYSTEM SHOWS THAT YOU ARE PUTTING IN A 16' CONCRETE DRIVEWAY THE PIPE IS GOOD AND THE PAVER RESTRAINTS ARE GOOD ALSO NEED MORE COMPACTION AND NEW SITE PLAN BEFORE YOU PUT THIS INSPECTION BACK ON | |||
| ELECTRIC - EARLY POWER | 05/31/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:20 AM | |||
| ELECTRIC-TUG | 05/31/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:20 AM | |||
| GRAVITY SEWER TEST | 04/05/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION SPOKE TO RICHIE | |||
| U - SEWER TIE IN | 04/05/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION SPOKE TO RICHIE | |||
| U - SEWER TIE IN | 04/04/2022 | CANCELLED BY APPLICANT | MGIBSON |
| Note: SPOKE TO RICHIE | |||
| GRAVITY SEWER TEST | 04/04/2022 | CANCELLED BY APPLICANT | MGIBSON |
| Note: SPOKE TO RICHIE | |||
| PEP TANK INSTALLATION REQUEST | 03/15/2022 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 10/22/2021 | APPROVED | FWILLIS |
| INSULATION | 10/05/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 09/07/2021 | APPROVED - AS NOTED | KSANDOE |
| Note: Missing door to back porch must be installed prior to insulation inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/27/2021 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please povide a full set of approved drawings and Truss engineering packet for this inspection. Engineering packet not in job box or in the building. FBC 107.3.1 8/3/21 - ROOF SHEATHING ONLY!! ALSO LOOKED AT SCREWS ON SGD SO A WALL CAN BE FRAMED. SLAB THAT WAS REVISED, IN KITCHEN AREA, HAD TERMITE TREATMENT AND WAS GOOD. | |||
| ROOF VALLEY & METAL | 08/16/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/03/2021 | PARTIALLY APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Please povide a full set of approved drawings and Truss engineering packet for this inspection. Engineering packet not in job box or in the building. FBC 107.3.1 8/3/21 - ROOF SHEATHING ONLY!! ALSO LOOKED AT SCREWS ON SGD SO A WALL CAN BE FRAMED. SLAB THAT WAS REVISED, IN KITCHEN AREA, HAD TERMITE TREATMENT AND WAS GOOD. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/02/2021 | Disapproved - NO FEE | JWALKER |
| Note: Please povide a full set of approved drawings and Truss engineering packet for this inspection. Engineering packet not in job box or in the building. FBC 107.3.1 | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/30/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/10/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 04/23/2021 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/16/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 04/12/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/17/2022 | 06/17/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/16/2022 | 06/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/16/2022 | 06/23/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/16/2022 | 06/16/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM When installing a paver driveway, a fully completed, signed and notarized Right of Way Utilization Agreement must be submitted. It must be signed by all persons on deed to property and all owners signatures must be notarized. | |||
| BLD | COMPLETE | 07/15/2021 | 07/22/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/01/2021 | 07/12/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide detail/section showing how the load path from kitchen load bearing foundation to the trusses will be accomplished per FBCR 7th Ed. Sec. 301.1. | |||
| BLD | COMPLETE | 06/02/2021 | 06/08/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/28/2021 | 04/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2021 | 04/28/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/02/2021 | 03/02/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/02/2021 | 03/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/24/2021 | 02/24/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/19/2021 | 05/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/18/2021 | 02/25/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 02/18/2021 | 02/19/2021 |
| Note: Held By: JOSH MUNSON - (386)341-3640 - 1. Need to reference the 2017 NEC not the 2020 2. Electric load calcs do not match the square footage of the house. Need to be done to the living space. NEC 2017 220 3. Smoke alarms outside of bedrooms need to be a combo alarm. FRC 2020 314.3 & 315.1 | |||
| ENGIN1 | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: TIM BAKER - - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 02/18/2021 | 02/19/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/18/2021 | 02/19/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)597-9959 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be from the 2020 7Th edition code cycle | |||
| PLUM | COMPLETE | 02/18/2021 | 02/25/2021 |
| Note: Released By: JPI |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| 10/14/2022 | ||
| CONTRACTOR CHANGE | ¤40.00 | 10/14/2022 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 10/14/2022 |
| RECORDING FEE REIMBURSE DOC | ¤68.50 | 10/14/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/14/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/14/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/03/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/03/2021 |
| SEWER CREDIT | (¤850.00) | 03/03/2021 |
| SEWER INSPECTION | ¤25.00 | 03/03/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/03/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/03/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/03/2021 |
| MECHANICAL FEE | ¤210.00 | 03/03/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/03/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/03/2021 |
| PLAN CHECK FEE | ¤100.00 | 03/03/2021 |
| PLUMBING FEE | ¤210.00 | 03/03/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 03/03/2021 |
| SITE PLAN 20 | ¤20.00 | 03/03/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/03/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/03/2021 |
| BUILDING DISCOUNT 100% | (¤1,250.00) | 03/03/2021 |
| ELECTRIC FEE | ¤210.00 | 03/03/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/03/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/03/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/03/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/03/2021 |
| METER - DEPOSIT | ¤60.00 | 03/03/2021 |
| WATER- TURN ON | ¤25.00 | 03/03/2021 |
| ADMIN FEE | ¤20.00 | 03/03/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/03/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,483.93 |