Permit #2021021060
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01380-0320 |
| CONDITIONED SPACE: 2026 sqft |
| GARAGE: 706 sqft |
| OPENED PORCH (WITH ROOF) : 352 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 3144 sqft |
| Block: 01380 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-960-7720 |
| Location Address: 20 LEIDEL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/10/2021 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: UZAR PETER & MAGDALENA D H&W |
|
Address 74 ALDEN STREET WALLINGTON, NJ 07057 |
| Lot: 0320 |
| Contracted Stated Job Value: ¤326,920.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 11/17/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Cold patch for road repair not accepted. Must be hot patch. read the notes hot patch only in the road corrections made | |||
| ROW - STORMWATER FINAL | 11/17/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Pick up misc trash in the ROW and along the right side property line in the vacant. hot patch asphault repair is the only accepted road repair corrections made | |||
| ROW - STORMWATER FINAL | 11/02/2021 | Disapproved - NO FEE | KRUTH |
| Note: THIS IS A REINSPECTION Pick up misc trash in the ROW and along the right side property line in the vacant. hot patch asphault repair is the only accepted road repair | |||
| BLD - BUILDING FINAL | 11/02/2021 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 11/02/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION Cold patch for road repair not accepted. Must be hot patch. read the notes hot patch only in the road | |||
| ROW - FINAL APRON (AFTER POUR) | 10/29/2021 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 10/29/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Cold patch for road repair not accepted. Must be hot patch. | |||
| ROW - STORMWATER FINAL | 10/29/2021 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 10/29/2021 | Disapproved - NO FEE | RGROSS |
| Note: Pick up misc trash in the ROW and along the right side property line in the vacant. | |||
| BLD - BUILDING FINAL | 10/29/2021 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 10/29/2021 | CANCELLED BY APPLICANT | RMARTIN |
| U -UTILITY RESIDENTIAL FINAL | 10/28/2021 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/27/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 10/27/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 08/26/2021 | APPROVED - AS NOTED | KRUTH |
| Note: fix the washouts before pouring concrete pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC - EARLY POWER | 08/10/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:30 | |||
| ELECTRIC - EARLY POWER | 08/04/2021 | Disapproved - NO FEE | JMUNSON |
| Note: UFER ground needs to be protected. NEC 2017 250.64 | |||
| GRAVITY SEWER TEST | 08/02/2021 | APPROVED | JGIBSON |
| U-CROSS CONNECTION | 08/02/2021 | APPROVED | DHANEY |
| U - SEWER TIE IN | 08/02/2021 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/18/2021 | APPROVED | FWILLIS |
| INSULATION | 06/14/2021 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 06/11/2021 | APPROVED | CSTONE |
| ALL ROUGH | 06/08/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 05/18/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/12/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2021 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 05/03/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/30/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 04/14/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/12/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 03/24/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/03/2021 | 05/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/03/2021 | 05/03/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/23/2021 | 04/30/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/19/2021 | 02/26/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 02/19/2021 | 02/19/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 02/19/2021 | 02/19/2021 |
| Note: Released By: JOSH MUNSON - (386)341-3640 - | |||
| ENGIN1 | COMPLETE | 02/19/2021 | 02/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 02/19/2021 | 02/22/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/19/2021 | 02/23/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 02/19/2021 | 02/25/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/19/2021 | 02/25/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/19/2021 | 02/24/2021 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - | |||
| SWALE | COMPLETE | 02/19/2021 | 05/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 11/17/2021 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2021 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/10/2021 |
| SEWER INSPECTION | ¤25.00 | 03/10/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/10/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/10/2021 |
| METER - DEPOSIT | ¤60.00 | 03/10/2021 |
| WATER- TURN ON | ¤25.00 | 03/10/2021 |
| ADMIN FEE | ¤20.00 | 03/10/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/10/2021 |
| BUILDING DISCOUNT 100% | (¤1,573.40) | 03/10/2021 |
| ELECTRIC FEE | ¤256.20 | 03/10/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/10/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/10/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/10/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/10/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/10/2021 |
| MECHANICAL FEE | ¤256.20 | 03/10/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/10/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/10/2021 |
| PLAN CHECK FEE | ¤130.80 | 03/10/2021 |
| PLUMBING FEE | ¤256.20 | 03/10/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤654.00 | 03/10/2021 |
| SITE PLAN 20 | ¤20.00 | 03/10/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/10/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/10/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,191.43 |