Permit #2021030303
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7057-00420-0080 |
| CONDITIONED SPACE: 1538 sqft |
| CONDITIONED SPACE: 1538 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| GARAGE: 440 sqft |
| GARAGE: 440 sqft |
| Total Square Footage: 4340 sqft |
| Block: 00420 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 386-447-7007 |
| Location Address: 7 UNTERMEYER PL |
| Type: DU - DUPLEX |
| Issue Date: 04/21/2021 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: KUROWSKI MICHAEL F & JANINE R KUROWSKI |
|
Address 50 SABEL BEND PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤386,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 12/19/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/19/2022 | APPROVED | PFLANAGAN |
| Note: 12/8/2022 - PREVIOUS INSPECTION NOTES THERE IS NO CENTERLINE OF ROAD ELEVATIONS. THERE ARE NO INVERT ELEVATIONS OF THE CULVERT PIPE ------------------------------------------------------------------------------------------------------ 11/29/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ---------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/19/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL INSPECTION | 12/19/2022 | FINAL APPROVED | PFLANAGAN |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/08/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THERE IS NO CENTERLINE OF ROAD ELEVATIONS. THERE ARE NO INVERT ELEVATIONS OF THE CULVERT PIPE ------------------------------------------------------------------------------------------------------ 11/29/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ---------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/29/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ---------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/17/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/27/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/20/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW - FINAL INSPECTION | 09/08/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| BLD - BUILDING FINAL | 09/08/2022 | FINAL APPROVED | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A 8-31-22 1. Units A & B engery cals dont match equipment. 2. Master shower unit B does not work. 3. Unit A has no power to back half of duplex. Inspection on unit B is complete unit A needs to be finished. 9-2-22 1. No insulation in duplex. | |||
| BLD - BUILDING FINAL | 09/02/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A 8-31-22 1. Units A & B engery cals dont match equipment. 2. Master shower unit B does not work. 3. Unit A has no power to back half of duplex. Inspection on unit B is complete unit A needs to be finished. 9-2-22 1. No insulation in duplex. | |||
| BLD - BUILDING FINAL | 08/31/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A | |||
| BLD - BUILDING FINAL | 08/31/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A 8-31-22 1. Units A & B engery cals dont match equipment. 2. Master shower unit B does not work. 3. Unit A has no power to back half of duplex. Inspection on unit B is complete unit A needs to be finished. | |||
| BLD - BUILDING FINAL | 08/26/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A | |||
| ROW - FINAL INSPECTION | 08/26/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 08/26/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 08/25/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| U-CROSS CONNECTION | 08/25/2022 | APPROVED - AS NOTED | JHARDING |
| Note: THIS IS A REINSPECTION Right meter missing DC Backflow . [duplex] No irrigation, no cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/25/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 08/25/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION | |||
| BLD - BUILDING FINAL | 08/25/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 8-25-22 1. Not ready | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/24/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/15/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT | |||
| ELECTRIC - EARLY POWER | 07/27/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: THIS IS A REINSPECTION load calcs call for 200a service per unit not 125a that is installed 7/27/22 load calcs call for 200a service per unit not 125a that is installed Panels must be labeled A and B | |||
| ELECTRIC - EARLY POWER | 07/27/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION load calcs call for 200a service per unit not 125a that is installed 7/27/22 load calcs call for 200a service per unit not 125a that is installed Panels must be labeled A and B 7/27/22 Emailed FPL at 3:40 pm | |||
| ELECTRIC - EARLY POWER | 07/18/2022 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 07/15/2022 | Disapproved - NO FEE | RMARTIN |
| Note: load calcs call for 200a service per unit not 125a that is installed | |||
| ELECTRIC - EARLY POWER | 07/12/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 07/11/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 7/11/22 IT'S THE CONTRACTORS RESPONSIBILTY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE ------------------------------------------------------------------------------------------------------------------------------- 7/8/22 DRIVEWAY IS STILL READY FORM NOT DONE PIPE ELEVATIONS ARE GOOD AT TIME OF INSPECTION 7/8/22 DRIVEWAY IS NOT FORMED ALL THE WAY AT TIME OF INSPECTION 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/08/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 7/8/22 DRIVEWAY IS NOT FORMED ALL THE WAY AT TIME OF INSPECTION 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/08/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 7/8/22 DRIVEWAY IS STILL READY FORM NOT DONE PIPE ELEVATIONS ARE GOOD AT TIME OF INSPECTION 7/8/22 DRIVEWAY IS NOT FORMED ALL THE WAY AT TIME OF INSPECTION 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/27/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/14/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed. | |||
| GRAVITY SEWER TEST | 06/14/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/13/2022 | Disapproved - NO FEE | DHANEY |
| Note: Right meter missing DC Backflow . [duplex] | |||
| ROW- PRE-APRON (PRE-POUR) | 06/10/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed. | |||
| U - SEWER TIE IN | 06/10/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS IS A REINSPECTION No stub ups, cleanouts, no tie in at street, no evidence the work is complete BOTH GRAVITY SEWER AND U-SEWER TIE IN APPROVED C/M TO SCHEDULE GRAVITY SEWER ON MONDAY | |||
| ROW- PRE-APRON (PRE-POUR) | 06/09/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: Not ready for inspection. Not formed. | |||
| U - SEWER TIE IN | 06/07/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: No stub ups, cleanouts, no tie in at street, no evidence the work is complete | |||
| INSULATION | 04/25/2022 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 04/19/2022 | APPROVED | TSTAUFFACHER |
| Note: Prior to calling in, verify nail/staple spacing is no greater than 7"--As of 03/23/2022-spacing is greater than 7" | |||
| ALL ROUGH | 04/18/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION No head pressure on DWV pipes Missing protection plates above electric panels in both units | |||
| ALL ROUGH | 04/11/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: No head pressure on DWV pipes Missing protection plates above electric panels in both units | |||
| ALL ROUGH | 03/24/2022 | CANCELLED BY APPLICANT | WEB |
| FIREWALL FINAL | 03/24/2022 | APPROVED | DCUSHING |
| FIREWALL DRYWALL NAILING | 03/23/2022 | APPROVED | TSTAUFFACHER |
| Note: Done with tie down inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/23/2022 | APPROVED | TSTAUFFACHER |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans 02/01/2022: Right Side- Truss A3-A4-A5-A6-A7 All missing engineering Inspection stopped-Please check house and call back when ready Left side not inspected | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/09/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans 02/01/2022: Right Side- Truss A3-A4-A5-A6-A7 All missing engineering Inspection stopped-Please check house and call back when ready Left side not inspected | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/01/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans 02/01/2022: Right Side- Truss A3-A4-A5-A6-A7 All missing engineering Inspection stopped-Please check house and call back when ready Left side not inspected | |||
| ROOF VALLEY & METAL | 11/15/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/05/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/04/2021 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 09/14/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Multiple dowel rods missing//job not ready | |||
| TIE BEAM / LINTEL | 09/07/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Multiple dowel rods missing//job not ready | |||
| MONOLITHIC SLAB | 05/25/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 05/20/2021-Below rejection not completed. Footings still washed in and 3" clearance still not met. If possible, see attached photos. THIS IS A REINSPECTION Footings need to be cleaned up from trash, debris and collapsed soil. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). THIS IS A REINSPECTION Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage | |||
| MONOLITHIC SLAB | 05/20/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: 05/20/2021-Below rejection not completed. Footings still washed in and 3" clearance still not met. If possible, see attached photos. THIS IS A REINSPECTION Footings need to be cleaned up from trash, debris and collapsed soil. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). THIS IS A REINSPECTION Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage | |||
| MONOLITHIC SLAB | 05/18/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Footings need to be cleaned up from trash, debris and collapsed soil. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). THIS IS A REINSPECTION Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage | |||
| MONOLITHIC SLAB | 05/13/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage Termite treat certificate missing// or intent to use boracare | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/07/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 04/22/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 11/15/2022 | 11/15/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Plans should be named in accordance with their given sheet name and a description – examples are: 1 = Floor Plan *3 = Truss Layout……..Once file name is corrected – re submit. | |||
| BADMIN | INFORMATION | 08/19/2022 | 08/19/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM sheet says final survey- nothing was uploaded. | |||
| ELEC | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | INFORMATION | 06/24/2022 | 06/24/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF | |||
| BADMIN | INFORMATION | 06/24/2022 | 06/24/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF | |||
| ENGIN1 | COMPLETE | 06/24/2022 | 06/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/24/2022 | 06/24/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/10/2022 | 03/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/09/2022 | 03/10/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat comment: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Per the Building Inspectors comments, Engineering is required for Trusses A3,A4,A5,A6 and A7. Only a truss layout was submitted. Please provide the required engineering for the trusses. | |||
| BLD | HOLD | 03/04/2022 | 03/04/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Per the Building Inspectors comments, Engineering is required for Trusses A3,A4,A5,A6 and A7. Only a truss layout was submitted. Please provide the required engineering for the trusses. | |||
| MECH | COMPLETE | 12/03/2021 | 12/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/24/2021 | 11/29/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calc font is missing information. Please resubmit 2. Provide revised details page of plans showing insulation change | |||
| MECH | HOLD | 11/18/2021 | 11/18/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide submit revised energy calcs and plan sheets showing changes in insulation and soffit | |||
| BLD | COMPLETE | 11/17/2021 | 11/18/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Not Appplicable | |||
| ENGIN1 | COMPLETE | 11/04/2021 | 11/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/04/2021 | 11/04/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/05/2021 | 06/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/01/2021 | 04/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| SW1 | COMPLETE | 04/01/2021 | 04/07/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2021 | 04/05/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/23/2021 | 03/24/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Please revise survey benchmark elevations to read to the nearest hundredth of a foot. | |||
| ELEC | COMPLETE | 03/23/2021 | 03/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/23/2021 | 03/23/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/23/2021 | 03/23/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/23/2021 | 03/30/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/23/2021 | 03/24/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Please revise survey benchmark elevations to read to the nearest hundredth of a foot. | |||
| ENGIN1 | HOLD | 03/05/2021 | 03/05/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Please revise survey elevations to read to the nearest hundredth of a foot. | |||
| BLD | COMPLETE | 03/04/2021 | 03/08/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/04/2021 | 03/11/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 03/04/2021 | 03/05/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to reference the 2017 NEC 2. Need combo smoke alarm outside of master bedroom. FRC 2020 314.3, 315.1 3. Need to add outlet in garage. NEC 2017 210.52 (G) (1) 4. Submit electric load calcs. | |||
| ENGIN1 | COMPLETE | 03/04/2021 | 03/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 03/04/2021 | 03/09/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/04/2021 | 03/08/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic. Energy calcs say R21 on roof deck. Revise to match | |||
| PLUM | COMPLETE | 03/04/2021 | 03/08/2021 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 03/04/2021 | 03/11/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Culvert must be a Corrigated metal 17 x 13. Site plan shows 15 inch. | |||
| ZON | HOLD | 03/04/2021 | 03/05/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Please provide the front entry walkway width on site plan/survey | |||
| SWALE | COMPLETE | 03/04/2021 | 03/11/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/21/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 03/21/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/29/2021 |
| REINSPECTION FEE | ¤40.00 | 09/29/2021 |
| REINSPECTION FEE | ¤40.00 | 09/29/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 09/29/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 09/29/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 09/29/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 09/29/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/21/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 04/21/2021 |
| SEWER CREDIT | (¤1,700.00) | 04/21/2021 |
| SEWER INSPECTION | ¤25.00 | 04/21/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 04/21/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 04/21/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤786.00 | 04/21/2021 |
| SITE PLAN 20 | ¤20.00 | 04/21/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/21/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/21/2021 |
| CONNECTION FEES | ¤2,035.66 | 04/21/2021 |
| METER - DEPOSIT | ¤120.00 | 04/21/2021 |
| WATER- TURN ON | ¤50.00 | 04/21/2021 |
| ADMIN FEE | ¤20.00 | 04/21/2021 |
| BUILDING DISCOUNT 100% | (¤1,850.60) | 04/21/2021 |
| ELECTRIC FEE | ¤295.80 | 04/21/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 04/21/2021 |
| IMPACT FEE FIRE | ¤734.00 | 04/21/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 04/21/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 04/21/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 04/21/2021 |
| MECHANICAL FEE | ¤295.80 | 04/21/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/21/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 04/21/2021 |
| PLAN CHECK FEE | ¤157.20 | 04/21/2021 |
| PLUMBING FEE | ¤295.80 | 04/21/2021 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| SW ENG REINSPECTION 20 | ¤20.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| Fees | Total Due: ¤320.00 | Total Paid: ¤30,071.95 |