Permit #2021030303

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7057-00420-0080
CONDITIONED SPACE: 1538 sqft
CONDITIONED SPACE: 1538 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
GARAGE: 440 sqft
GARAGE: 440 sqft
Total Square Footage: 4340 sqft
Block: 00420
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: 386-447-7007
Location Address: 7 UNTERMEYER PL
Type: DU - DUPLEX
Issue Date: 04/21/2021
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: KUROWSKI MICHAEL F & JANINE R KUROWSKI

Address

50 SABEL BEND

PALM COAST, FL 32137

Lot: 0080
Contracted Stated Job Value: ¤386,000.00
Job Description: Duplex
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 12/19/2022 APPROVED PFLANAGAN
Note: THIS IS A REINSPECTION NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/19/2022 APPROVED PFLANAGAN
Note: 12/8/2022 - PREVIOUS INSPECTION NOTES THERE IS NO CENTERLINE OF ROAD ELEVATIONS. THERE ARE NO INVERT ELEVATIONS OF THE CULVERT PIPE ------------------------------------------------------------------------------------------------------ 11/29/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ---------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW FIELD SURVEY /GRADING CERTIFICATION 12/19/2022 APPROVED PFLANAGAN
ROW - FINAL INSPECTION 12/19/2022 FINAL APPROVED PFLANAGAN
Note: New inspection due to canceled inspection THIS IS A REINSPECTION NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/08/2022 Disapproved - NO FEE PFLANAGAN
Note: THERE IS NO CENTERLINE OF ROAD ELEVATIONS. THERE ARE NO INVERT ELEVATIONS OF THE CULVERT PIPE ------------------------------------------------------------------------------------------------------ 11/29/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ---------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/29/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ---------------------------------------------------------------------------------------------- 11/17/2022 - PREVIOUS INSPECTION NOTES THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/17/2022 Disapproved - NO FEE PFLANAGAN
Note: THERE IS NO FFE ON THE HOUSE CAN NOT DETERMIND IF THE FFE IS 12" ABOVE THE CENTERLINE OF ROAD AND CAN NOT DETERMIND IF YOU HAVE THE 5% OF FALL 10' OFF THE HOUSE AND CAN NOR DETERMIND IF SOD ELEVATIONS ARE 4" BELOW FFE FOR THIS HOME ------------------------------------------------------------------------------------------------------- 9/27/2022 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/27/2022 Disapproved - NO FEE PFLANAGAN
Note: THE NEW FINAL SURVEY DOES NOT HAVE INVERTS ON THE CULVERT PIPE ALSO WHAT NEED TO RUN FROM BACK TO THE FRONT THE FINAL SURVEY SHOWS THE BACK GOIN INTO THE VACANT BEHIND YOUR LOT ----------------------------------------------------------------------------------------------------------------------------- 9/20/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/20/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE MORE ELEVATION ON THE FINAL SURVEY TO DETERMIND THE DRAINAGE OF THE LOT AND SO WE CAN DETERMIND IF THE STORMWATER IS IMPACTING ADJACENT LOT AROUND YOURS. ---------------------------------------------------------------------------------------------------------------------------- THIS IS A REINSPECTION 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW - FINAL INSPECTION 09/08/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
BLD - BUILDING FINAL 09/08/2022 FINAL APPROVED BTAYLOR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A 8-31-22 1. Units A & B engery cals dont match equipment. 2. Master shower unit B does not work. 3. Unit A has no power to back half of duplex. Inspection on unit B is complete unit A needs to be finished. 9-2-22 1. No insulation in duplex.
BLD - BUILDING FINAL 09/02/2022 Disapproved - NO FEE BTAYLOR
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A 8-31-22 1. Units A & B engery cals dont match equipment. 2. Master shower unit B does not work. 3. Unit A has no power to back half of duplex. Inspection on unit B is complete unit A needs to be finished. 9-2-22 1. No insulation in duplex.
BLD - BUILDING FINAL 08/31/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A
BLD - BUILDING FINAL 08/31/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A 8-31-22 1. Units A & B engery cals dont match equipment. 2. Master shower unit B does not work. 3. Unit A has no power to back half of duplex. Inspection on unit B is complete unit A needs to be finished.
BLD - BUILDING FINAL 08/26/2022 Disapproved - NO FEE BTAYLOR
Note: THIS IS A REINSPECTION 8-25-22 1. Not ready 8-26-22 Inspection stopped 1. Open ground on plug in front office. 2. Piping for A/C coming through roof needs to be sealed off. 3. Master shower not working. 4. No hot water. All on unit B Haven't checked unit A
ROW - FINAL INSPECTION 08/26/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
ROW - FINAL APRON (AFTER POUR) 08/26/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
ROW - FINAL APRON (AFTER POUR) 08/25/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
U-CROSS CONNECTION 08/25/2022 APPROVED - AS NOTED JHARDING
Note: THIS IS A REINSPECTION Right meter missing DC Backflow . [duplex] No irrigation, no cross connections.
U -UTILITY RESIDENTIAL FINAL 08/25/2022 FINAL APPROVED JHARDING
ROW - FINAL INSPECTION 08/25/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE YOUR FINAL SURVEY PASSED BEFORE THE ROW FINAL AND AFTER PRE POUR INSPECTION
BLD - BUILDING FINAL 08/25/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: 8-25-22 1. Not ready
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/24/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 8/24/22 CAN NOT IMPACT THE LOT BEHIND YOU NEED TO BRING STORMWATER FROM BACK TO FRONT NEED TO REGRADE LOT TO NOT IMPACT LOT OR IF GRADE IS RIGHT NEED TO HAVE YOUR SURVEYOR COLLECT INFO TO SHOW THAT IT DONT DRAIN TO THE VACANT TO THE BACK THIS IS UP TO YOU TO DETERMINE WHICH ONE TO DO ---------------------------------------------------------------------------------------------------------------------------- 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/23/2022 Disapproved - NO FEE PFLANAGAN
Note: 8/23/22 NEED MORE ELEVATION TO DETERMINE IF YOU IMPACTING LOT BEHIND YOU NEED TO IDENTIFY IF LOT ADJACENT ARE IMPROVED OR VACANT ------------------------------------------------------------------------------------------------------------------------------- THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/15/2022 Disapproved - NO FEE PFLANAGAN
Note: THERE IS NO CULVERT PIPE INVERTS YOU ARE IMPACTING THE ADJACENT LOTS WITH YOUR DRAINAGE NEED TO HAVE FFE ON ALL ADJACENT PROPERTY OR SAY IF IT IS VACANT
ELECTRIC - EARLY POWER 07/27/2022 Disapproved -FEE REQUIRED JMUNSON
Note: THIS IS A REINSPECTION load calcs call for 200a service per unit not 125a that is installed 7/27/22 load calcs call for 200a service per unit not 125a that is installed Panels must be labeled A and B
ELECTRIC - EARLY POWER 07/27/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION load calcs call for 200a service per unit not 125a that is installed 7/27/22 load calcs call for 200a service per unit not 125a that is installed Panels must be labeled A and B 7/27/22 Emailed FPL at 3:40 pm
ELECTRIC - EARLY POWER 07/18/2022 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 07/15/2022 Disapproved - NO FEE RMARTIN
Note: load calcs call for 200a service per unit not 125a that is installed
ELECTRIC - EARLY POWER 07/12/2022 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 07/11/2022 APPROVED - AS NOTED PFLANAGAN
Note: 7/11/22 IT'S THE CONTRACTORS RESPONSIBILTY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE ------------------------------------------------------------------------------------------------------------------------------- 7/8/22 DRIVEWAY IS STILL READY FORM NOT DONE PIPE ELEVATIONS ARE GOOD AT TIME OF INSPECTION 7/8/22 DRIVEWAY IS NOT FORMED ALL THE WAY AT TIME OF INSPECTION 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed.
ROW- PRE-APRON (PRE-POUR) 07/08/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 7/8/22 DRIVEWAY IS NOT FORMED ALL THE WAY AT TIME OF INSPECTION 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed.
ROW- PRE-APRON (PRE-POUR) 07/08/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 7/8/22 DRIVEWAY IS STILL READY FORM NOT DONE PIPE ELEVATIONS ARE GOOD AT TIME OF INSPECTION 7/8/22 DRIVEWAY IS NOT FORMED ALL THE WAY AT TIME OF INSPECTION 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed.
ROW- PRE-APRON (PRE-POUR) 06/27/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 6/27/22 CULVERT PIPE OUT OF TOLERANCE 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed.
ROW- PRE-APRON (PRE-POUR) 06/14/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 6/14/22 THE PIPE IS OUT OF TOLERANCE WITH THE BENCH MARK THAT MATCH THE CENTERLINE OF ROAD THAT IS ON THE SWALE DIAGRAM need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed.
GRAVITY SEWER TEST 06/14/2022 APPROVED MGIBSON
U-CROSS CONNECTION 06/13/2022 Disapproved - NO FEE DHANEY
Note: Right meter missing DC Backflow . [duplex]
ROW- PRE-APRON (PRE-POUR) 06/10/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: need to restablish bench mark need to remove dirt around the culvert pipes 1/2 down MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE I DIDN'T CHECK THE CULVERT PIPE Not ready for inspection. Not formed.
U - SEWER TIE IN 06/10/2022 APPROVED - AS NOTED MGIBSON
Note: THIS IS A REINSPECTION No stub ups, cleanouts, no tie in at street, no evidence the work is complete BOTH GRAVITY SEWER AND U-SEWER TIE IN APPROVED C/M TO SCHEDULE GRAVITY SEWER ON MONDAY
ROW- PRE-APRON (PRE-POUR) 06/09/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: Not ready for inspection. Not formed.
U - SEWER TIE IN 06/07/2022 Disapproved - NO FEE TSTAUFFACHER
Note: No stub ups, cleanouts, no tie in at street, no evidence the work is complete
INSULATION 04/25/2022 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 04/19/2022 APPROVED TSTAUFFACHER
Note: Prior to calling in, verify nail/staple spacing is no greater than 7"--As of 03/23/2022-spacing is greater than 7"
ALL ROUGH 04/18/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION No head pressure on DWV pipes Missing protection plates above electric panels in both units
ALL ROUGH 04/11/2022 Disapproved - NO FEE TSTAUFFACHER
Note: No head pressure on DWV pipes Missing protection plates above electric panels in both units
ALL ROUGH 03/24/2022 CANCELLED BY APPLICANT WEB
FIREWALL FINAL 03/24/2022 APPROVED DCUSHING
FIREWALL DRYWALL NAILING 03/23/2022 APPROVED TSTAUFFACHER
Note: Done with tie down inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/23/2022 APPROVED TSTAUFFACHER
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans 02/01/2022: Right Side- Truss A3-A4-A5-A6-A7 All missing engineering Inspection stopped-Please check house and call back when ready Left side not inspected
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/09/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans 02/01/2022: Right Side- Truss A3-A4-A5-A6-A7 All missing engineering Inspection stopped-Please check house and call back when ready Left side not inspected
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/01/2022 Disapproved - NO FEE TSTAUFFACHER
Note: THIS IS A REINSPECTION OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans 02/01/2022: Right Side- Truss A3-A4-A5-A6-A7 All missing engineering Inspection stopped-Please check house and call back when ready Left side not inspected
ROOF VALLEY & METAL 11/15/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/05/2021 Disapproved - NO FEE TSTAUFFACHER
Note: OKAY to dry in roof. OKAY to start trades Multiple trusses missing engineering, I inspspected the right side unit and found missing bracing. Please walk house again to verify all is installed. Thank you for clean fresh plans
FOUND SURVEY APPROVED (OFFICE) 11/04/2021 APPROVED TDOAK
TIE BEAM / LINTEL 09/14/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Multiple dowel rods missing//job not ready
TIE BEAM / LINTEL 09/07/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Multiple dowel rods missing//job not ready
MONOLITHIC SLAB 05/25/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION 05/20/2021-Below rejection not completed. Footings still washed in and 3" clearance still not met. If possible, see attached photos. THIS IS A REINSPECTION Footings need to be cleaned up from trash, debris and collapsed soil. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). THIS IS A REINSPECTION Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage
MONOLITHIC SLAB 05/20/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: 05/20/2021-Below rejection not completed. Footings still washed in and 3" clearance still not met. If possible, see attached photos. THIS IS A REINSPECTION Footings need to be cleaned up from trash, debris and collapsed soil. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). THIS IS A REINSPECTION Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage
MONOLITHIC SLAB 05/18/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Footings need to be cleaned up from trash, debris and collapsed soil. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). THIS IS A REINSPECTION Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage
MONOLITHIC SLAB 05/13/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Complete set of approved plans not on site No footing steel ground installed Footings collapsed due to wash in reducing minimum bar coverage Termite treat certificate missing// or intent to use boracare
PLUMBING 1ST ROUGH UNDERGROUND 05/07/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 04/22/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 11/15/2022 11/15/2022
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Plans should be named in accordance with their given sheet name and a description – examples are: 1 = Floor Plan *3 = Truss Layout……..Once file name is corrected – re submit.
BADMIN INFORMATION 08/19/2022 08/19/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM sheet says final survey- nothing was uploaded.
ELEC COMPLETE 07/22/2022 07/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 INFORMATION 06/24/2022 06/24/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF
BADMIN INFORMATION 06/24/2022 06/24/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF
ENGIN1 COMPLETE 06/24/2022 06/24/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/24/2022 06/24/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/10/2022 03/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 03/09/2022 03/10/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat comment: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Per the Building Inspectors comments, Engineering is required for Trusses A3,A4,A5,A6 and A7. Only a truss layout was submitted. Please provide the required engineering for the trusses.
BLD HOLD 03/04/2022 03/04/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Per the Building Inspectors comments, Engineering is required for Trusses A3,A4,A5,A6 and A7. Only a truss layout was submitted. Please provide the required engineering for the trusses.
MECH COMPLETE 12/03/2021 12/03/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 11/24/2021 11/29/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calc font is missing information. Please resubmit 2. Provide revised details page of plans showing insulation change
MECH HOLD 11/18/2021 11/18/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide submit revised energy calcs and plan sheets showing changes in insulation and soffit
BLD COMPLETE 11/17/2021 11/18/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Not Appplicable
ENGIN1 COMPLETE 11/04/2021 11/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/04/2021 11/04/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 04/05/2021 06/02/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/01/2021 04/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
SW1 COMPLETE 04/01/2021 04/07/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 04/01/2021 04/05/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 03/23/2021 03/24/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Please revise survey benchmark elevations to read to the nearest hundredth of a foot.
ELEC COMPLETE 03/23/2021 03/23/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 03/23/2021 03/23/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 03/23/2021 03/23/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/23/2021 03/30/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ENGIN1 HOLD 03/23/2021 03/24/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Please revise survey benchmark elevations to read to the nearest hundredth of a foot.
ENGIN1 HOLD 03/05/2021 03/05/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US Please revise survey elevations to read to the nearest hundredth of a foot.
BLD COMPLETE 03/04/2021 03/08/2021
Note: Released By: JPI
CUSVC COMPLETE 03/04/2021 03/11/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 03/04/2021 03/05/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to reference the 2017 NEC 2. Need combo smoke alarm outside of master bedroom. FRC 2020 314.3, 315.1 3. Need to add outlet in garage. NEC 2017 210.52 (G) (1) 4. Submit electric load calcs.
ENGIN1 COMPLETE 03/04/2021 03/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/04/2021 03/09/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/04/2021 03/08/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic. Energy calcs say R21 on roof deck. Revise to match
PLUM COMPLETE 03/04/2021 03/08/2021
Note: Released By: JPI
SW1 HOLD 03/04/2021 03/11/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Culvert must be a Corrigated metal 17 x 13. Site plan shows 15 inch.
ZON HOLD 03/04/2021 03/05/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Please provide the front entry walkway width on site plan/survey
SWALE COMPLETE 03/04/2021 03/11/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/21/2022
CONTRACTOR CHANGE ¤40.00 03/21/2022
PLAN REVIEW - REVISION ¤32.50 02/07/2022
REINSPECTION RESIDENTIAL ¤40.00 09/29/2021
REINSPECTION FEE ¤40.00 09/29/2021
REINSPECTION FEE ¤40.00 09/29/2021
CONTRACTOR CHANGE ¤40.00 09/29/2021
CONTRACTOR CHANGE ¤40.00 09/29/2021
CONTRACTOR CHANGE ¤40.00 09/29/2021
CONTRACTOR CHANGE ¤40.00 09/29/2021
STORM WATER PERMIT FEES ¤80.00 04/21/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 04/21/2021
SEWER CREDIT (¤1,700.00) 04/21/2021
SEWER INSPECTION ¤25.00 04/21/2021
SEWER CAPITAL FACILITY ¤9,329.10 04/21/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 04/21/2021
NEW RESIDENTIAL INSPECTIONS ¤786.00 04/21/2021
SITE PLAN 20 ¤20.00 04/21/2021
SURCHARGE FS 533.721 ¤2.00 04/21/2021
SURCHARGE - FS 468.631 ¤2.00 04/21/2021
CONNECTION FEES ¤2,035.66 04/21/2021
METER - DEPOSIT ¤120.00 04/21/2021
WATER- TURN ON ¤50.00 04/21/2021
ADMIN FEE ¤20.00 04/21/2021
BUILDING DISCOUNT 100% (¤1,850.60) 04/21/2021
ELECTRIC FEE ¤295.80 04/21/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 04/21/2021
IMPACT FEE FIRE ¤734.00 04/21/2021
IMPACT FEE PARKS ¤2,398.24 04/21/2021
IMPACT FEE SCHOOL ¤7,200.00 04/21/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 04/21/2021
MECHANICAL FEE ¤295.80 04/21/2021
WATER -IRRIGATION INSPECTION ¤50.00 04/21/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 04/21/2021
PLAN CHECK FEE ¤157.20 04/21/2021
PLUMBING FEE ¤295.80 04/21/2021
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
SW ENG REINSPECTION 20 ¤20.00
SW ENG REINSPECTION 30 ¤30.00
SW ENG REINSPECTION 30 ¤30.00
SW ENG REINSPECTION 30 ¤30.00
SW ENG REINSPECTION 30 ¤30.00
SW ENG REINSPECTION 30 ¤30.00
SW ENG REINSPECTION 30 ¤30.00
Fees Total Due: ¤320.00 Total Paid: ¤30,071.95