I want to search for...
Permit #2021030370
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01320-0190 |
| CONDITIONED SPACE: 2331 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| GARAGE: 610 sqft |
| Total Square Footage: 3213 sqft |
| Block: 01320 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386) 672-8285 |
| Location Address: 60 EDWARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/19/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: EARHARDT, JOHN & ELLEN |
|
Address 60 EDWARD DR PALM COAST, FL 32164 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤203,999.00 |
| Job Description: single Family Residence |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 12/09/2021 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/09/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/09/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 12/09/2021 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 12/09/2021 | FINAL APPROVED | JHARDING |
| ROW - DRAINAGE | 12/07/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Swale drainage is blocked and needs to stay open throughout the entire construction process. Next inspection 4/26/21 4/26/21 - Pipe was installed across the swale. Next inspection. 5/6/21. 5/6/21 - Temporary culvert in place but blocked by dirt and sand on each end. Storm water will not flow. Next inspection 5/13/21. | |||
| ROW - STORMWATER FINAL | 12/07/2021 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 12/07/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/07/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 12/07/2021 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 11/30/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U - SEWER TIE IN | 09/28/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/28/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 09/28/2021 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/27/2021 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| PEP TANK INSTALLATION REQUEST | 08/02/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster will need to move | |||
| INSULATION | 07/28/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 07/28/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/26/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/07/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/30/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/09/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 05/19/2021 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/17/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 05/17/2021 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 05/06/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Swale drainage is blocked and needs to stay open throughout the entire construction process. Next inspection 4/26/21 4/26/21 - Pipe was installed across the swale. Next inspection. 5/6/21. 5/6/21 - Temporary culvert in place but blocked by dirt and sand on each end. Storm water will not flow. Next inspection 5/13/21. | |||
| ROW - DRAINAGE | 04/26/2021 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Swale drainage is blocked and needs to stay open throughout the entire construction process. Next inspection 4/26/21 4/26/21 - Pipe was installed across the swale. Next inspection. 5/6/21. | |||
| ROW - DRAINAGE | 04/22/2021 | Disapproved - NO FEE | RGROSS |
| Note: Swale drainage is blocked and needs to stay open throughout the entire construction process. Next inspection 4/26/21 | |||
| WATER METER INSTALLATION REQUEST | 04/06/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/19/2021 | 05/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/19/2021 | 03/19/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/05/2021 | 06/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/04/2021 | 03/11/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 03/04/2021 | 03/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 03/04/2021 | 03/09/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/04/2021 | 03/11/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/04/2021 | 03/08/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Horizontal banding along the front must wrap corners at least two feet |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 03/19/2021 |
| WATER- TURN ON | ¤25.00 | 03/19/2021 |
| ADMIN FEE | ¤20.00 | 03/19/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/19/2021 |
| BUILDING DISCOUNT 100% | (¤20.00) | 03/19/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/19/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/19/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/19/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/19/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/19/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/19/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/19/2021 |
| SITE PLAN 20 | ¤20.00 | 03/19/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/19/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/19/2021 |
| SEWER CREDIT | (¤1,466.00) | 03/19/2021 |
| SEWER INSPECTION | ¤25.00 | 03/19/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/19/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/19/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/19/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | |
| Fees | Total Due: ¤60.00 | Total Paid: ¤14,665.43 |