Permit #2021030542

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7031-00580-0070
Block: 00580
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 386-931-5275
Location Address: 28 RIVERDALE LN
Type: DR - DRIVEWAY
Issue Date: 04/15/2021
NOC: Unknown
Applicant name: DANIELLE COPSY
Owner: HEATH RICHARD ALTON SR

Address

28 RIVERDALE LANE

PALM COAST, FL 32164

Lot: 0070
Contracted Stated Job Value: ¤2,500.00
Job Description: Replace concrete driveway
Type: CN

Contractor

J & D COPSY ENTERPRISES, INC
Status Location Address Mailing Address Phone
INACTIVE

2280 WEST COUNTY ROAD

BUNNELL, FL 32110

2006

BUNNELL, FL 32110

386-931-5275

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 10/26/2021 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 05/17/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL INSPECTION 05/17/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- PRE-APRON (PRE-POUR) 04/23/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION COLVERT ELEVATION IS GOOD UPPER DRIVEWAY NEED TO SHAVE DOWN.I LEFTED THE DRIVEWAY PAINTED WITH A PINK SPRAY PAINT NEED TO PUMP WATER OUT OF THE MINOR ENDS. TOO MUCH WATER IN THE POUR AREA AND IN THE PIPE. BUTTER SOFT MUD ALL ALONG THE PIPE'S OUTSIDE EDGE CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. 04/23/2021=AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING
ROW- PRE-APRON (PRE-POUR) 04/20/2021 Disapproved - NO FEE GBERTOLA
Note: COLVERT ELEVATION IS GOOD UPPER DRIVEWAY NEED TO SHAVE DOWN.I LEFTED THE DRIVEWAY PAINTED WITH A PINK SPRAY PAINT NEED TO PUMP WATER OUT OF THE MINOR ENDS. TOO MUCH WATER IN THE POUR AREA AND IN THE PIPE. BUTTER SOFT MUD ALL ALONG THE PIPE'S OUTSIDE EDGE CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/08/2021 03/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
UTL COMPLETE 03/08/2021 03/11/2021
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@CI.PALM-COAST.FL.US
ZON COMPLETE 03/08/2021 03/09/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 03/08/2021 03/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 04/15/2021
BUILDING DISCOUNT 100% (¤20.00) 04/15/2021
SITE PLAN 20 ¤20.00 04/15/2021
SURCHARGE FS 533.721 ¤2.00 04/15/2021
SURCHARGE - FS 468.631 ¤2.00 04/15/2021
STORM WATER PERMIT FEES ¤40.00 04/15/2021
Fees Total Due: ¤0.00 Total Paid: ¤64.00