Permit #2021030701
Permit Details
Status: COED
| Parcel Id: 07-11-31-7015-00030-0100 |
| CONDITIONED SPACE: 1777 sqft |
| GARAGE: 446 sqft |
| OPENED PORCH (WITH ROOF) : 218 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 2521 sqft |
| Block: 00030 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: 386-931-5395 |
| Location Address: 109 CIMMARON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/30/2021 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: FRYE LORETTA M & JAMES A FRYE W&H |
|
Address 11 SHADOWBROOK LANE MORRISTOWN, NJ 07960 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤306,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 11/07/2022 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 11/03/2022 | FINAL APPROVED | AGAETANO |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES 10-26-2022 1. Fireplace not installed. 2. AHU and AC model numbers do not match Calcs. 3. AC breaker not labeled in electrical panel. | |||
| ROW - STORMWATER FINAL | 11/03/2022 | FINAL APPROVED | EMADISON |
| Note: ** 11/03/22 CORRECTIONS MADE BUILDER REMOVING SEDIMENT FROM RIGHT CORNER IN CANAL 10/31/2022 - PREVIOUS INSPECTION NOTES 10/31/22= on the right side by the canal ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL. NEED TO REPAIR THE LOW SPOT BEFORE THE SEAWALL. REPAIR THE WASH OUT ON THE RIGHT SIDE BEFORE THE SEAWALL ...................................................................................................................................................................................................................... 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ****AREAS NEEDING SODE OUTINED IN PINK PAINT**** ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| ROW - STORMWATER FINAL | 10/31/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 10/31/22= on the right side by the canal ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL. NEED TO REPAIR THE LOW SPOT BEFORE THE SEAWALL. REPAIR THE WASH OUT ON THE RIGHT SIDE BEFORE THE SEAWALL ...................................................................................................................................................................................................................... 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ****AREAS NEEDING SODE OUTINED IN PINK PAINT**** ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| ROW - STORMWATER FINAL | 10/27/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/27/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ****AREAS NEEDING SODE OUTINED IN PINK PAINT**** ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| ROW - FINAL APRON (AFTER POUR) | 10/27/2022 | APPROVED | EMADISON |
| Note: ** 10/27/22 CORRECTIONS MADE 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 MITERED END OVER CULVERT ENDS NEEDS SAW EXPANSION CUTS Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| ROW - FINAL APRON (AFTER POUR) | 10/26/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/26/22 MITERED END OVER CULVERT ENDS NEEDS SAW EXPANSION CUTS Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| BLD - BUILDING FINAL | 10/26/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 10-26-2022 1. Fireplace not installed. 2. AHU and AC model numbers do not match Calcs. 3. AC breaker not labeled in electrical panel. | |||
| ROW - STORMWATER FINAL | 10/26/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/26/2022 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/20/2022 | APPROVED - AS NOTED | RGROSS |
| Note: BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear. | |||
| ELECTRIC - EARLY POWER | 10/20/2022 | APPROVED | AGAETANO |
| ROW - DRAINAGE | 10/05/2022 | APPROVED | RGROSS |
| Note: 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/04/22 CORRECTIONS HAVE NOT BEEN MADE AS INDICATED IN PREVIOUS INSPECTION ** CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE PLACED ON THE CONSTRUCTION SITE Builder installed a plywood wall at the sea wall in addition to the existing silt fence that seems to be holding and preventing further erosion. DUE TO THE NEGATIVE IMPACT OF EROSION INTO THE CANAL 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 PROJECT SITE IS STILL IN NEED OF EROSION CONTROL ON RIGHT SIDE LARGE WASHOUTS ON RIGHT SIDE FROM HOUSE GUTTER SYSTEM ERODING MATERIAL INTO CANAL NEEDS TO BE CORRECTED ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/28/22 INSPECTION CANCELLED BY INSPECTOR DUE TO HURRICANE IAN WILL DO THE FOLLOW UP INSPECTION ON 10/03/22 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| ROW - DRAINAGE | 10/04/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/04/22 CORRECTIONS HAVE NOT BEEN MADE AS INDICATED IN PREVIOUS INSPECTION ** FOLLOW UP INSPECTION ON 10/05/22 ** CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE PLACED ON THE CONSTRUCTION SITE DUE TO THE NEGATIVE IMPACT OF EROSION INTO THE CANAL 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 PROJECT SITE IS STILL IN NEED OF EROSION CONTROL ON RIGHT SIDE LARGE WASHOUTS ON RIGHT SIDE FROM HOUSE GUTTER SYSTEM ERODING MATERIAL INTO CANAL NEEDS TO BE CORRECTED ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/28/22 INSPECTION CANCELLED BY INSPECTOR DUE TO HURRICANE IAN WILL DO THE FOLLOW UP INSPECTION ON 10/03/22 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| ROW - DRAINAGE | 10/03/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/03/22 PROJECT SITE IS STILL IN NEED OF EROSION CONTROL ON RIGHT SIDE LARGE WASHOUTS ON RIGHT SIDE FROM HOUSE GUTTER SYSTEM ERODING MATERIAL INTO CANAL NEEDS TO BE CORRECTED ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/28/22 INSPECTION CANCELLED BY INSPECTOR DUE TO HURRICANE IAN WILL DO THE FOLLOW UP INSPECTION ON 10/03/22 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| ROW - DRAINAGE | 09/28/2022 | CANCELLED BY INSPECTOR | EMADISON |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| ROW - DRAINAGE | 09/27/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| ROW - DRAINAGE | 09/26/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| ROW - DRAINAGE | 09/20/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/20/2022 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 08/25/2022 | APPROVED | EMADISON |
| Note: ** 08/25/22 READY FOR PAVERS COMPACTION IS GOOD ** DO NOT LAY PAVERS UNTIL PAVER BASE IS INSPECTED FOR COMPACTION *** | |||
| ROW- PRE-APRON (PRE-POUR) | 08/11/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9271 ** 08/11/22 APRON AND PAVER RESTRAINTS ARE READY TO POUR CREATED A SECOND PRE-APRON PRE POUR ONCE PAVER BASE IS SPREAD AND COMPACTED DO NOT LAY PAVERS UNTIL PAVER BASE IS ** DO NOT LAY PAVERS UNTIL PAVER BASE IS INSPECTED FOR COMPACTION *** ** 08/10/22 PAVER RESTRAINTS ARE READY TO POUR | |||
| ROW- PAVER RESTRAINTS | 08/10/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/10/22 PAVER RESTRAINTS ARE READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 08/10/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/10/22 THERE ARE NO EQUALS ON THE DRIVEWAY WINGS MINIMUM IS 36 INCH EQUAL BOTH SIDE, CHECK FORMBOARDS FOR ALIGNMENT | |||
| U - SEWER TIE IN | 06/02/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION PER MARK GIBSON, NOT TIED INTO THE TAP | |||
| LATH/BRICK/ WATER BARRIER | 05/04/2022 | APPROVED | AGAETANO |
| U - SEWER TIE IN | 05/03/2022 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: PER MARK GIBSON, NOT TIED INTO THE TAP | |||
| INSULATION | 04/14/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 04/11/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION 1. Tub drain not sealed at floor area. 2. Head test not holding water. 3. Front entry door not installed. | |||
| ALL ROUGH | 04/06/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Tub drain not sealed at floor area. 2. Head test not holding water. 3. Front entry door not installed. | |||
| ALL ROUGH | 04/04/2022 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2022 | APPROVED | TBAKER |
| ROOF VALLEY & METAL | 03/03/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Flashing has been attached to exterior wall 2 x blocking. | |||
| ROOF VALLEY & METAL | 03/01/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Flashing has been attached to exterior wall 2 x blocking. | |||
| ELECTRIC-TUG | 03/01/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:17 am | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/28/2022 | APPROVED | AGAETANO |
| Note: Interior walls not framed. Check at all-rough. | |||
| TIE BEAM / LINTEL | 02/03/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Please have approved drawings on site. Mason contractor not complete. | |||
| TIE BEAM / LINTEL | 01/31/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please have approved drawings on site. Mason contractor not complete. | |||
| TIE BEAM / LINTEL | 01/28/2022 | CANCELLED BY APPLICANT | WEB |
| ELEV CERT-FOUNDATION APPROVAL | 01/18/2022 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 01/07/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/21/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/21/2021 | APPROVED | MGIBSON |
| STEM WALL FOUNDATION | 10/21/2021 | APPROVED | DCUSHING |
| FOOTER | 10/05/2021 | APPROVED | LMILLER |
| WATER METER INSTALLATION REQUEST | 04/23/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/01/2022 | 11/01/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 09/19/2022 | 09/19/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM On the elevation certificate: In A8d and A9d please mark the no box for flood openings. | |||
| PLFM | COMPLETE | 09/19/2022 | 09/19/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| ENGIN1 | COMPLETE | 08/11/2022 | 08/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/01/2022 | 08/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/01/2022 | 08/08/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/01/2022 | 08/01/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit electronic copy of completed Right of Way Utilization Agreement for Paver Driveway for staff review before bringing original. | |||
| ZON | COMPLETE | 08/01/2022 | 08/01/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/25/2022 | 03/02/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/18/2022 | 01/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 01/18/2022 | 01/18/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final please include the type of machinery in C2e. Please provide Final prior to receiving CO. | |||
| SWALE | COMPLETE | 01/18/2022 | 08/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/18/2022 | 01/18/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/10/2021 | 09/10/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 03/30/2021 | 03/30/2021 |
| Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide building and final prior to receiving CO. | |||
| PLFM | HOLD | 03/29/2021 | 03/29/2021 |
| Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM In Section D, the surveyor must sign and date on top of the seal in the box as well as in the signature box. | |||
| ZON | COMPLETE | 03/29/2021 | 03/30/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/19/2021 | 03/22/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| PLFM | HOLD | 03/19/2021 | 03/19/2021 |
| Note: Held By: JORDAN MYERS - (386)986-2320 - JMYERS@PALMCOASTGOV.COM In Section B8 and B9 please only list the zone that the structure is in as well as the BFE. In Section D, the surveyor must sign and date on top of the seal in the box as well as in the signature box. | |||
| ZON | HOLD | 03/19/2021 | 03/22/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Circular driveway must have at least a 5ft setback from the arc to the property line | |||
| SW1 | COMPLETE | 03/19/2021 | 03/29/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 03/12/2021 | 03/12/2021 |
| Note: Held By: JORDAN MYERS - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan, the structure will be inside the Special Flood Hazard Area. Elevation certificates will be required at Construction, Foundation, and Final. | |||
| BLD | COMPLETE | 03/10/2021 | 03/15/2021 |
| Note: Released By: JPI | |||
| CUSVC | HOLD | 03/10/2021 | 03/11/2021 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 03/10/2021 | 03/11/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/10/2021 | 03/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 03/10/2021 | 03/12/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/10/2021 | 03/11/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/10/2021 | 03/15/2021 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 03/10/2021 | 03/16/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM nail and disc are not accepted as benchmarks for the city of palm coast | |||
| SWALE | COMPLETE | 03/10/2021 | 06/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/10/2021 | 03/12/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM This backs to a saltwater canal so four additional foundation plantings required along the rear of house At least one tree must be a shade tree Site plan survey house layout doesn't show the rear lanai Site plan survey must show material and width of driveway and front entry walkway Please show the setback from the AC pad to property line. Can not be located in the 5ft utility easement Must have at least 8 shrubs along the front and four along each side |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 11/04/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 11/04/2022 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/04/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/04/2022 |
| REINSPECTION FEE | ¤40.00 | 11/04/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/04/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/04/2022 |
| CONNECTION FEES | ¤1,017.83 | 03/30/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤612.00 | 03/30/2021 |
| SITE PLAN 20 | ¤20.00 | 03/30/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/30/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/30/2021 |
| METER - DEPOSIT | ¤60.00 | 03/30/2021 |
| METER - DEPOSIT | ¤60.00 | 03/30/2021 |
| WATER-METER | ¤441.07 | 03/30/2021 |
| WATER- TURN ON | ¤25.00 | 03/30/2021 |
| WATER- TURN ON | ¤25.00 | 03/30/2021 |
| ADMIN FEE | ¤20.00 | 03/30/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/30/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 03/30/2021 |
| SEWER INSPECTION | ¤25.00 | 03/30/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/30/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/30/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 03/30/2021 |
| MECHANICAL FEE | ¤243.60 | 03/30/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/30/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/30/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 03/30/2021 |
| PLAN CHECK FEE | ¤122.40 | 03/30/2021 |
| PLUMBING FEE | ¤243.60 | 03/30/2021 |
| BUILDING DISCOUNT 100% | (¤1,485.20) | 03/30/2021 |
| ELECTRIC FEE | ¤243.60 | 03/30/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 03/30/2021 |
| IMPACT FEE FIRE | ¤367.00 | 03/30/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 03/30/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/30/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,121.50 |