Permit #2021030701

Permit Details

Status: COED

Parcel Id: 07-11-31-7015-00030-0100
CONDITIONED SPACE: 1777 sqft
GARAGE: 446 sqft
OPENED PORCH (WITH ROOF) : 218 sqft
OPENED PORCH (WITH ROOF) : 80 sqft
Total Square Footage: 2521 sqft
Block: 00030
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: 386-931-5395
Location Address: 109 CIMMARON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/30/2021
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: FRYE LORETTA M & JAMES A FRYE W&H

Address

11 SHADOWBROOK LANE

MORRISTOWN, NJ 07960

Lot: 0100
Contracted Stated Job Value: ¤306,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
DILLON CARRERAS
Status Location Address State License Number
ACTIVE

3504 LUNDY ROAD

PALATKA, FL 32177

EC13010133 (Exp: 08/31/2026)

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 11/07/2022 APPROVED DHANEY
BLD - BUILDING FINAL 11/03/2022 FINAL APPROVED AGAETANO
Note: 10/26/2022 - PREVIOUS INSPECTION NOTES 10-26-2022 1. Fireplace not installed. 2. AHU and AC model numbers do not match Calcs. 3. AC breaker not labeled in electrical panel.
ROW - STORMWATER FINAL 11/03/2022 FINAL APPROVED EMADISON
Note: ** 11/03/22 CORRECTIONS MADE BUILDER REMOVING SEDIMENT FROM RIGHT CORNER IN CANAL 10/31/2022 - PREVIOUS INSPECTION NOTES 10/31/22= on the right side by the canal ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL. NEED TO REPAIR THE LOW SPOT BEFORE THE SEAWALL. REPAIR THE WASH OUT ON THE RIGHT SIDE BEFORE THE SEAWALL ...................................................................................................................................................................................................................... 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ****AREAS NEEDING SODE OUTINED IN PINK PAINT**** ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
ROW - STORMWATER FINAL 10/31/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/31/22= on the right side by the canal ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL. NEED TO REPAIR THE LOW SPOT BEFORE THE SEAWALL. REPAIR THE WASH OUT ON THE RIGHT SIDE BEFORE THE SEAWALL ...................................................................................................................................................................................................................... 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ****AREAS NEEDING SODE OUTINED IN PINK PAINT**** ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
ROW - STORMWATER FINAL 10/27/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/27/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ****AREAS NEEDING SODE OUTINED IN PINK PAINT**** ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
ROW - FINAL APRON (AFTER POUR) 10/27/2022 APPROVED EMADISON
Note: ** 10/27/22 CORRECTIONS MADE 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 MITERED END OVER CULVERT ENDS NEEDS SAW EXPANSION CUTS Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
ROW - FINAL APRON (AFTER POUR) 10/26/2022 Disapproved - NO FEE EMADISON
Note: ** 10/26/22 MITERED END OVER CULVERT ENDS NEEDS SAW EXPANSION CUTS Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
BLD - BUILDING FINAL 10/26/2022 Disapproved - NO FEE AGAETANO
Note: 10-26-2022 1. Fireplace not installed. 2. AHU and AC model numbers do not match Calcs. 3. AC breaker not labeled in electrical panel.
ROW - STORMWATER FINAL 10/26/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/26/22 BUILDER NEEDS TO REVIEW ALL NOTES LEFT FROM FIELD SURVEY AND MAKE ALL CORRECTIONS AS NOTED. ** AREAS THAT REQUIRE STRAW ALSO REQUIRE SEED WHICH WAS NOT PUT DOWN ** SWALE RIGHT SIDE REPAIR AND ENTRY INTO VACANT REQUIRE SOD WHICH IS TO EXTEND 15 FEET FROM INTO RIGHT OF WAY. AS WELL AS SOD RIGHT REAR ** ALL SEDIMENT NEEDS TO BE REMOVED FROM CANAL ** LEFT SIDE ALONG ENTIRE PROPERTY LINE NEEDS TO BE SODDED TO MATCH AS WELL AS ALL BARE AREAS OF EARTH REQUIRE SOD. ALSO BARE SPOT AT LEFT DRIVEWAY CORNER NEEDS SOD ** ALL LANDSCAPING NEEEDS TO BE REMOVED AS INDICATED 5 FEET BACK FROM SEAWALL AND AREA IS TO BE SODDED Inspector Notes from Inspection 9465 BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
U -UTILITY RESIDENTIAL FINAL 10/26/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 10/20/2022 APPROVED - AS NOTED RGROSS
Note: BEFORE THE FINAL STORMWATER CAN BE APPROVED, THE FOLLOWING MUST BE DONE: 1) Remove sediment washout out of the canal all the way across the seawall, especially on the right rear vacant. 2) Repair the large washout on the right rear. 3) Move all landscaping back from the seawall and place sod to 5 ft back 4) Remove all the trash and Repair the swale on the right side vacant where construction vehicles were parked. Must be sodded, not seed and straw 5) Place sod on all bare earth areas on the vacant in the right rear.
ELECTRIC - EARLY POWER 10/20/2022 APPROVED AGAETANO
ROW - DRAINAGE 10/05/2022 APPROVED RGROSS
Note: 10/4/2022 - PREVIOUS INSPECTION NOTES ** 10/04/22 CORRECTIONS HAVE NOT BEEN MADE AS INDICATED IN PREVIOUS INSPECTION ** CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE PLACED ON THE CONSTRUCTION SITE Builder installed a plywood wall at the sea wall in addition to the existing silt fence that seems to be holding and preventing further erosion. DUE TO THE NEGATIVE IMPACT OF EROSION INTO THE CANAL 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 PROJECT SITE IS STILL IN NEED OF EROSION CONTROL ON RIGHT SIDE LARGE WASHOUTS ON RIGHT SIDE FROM HOUSE GUTTER SYSTEM ERODING MATERIAL INTO CANAL NEEDS TO BE CORRECTED ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/28/22 INSPECTION CANCELLED BY INSPECTOR DUE TO HURRICANE IAN WILL DO THE FOLLOW UP INSPECTION ON 10/03/22 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
ROW - DRAINAGE 10/04/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/04/22 CORRECTIONS HAVE NOT BEEN MADE AS INDICATED IN PREVIOUS INSPECTION ** FOLLOW UP INSPECTION ON 10/05/22 ** CORRECTIONS ARE NOT MADE A STOP WORK ORDER WILL BE PLACED ON THE CONSTRUCTION SITE DUE TO THE NEGATIVE IMPACT OF EROSION INTO THE CANAL 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 PROJECT SITE IS STILL IN NEED OF EROSION CONTROL ON RIGHT SIDE LARGE WASHOUTS ON RIGHT SIDE FROM HOUSE GUTTER SYSTEM ERODING MATERIAL INTO CANAL NEEDS TO BE CORRECTED ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/28/22 INSPECTION CANCELLED BY INSPECTOR DUE TO HURRICANE IAN WILL DO THE FOLLOW UP INSPECTION ON 10/03/22 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
ROW - DRAINAGE 10/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/03/22 PROJECT SITE IS STILL IN NEED OF EROSION CONTROL ON RIGHT SIDE LARGE WASHOUTS ON RIGHT SIDE FROM HOUSE GUTTER SYSTEM ERODING MATERIAL INTO CANAL NEEDS TO BE CORRECTED ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/28/22 INSPECTION CANCELLED BY INSPECTOR DUE TO HURRICANE IAN WILL DO THE FOLLOW UP INSPECTION ON 10/03/22 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
ROW - DRAINAGE 09/28/2022 CANCELLED BY INSPECTOR EMADISON
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
ROW - DRAINAGE 09/27/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** THIS INSPECTOR HAS ATTEMPTED TO CALL BUILDER WITH NO SUCCESS AS THE NUMBER LISTED ON THE PERMIT IS UNABLE TO CONNECT A CALL. ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION WITH THE IMPENDING HURRICANE IAN SCHEDULED TO IMPACT OUR AREA YOUR SITE WILL HAVE A NEGATIVE IMPACT OF THE CANAL IF EROSION CONTROL MEASURES ARE NOT PUT IN PLACE. ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/28/22 9/26/2022 - PREVIOUS INSPECTION NOTES ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
ROW - DRAINAGE 09/26/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** NO CORRECTION HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** 09/26/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/27/22 9/20/2022 - PREVIOUS INSPECTION NOTES * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
ROW - DRAINAGE 09/20/2022 Disapproved -FEE REQUIRED EMADISON
Note: * 09/20/22 THERE ARE SEVERAL WASHOUTS FROM THIS PROPERTY AS WELL AS FROM THE RIGHT SIDE ADJACENT VACANT THAT IS BEING USED THROUGHOUT THE CONSTRUCTION FOR ACCESS TO YOUR PROJECT SITE. MATERIAL HAS ERODED INTO THE CANAL WHICH WILL NEED TO BE REMOVED PRIOR TO THE ROW FINAL, BUT EROSION CONTROL NEEDS TO BE ESTABLISHED IMMEDIATELY TO PREVENT FURTHER EROSION HAVING A NEGATIVE IMPACT ON THE CANAL. ** LEFT SIDE EROSION IS ALSO OCURRING WASHING SEDIMENT INTO THE CANAL THIS ALSO NEEDS TO HAVE EROSION CONTROL PUT IN PLACE IMMEDIATELY TO PREVENT FURTHER EROSION AND A NEGATIVE IMPACT INTO THE CANAL. ** THE MATERIAL THAT HAS ERODED INTO THE CANAL WILL NEED TO BE REMOVED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/26/22
FINAL SURVEY (OFFICE USE ONLY) 09/20/2022 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 08/25/2022 APPROVED EMADISON
Note: ** 08/25/22 READY FOR PAVERS COMPACTION IS GOOD ** DO NOT LAY PAVERS UNTIL PAVER BASE IS INSPECTED FOR COMPACTION ***
ROW- PRE-APRON (PRE-POUR) 08/11/2022 APPROVED EMADISON
Note: Inspector Notes from Inspection 9271 ** 08/11/22 APRON AND PAVER RESTRAINTS ARE READY TO POUR CREATED A SECOND PRE-APRON PRE POUR ONCE PAVER BASE IS SPREAD AND COMPACTED DO NOT LAY PAVERS UNTIL PAVER BASE IS ** DO NOT LAY PAVERS UNTIL PAVER BASE IS INSPECTED FOR COMPACTION *** ** 08/10/22 PAVER RESTRAINTS ARE READY TO POUR
ROW- PAVER RESTRAINTS 08/10/2022 APPROVED - AS NOTED EMADISON
Note: ** 08/10/22 PAVER RESTRAINTS ARE READY TO POUR
ROW- PRE-APRON (PRE-POUR) 08/10/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/10/22 THERE ARE NO EQUALS ON THE DRIVEWAY WINGS MINIMUM IS 36 INCH EQUAL BOTH SIDE, CHECK FORMBOARDS FOR ALIGNMENT
U - SEWER TIE IN 06/02/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION PER MARK GIBSON, NOT TIED INTO THE TAP
LATH/BRICK/ WATER BARRIER 05/04/2022 APPROVED AGAETANO
U - SEWER TIE IN 05/03/2022 Disapproved -FEE REQUIRED RMARTIN
Note: PER MARK GIBSON, NOT TIED INTO THE TAP
INSULATION 04/14/2022 APPROVED AGAETANO
ALL ROUGH 04/11/2022 APPROVED RMARTIN
Note: THIS IS A REINSPECTION 1. Tub drain not sealed at floor area. 2. Head test not holding water. 3. Front entry door not installed.
ALL ROUGH 04/06/2022 Disapproved - NO FEE AGAETANO
Note: 1. Tub drain not sealed at floor area. 2. Head test not holding water. 3. Front entry door not installed.
ALL ROUGH 04/04/2022 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 04/01/2022 APPROVED TBAKER
ROOF VALLEY & METAL 03/03/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Flashing has been attached to exterior wall 2 x blocking.
ROOF VALLEY & METAL 03/01/2022 Disapproved - NO FEE AGAETANO
Note: Flashing has been attached to exterior wall 2 x blocking.
ELECTRIC-TUG 03/01/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:17 am
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/28/2022 APPROVED AGAETANO
Note: Interior walls not framed. Check at all-rough.
TIE BEAM / LINTEL 02/03/2022 APPROVED RMARTIN
Note: THIS IS A REINSPECTION Please have approved drawings on site. Mason contractor not complete.
TIE BEAM / LINTEL 01/31/2022 Disapproved - NO FEE AGAETANO
Note: Please have approved drawings on site. Mason contractor not complete.
TIE BEAM / LINTEL 01/28/2022 CANCELLED BY APPLICANT WEB
ELEV CERT-FOUNDATION APPROVAL 01/18/2022 APPROVED JMYERS
MONOLITHIC SLAB 01/07/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 12/21/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 12/21/2021 APPROVED MGIBSON
STEM WALL FOUNDATION 10/21/2021 APPROVED DCUSHING
FOOTER 10/05/2021 APPROVED LMILLER
WATER METER INSTALLATION REQUEST 04/23/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 11/01/2022 11/01/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLFM HOLD 09/19/2022 09/19/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM On the elevation certificate: In A8d and A9d please mark the no box for flood openings.
PLFM COMPLETE 09/19/2022 09/19/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
ENGIN1 COMPLETE 08/11/2022 08/12/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/01/2022 08/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/01/2022 08/08/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 08/01/2022 08/01/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit electronic copy of completed Right of Way Utilization Agreement for Paver Driveway for staff review before bringing original.
ZON COMPLETE 08/01/2022 08/01/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 05/11/2022 05/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/25/2022 03/02/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/18/2022 01/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 01/18/2022 01/18/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final please include the type of machinery in C2e. Please provide Final prior to receiving CO.
SWALE COMPLETE 01/18/2022 08/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/18/2022 01/18/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 09/10/2021 09/10/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
PLFM COMPLETE 03/30/2021 03/30/2021
Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide building and final prior to receiving CO.
PLFM HOLD 03/29/2021 03/29/2021
Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM In Section D, the surveyor must sign and date on top of the seal in the box as well as in the signature box.
ZON COMPLETE 03/29/2021 03/30/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
CUSVC COMPLETE 03/19/2021 03/22/2021
Note: Released By: HALEIGH HAND - -
PLFM HOLD 03/19/2021 03/19/2021
Note: Held By: JORDAN MYERS - (386)986-2320 - JMYERS@PALMCOASTGOV.COM In Section B8 and B9 please only list the zone that the structure is in as well as the BFE. In Section D, the surveyor must sign and date on top of the seal in the box as well as in the signature box.
ZON HOLD 03/19/2021 03/22/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Circular driveway must have at least a 5ft setback from the arc to the property line
SW1 COMPLETE 03/19/2021 03/29/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
PLFM HOLD 03/12/2021 03/12/2021
Note: Held By: JORDAN MYERS - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan, the structure will be inside the Special Flood Hazard Area. Elevation certificates will be required at Construction, Foundation, and Final.
BLD COMPLETE 03/10/2021 03/15/2021
Note: Released By: JPI
CUSVC HOLD 03/10/2021 03/11/2021
Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number.
ELEC COMPLETE 03/10/2021 03/11/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/10/2021 03/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/10/2021 03/12/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/10/2021 03/11/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/10/2021 03/15/2021
Note: Released By: JPI
SW1 HOLD 03/10/2021 03/16/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM nail and disc are not accepted as benchmarks for the city of palm coast
SWALE COMPLETE 03/10/2021 06/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 03/10/2021 03/12/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM This backs to a saltwater canal so four additional foundation plantings required along the rear of house At least one tree must be a shade tree Site plan survey house layout doesn't show the rear lanai Site plan survey must show material and width of driveway and front entry walkway Please show the setback from the AC pad to property line. Can not be located in the 5ft utility easement Must have at least 8 shrubs along the front and four along each side

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 11/04/2022
CONTRACTOR CHANGE ¤40.00 11/04/2022
RECORDING FEE REIMBURSE DOC ¤44.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG - INSPECTION 20 ¤20.00 11/04/2022
SW ENG REINSPECTION 20 ¤20.00 11/04/2022
SW ENG REINSPECTION 20 ¤20.00 11/04/2022
SW ENG REINSPECTION 20 ¤20.00 11/04/2022
SW ENG REINSPECTION 30 ¤30.00 11/04/2022
REINSPECTION FEE ¤40.00 11/04/2022
PLAN REVIEW - REVISION ¤32.50 11/04/2022
PLAN REVIEW - REVISION ¤32.50 11/04/2022
CONNECTION FEES ¤1,017.83 03/30/2021
NEW RESIDENTIAL INSPECTIONS ¤612.00 03/30/2021
SITE PLAN 20 ¤20.00 03/30/2021
SURCHARGE FS 533.721 ¤2.00 03/30/2021
SURCHARGE - FS 468.631 ¤2.00 03/30/2021
METER - DEPOSIT ¤60.00 03/30/2021
METER - DEPOSIT ¤60.00 03/30/2021
WATER-METER ¤441.07 03/30/2021
WATER- TURN ON ¤25.00 03/30/2021
WATER- TURN ON ¤25.00 03/30/2021
ADMIN FEE ¤20.00 03/30/2021
STORM WATER PERMIT FEES ¤80.00 03/30/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 03/30/2021
SEWER INSPECTION ¤25.00 03/30/2021
SEWER CAPITAL FACILITY ¤4,664.55 03/30/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 03/30/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 03/30/2021
MECHANICAL FEE ¤243.60 03/30/2021
WATER -IRRIGATION INSPECTION ¤25.00 03/30/2021
WATER -IRRIGATION INSPECTION ¤25.00 03/30/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 03/30/2021
PLAN CHECK FEE ¤122.40 03/30/2021
PLUMBING FEE ¤243.60 03/30/2021
BUILDING DISCOUNT 100% (¤1,485.20) 03/30/2021
ELECTRIC FEE ¤243.60 03/30/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 03/30/2021
IMPACT FEE FIRE ¤367.00 03/30/2021
IMPACT FEE PARKS ¤1,199.12 03/30/2021
IMPACT FEE SCHOOL ¤3,600.00 03/30/2021
Fees Total Due: ¤0.00 Total Paid: ¤17,121.50