I want to search for...

Permit #2021030703

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00040-0740
CONDITIONED SPACE: 2066 sqft
GARAGE: 534 sqft
OPENED PORCH (WITH ROOF) : 284 sqft
OPENED PORCH (WITH ROOF) : 73 sqft
Total Square Footage: 2957 sqft
Block: 00040
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 386-931-5395
Location Address: 17 CONLEY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/30/2021
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: FOWLER DENNIS & PEPPI SARA H&W

Address

151 RIVER LANE SW

ROME, GA 30165

Lot: 0740
Contracted Stated Job Value: ¤370,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/13/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 1. Master bath outlet loose. 2. Master hallway outlet loose. 3. Master bedroom outlets loose, check all. 4. Living room outlets loose, check all. 5. Bedrooms outlets loose. 6. Dishwasher drain not connected to underside of sink. 7. Laundry outlets loose. 8. Laundry outlet not working. 9. Garage outlets loose. 10. AHU and outdoor units energy calculatons do not match. 11. Attic steps unsafe to climb. Need to inspect insulation. 05-12-2022 - Energy calculations do not match.
BLD - BUILDING FINAL 05/13/2022 FINAL APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Master bath outlet loose. 2. Master hallway outlet loose. 3. Master bedroom outlets loose, check all. 4. Living room outlets loose, check all. 5. Bedrooms outlets loose. VIRTUAL INSPECTION FOR ENERGY CALCS 6. Dishwasher drain not connected to underside of sink. 7. Laundry outlets loose. 8. Laundry outlet not working. 9. Garage outlets loose. 10. AHU and outdoor units energy calculatons do not match. 11. Attic steps unsafe to climb. Need to inspect insulation. 05-12-2022 - Energy calculations do not match.
ROW - STORMWATER FINAL 05/13/2022 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION This inspection was rescheduled by Inspector who originally approved it instead of the Field Survey 5/4/22 - Remove the dumpster and the Port o potty from the ROW and make repairs if needed. *Pick up all trash and misc construction materials along the right side property line in the vacant. 5/13/22 - On site with CM. Seed and straw for the right side rear vacant is scheduled to be placed today. * 5/11/22 REPAIR AND SOD WASHOUT ON LEFT SIDE REAR CORNER OF HOUSE AT PRPERTY LINE * SOD BARE AREAS ON RIGHT SIDE PROPERTY LINE TO PREVENT WASHOUTS AND EROSION * SOD SWALE AREA IN FRONT OF VACANT WHERE DUMPSTER WAQS AND MATCH EXISTING GRADE
BLD - BUILDING FINAL 05/11/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 1. Master bath outlet loose. 2. Master hallway outlet loose. 3. Master bedroom outlets loose, check all. 4. Living room outlets loose, check all. 5. Bedrooms outlets loose. 6. Dishwasher drain not connected to underside of sink. 7. Laundry outlets loose. 8. Laundry outlet not working. 9. Garage outlets loose. 10. AHU and outdoor units energy calculatons do not match. 11. Attic steps unsafe to climb. Need to inspect insulation.
ROW - STORMWATER FINAL 05/11/2022 Disapproved -FEE REQUIRED EMADISON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION This inspection was rescheduled by Inspector who originally approved it instead of the Field Survey 5/4/22 - Remove the dumpster and the Port o potty from the ROW and make repairs if needed. *Pick up all trash and misc construction materials along the right side property line in the vacant. * 5/11/22 REPAIR AND SOD WASHOUT ON LEFT SIDE REAR CORNER OF HOUSE AT PRPERTY LINE * SOD BARE AREAS ON RIGHT SIDE PROPERTY LINE TO PREVENT WASHOUTS AND EROSION * SOD SWALE AREA IN FRONT OF VACANT WHERE DUMPSTER WAQS AND MATCH EXISTING GRADE
ROW - STORMWATER FINAL 05/04/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION This inspection was rescheduled by Inspector who originally approved it instead of the Field Survey 5/4/22 - Remove the dumpster and the Port o potty from the ROW and make repairs if needed. *Pick up all trash and misc construction materials along the right side property line in the vacant.
U -UTILITY RESIDENTIAL FINAL 05/04/2022 FINAL APPROVED DHANEY
U-CROSS CONNECTION 05/04/2022 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 05/03/2022 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 05/03/2022 APPROVED RGROSS
ROW - STORMWATER FINAL 05/03/2022 APPROVED RGROSS
ROW - STORMWATER FINAL 05/03/2022 CANCELLED BY APPLICANT RGROSS
Note: This inspection was rescheduled by Inspector who originally approved it instead of the Field Survey
FINAL SURVEY (OFFICE USE ONLY) 05/03/2022 APPROVED RGROSS
ELECTRIC - EARLY POWER 05/03/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9:30 AM
ELECTRIC - EARLY POWER 05/02/2022 Disapproved -FEE REQUIRED AGAETANO
Note: Power cannot be on prior to Early Power inspection.
ROW- PRE-APRON (PRE-POUR) 04/14/2022 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
U - SEWER TIE IN 01/26/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 01/26/2022 APPROVED - AS NOTED MGIBSON
Note: PLUMBING CONTRACTOR DAMAGED THE UNDERGROUND ELETRIC SERVICE TO HOME, SPOKE WITH RONNIE FROM WATERSIDE HOME AND MADE HIM AWARE OF IT
INSULATION 12/07/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION attic to comply with these provisions or provide ignition barrier, R316.5.3 12-07-21... notes above resolved
INSULATION 12/02/2021 Disapproved - NO FEE LMILLER
Note: attic to comply with these provisions or provide ignition barrier, R316.5.3
LATH/BRICK/ WATER BARRIER 11/30/2021 APPROVED RMARTIN
ALL ROUGH 11/24/2021 APPROVED DCUSHING
WALL SHEATHING 11/19/2021 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2021 APPROVED DCUSHING
ROOF VALLEY & METAL 11/19/2021 APPROVED DCUSHING
ELEV CERT-FOUNDATION APPROVAL 11/18/2021 APPROVED JMYERS
ELECTRIC-TUG 11/10/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 12:35
TIE BEAM / LINTEL 10/11/2021 APPROVED DCUSHING
FOUND SURVEY APPROVED (OFFICE) 09/29/2021 APPROVED TBAKER
MONOLITHIC SLAB 09/13/2021 APPROVED DCUSHING
PLUMBING 1ST ROUGH UNDERGROUND 09/07/2021 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 09/03/2021 APPROVED JGIBSON
STEM WALL FOUNDATION 08/16/2021 APPROVED JPI
Note: THIS IS A REINSPECTION Vertical reenforcing bars not tied to dowels extending out of footing. Two ties requied. Not sure how they are going to get two ties on vertical bars. Grout Cleanouts required if grout pour height exceeds 64 inches per R606.3.5.2.
STEM WALL FOUNDATION 08/13/2021 Disapproved -FEE REQUIRED PBUCKLEY
Note: Vertical reenforcing bars not tied to dowels extending out of footing. Two ties requied. Not sure how they are going to get two ties on vertical bars. Grout Cleanouts required if grout pour height exceeds 64 inches per R606.3.5.2.
FOOTER 07/30/2021 APPROVED - AS NOTED RMARTIN
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION need approved plans on site for inspection 7-26-21... NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION Approved Documents need to be on site for inspection 107.3,1. 7/30/21 marked on plan footer
FOOTER 07/29/2021 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION need approved plans on site for inspection 7-26-21... NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION Approved Documents need to be on site for inspection 107.3,1.
FOOTER 07/26/2021 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need approved plans on site for inspection 7-26-21... NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION Approved Documents need to be on site for inspection 107.3,1.
FOOTER 07/22/2021 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION need approved plans on site for inspection
FOOTER 07/21/2021 CANCELLED BY APPLICANT WMILLER
WATER METER INSTALLATION REQUEST 04/28/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 05/13/2022 05/13/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 05/11/2022 05/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
PLFM HOLD 05/02/2022 05/02/2022
Note: The Final elevation certificate has been approved.
PLFM COMPLETE 11/18/2021 11/18/2021
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
PLFM HOLD 11/17/2021 11/17/2021
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The elevation certificate submitted was the same as the previous construction elevation certificate. At this time the Foundation elevation certificate needs to be submitted.
PLFM HOLD 11/17/2021 11/17/2021
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM In Section A8d and A9d the No box needs to be checked if there are no flood openings. C2a shows the house at 10.0' and the foundation survey at 10.05' please revise Elevation Certificate to 10.1'. C2d shows the elevation of the garage at 9.7' and the foundation survey shows 9.56' please revise the Elevation Certificate to state 9.6'. Section D Comments note that elevations are based on a proposed site plan. They should be based on the foundation survey. The type of machinery in C2e needs to be listed as well.
ENGIN1 COMPLETE 09/29/2021 09/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/29/2021 09/29/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/23/2021 07/28/2021
Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 06/29/2021 07/08/2021
Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM SCOPE: Modification Added Steam Wall
ZON HOLD 05/25/2021 05/25/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Unable to verify garage color HGSW 1443 is an earth tone. The number does not seem to be valid on the website.
ZON COMPLETE 05/25/2021 05/25/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 03/30/2021 03/30/2021
Note: Released By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide building and final prior to receiving CO.
PLFM HOLD 03/29/2021 03/29/2021
Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM In Section D, the surveyor must sign and date on top of the seal in the box as well as in the signature box.
ZON COMPLETE 03/29/2021 03/29/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 03/19/2021 03/19/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 03/19/2021 03/22/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Site plan and landscape plan show house notched for the AC unit. Plans show a solid wall which would make the AC pad encroach in the 5ft easement. Section number incorrect on survey/site plan
SW1 COMPLETE 03/19/2021 03/29/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
PLFM HOLD 03/19/2021 03/19/2021
Note: Held By: JORDAN MYERS - (386)986-2320 - JMYERS@PALMCOASTGOV.COM In Section A8d and A9d the No box needs to be checked if there are no flood openings. In Section B8 and B9 please only list the zone that the structure is in as well as the BFE. In Section D, the surveyor must provide a seal and sign and date on top of the seal in the box as well as in the signature box.
BLD COMPLETE 03/10/2021 03/15/2021
Note: Released By: JPI
CUSVC COMPLETE 03/10/2021 03/11/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 03/10/2021 03/11/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/10/2021 03/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/10/2021 03/12/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/10/2021 03/11/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match the site plan
PLUM COMPLETE 03/10/2021 03/15/2021
Note: Released By: JPI
SW1 HOLD 03/10/2021 03/16/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM Survey Data: Site Plan must include survey data demonstrating existing conditions to the following criteria: . An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D)
ZON HOLD 03/10/2021 03/12/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM This backs to a saltwater canal so four additional foundation plantings required along the rear of house Site plan survey house layout doesn't show the rear lanai Site plan survey must show material and width of driveway and front entry walkway Please show the setback from the AC pad to property line. Can not be located in the 5ft utility easement Must have at least 8 shrubs along the front and four along each side Driveway must lead to a garage. Site plan shows driveway going to front of house and not the garage House layout on plans do not match landscape and site plan survey Section number incorrect on survey
SWALE COMPLETE 03/10/2021 06/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/13/2022
PLAN REVIEW - REVISION ¤32.50 05/13/2022
REINSPECTION RESIDENTIAL ¤40.00 05/13/2022
REINSPECTION RESIDENTIAL ¤40.00 05/13/2022
REINSPECTION RESIDENTIAL ¤40.00 05/13/2022
REINSPECTION RESIDENTIAL ¤40.00 05/13/2022
REINSPECTION FEE ¤40.00 05/13/2022
REINSPECTION FEE ¤40.00 05/13/2022
SW ENG REINSPECTION 20 ¤20.00 05/13/2022
SW ENG REINSPECTION 20 ¤20.00 05/13/2022
STORM WATER PERMIT FEES ¤80.00 03/30/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 03/30/2021
SEWER CREDIT (¤1,147.00) 03/30/2021
SEWER INSPECTION ¤25.00 03/30/2021
SEWER CAPITAL FACILITY ¤4,664.55 03/30/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 03/30/2021
METER - DEPOSIT ¤60.00 03/30/2021
WATER- TURN ON ¤25.00 03/30/2021
ADMIN FEE ¤20.00 03/30/2021
NEW RESIDENTIAL INSPECTIONS ¤740.00 03/30/2021
SITE PLAN 20 ¤20.00 03/30/2021
SURCHARGE FS 533.721 ¤2.00 03/30/2021
SURCHARGE - FS 468.631 ¤2.00 03/30/2021
CONNECTION FEES ¤1,017.83 03/30/2021
BUILDING DISCOUNT 100% (¤1,754.00) 03/30/2021
ELECTRIC FEE ¤282.00 03/30/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 03/30/2021
IMPACT FEE FIRE ¤367.00 03/30/2021
IMPACT FEE PARKS ¤1,199.12 03/30/2021
IMPACT FEE SCHOOL ¤3,600.00 03/30/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 03/30/2021
MECHANICAL FEE ¤282.00 03/30/2021
WATER -IRRIGATION INSPECTION ¤25.00 03/30/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 03/30/2021
PLAN CHECK FEE ¤148.00 03/30/2021
PLUMBING FEE ¤282.00 03/30/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,336.93