I want to search for...

Permit #2021030707

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00390-0020
CONDITIONED SPACE: 2117 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
GARAGE: 431 sqft
Total Square Footage: 2772 sqft
Block: 00390
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: (386)437-1508
Location Address: 121 PRITCHARD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/09/2021
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X, LLC

Address

29 COLUMBUS CT

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤190,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MICHAEL MATTHEW SANKOSWSKI
Status Location Address State License Number Phone
ACTIVE

3 SEAMANSHIP TRAIL

PALM COAST, FL 32164

CAC1818816 (Exp: 08/31/2026) 386-316-4401

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/16/2022 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 03/15/2022 Disapproved -FEE REQUIRED KSANDOE
Note: Locking caps on AC not locked Installed climate control equipment does not match energy calcs. No insulation in attic spaces. Stopped inspection
BLD - BUILDING FINAL 03/14/2022 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 03/14/2022 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 03/10/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 03/10/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 03/10/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 03/10/2022 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 12/17/2021 APPROVED - AS NOTED GBERTOLA
Note: 12/17/2021= correction were made AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. 12/16/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT SIDE END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN –
ROW- PRE-APRON (PRE-POUR) 12/16/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: 12/16/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT SIDE END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN –
ROW- PRE-APRON (PRE-POUR) 12/15/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT SIDE END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN –
U-CROSS CONNECTION 12/10/2021 APPROVED - AS NOTED JHARDING
Note: No irrigation,no cross connections.
U - SEWER TIE IN 12/10/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 12/10/2021 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 12/10/2021 APPROVED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Workers still installing lath 10/14/21 Foam has been used at the window jambs. The detail for the window jamb sills does not show foam. submitt a revision to the building departmart for this change. Or remove the foam and follow the detail for exterio window jambs on page A-6 of the prints 10/15/21 - Submit revision for above noted change.
ELECTRIC - EARLY POWER 12/03/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:52 am
LATH/BRICK/ WATER BARRIER 10/15/2021 Disapproved - NO FEE KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Workers still installing lath 10/14/21 Foam has been used at the window jambs. The detail for the window jamb sills does not show foam. submitt a revision to the building departmart for this change. Or remove the foam and follow the detail for exterio window jambs on page A-6 of the prints 10/15/21 - Submit revision for above noted change.
LATH/BRICK/ WATER BARRIER 10/14/2021 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION Workers still installing lath 10/14/21 Foam has been used at the window jambs. The detail for the window jamb sills does not show foam. submitt a revision to the building departmart for this change. Or remove the foam and follow the detail for exterio window jambs on page A-6 of the prints
LATH/BRICK/ WATER BARRIER 10/13/2021 Disapproved - NO FEE KSANDOE
Note: Workers still installing lath
INSULATION 10/11/2021 APPROVED KSANDOE
ALL ROUGH 09/24/2021 APPROVED - AS NOTED KSANDOE
Note: Dryer vent need sealed at the box.
ALL ROUGH 09/14/2021 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 08/26/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION synthetic underlayment needs to be nailed 12 inches on center in the field. Multiple rows missed have no 12" o.c. nailing
ROOF VALLEY & METAL 08/23/2021 Disapproved - NO FEE JWALKER
Note: synthetic underlayment needs to be nailed 12 inches on center in the field. Multiple rows missed have no 12" o.c. nailing
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/11/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 08/10/2021 APPROVED TBAKER
TIE BEAM / LINTEL 07/06/2021 APPROVED MMESSER
MONOLITHIC SLAB 06/11/2021 Disapproved - NO FEE JWALKER
Note: Detail 2 on Page A-1 is not on the print. Please provide detail 2.
MONOLITHIC SLAB 06/11/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION Detail 2 on Page A-1 is not on the print. Please provide detail 2. Print at 9 rale same building. Contains the detail 2 on page a-1, Please have all drawings with all details on job site.
PLUMBING 1ST ROUGH UNDERGROUND 06/07/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 05/07/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 03/16/2022 03/17/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/09/2021 08/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/09/2021 08/09/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 05/26/2021 06/03/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Correction to revision : changed product approval of (3) windows to Anderson & window sills. See Arch. lettter.
BLD HOLD 05/18/2021 05/25/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision - changed windows to Anderson (manufacturer). 1. Provide product approval of exterior windows to be changed to Anderson per F.S. 553.842. 2. Letter of the Architect of record regarding the change of window sills for different addresses/permits shall also be included in revision and shall be submitted to corresponding permits/addresses for clarity per FBC 7th Ed. Sec. 107.2.1.
MECH COMPLETE 04/08/2021 04/08/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/31/2021 04/01/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2020 7th edition code cycle. (Second Request)
SW1 COMPLETE 03/31/2021 04/07/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/31/2021 03/31/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON COMPLETE 03/31/2021 03/31/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/10/2021 03/16/2021
Note: Released By: JPI
CUSVC COMPLETE 03/10/2021 03/12/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 03/10/2021 03/11/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/10/2021 03/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/10/2021 03/11/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/10/2021 03/11/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2020 7th edition code cycle
PLUM COMPLETE 03/10/2021 03/16/2021
Note: Released By: JPI
SW1 HOLD 03/10/2021 03/16/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM Survey Data: Site Plan must include survey data demonstrating existing conditions to the following criteria: . An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D)
ZON COMPLETE 03/10/2021 03/15/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 03/10/2021 06/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/16/2022
SW ENG REINSPECTION 30 ¤30.00 03/15/2022
SW ENG REINSPECTION 30 ¤30.00 03/15/2022
CONTRACTOR CHANGE ¤40.00 03/15/2022
BUILDING DISCOUNT 100% (¤1,300.40) 04/09/2021
ELECTRIC FEE ¤217.20 04/09/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/09/2021
IMPACT FEE FIRE ¤367.00 04/09/2021
IMPACT FEE PARKS ¤1,199.12 04/09/2021
IMPACT FEE SCHOOL ¤3,600.00 04/09/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/09/2021
MECHANICAL FEE ¤217.20 04/09/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/09/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/09/2021
PLAN CHECK FEE ¤104.80 04/09/2021
PLUMBING FEE ¤217.20 04/09/2021
NEW RESIDENTIAL INSPECTIONS ¤524.00 04/09/2021
SITE PLAN 20 ¤20.00 04/09/2021
SURCHARGE FS 533.721 ¤2.00 04/09/2021
SURCHARGE - FS 468.631 ¤2.00 04/09/2021
STORM WATER PERMIT FEES ¤80.00 04/09/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/09/2021
SEWER CREDIT (¤1,342.00) 04/09/2021
SEWER INSPECTION ¤25.00 04/09/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/09/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/09/2021
CONNECTION FEES ¤1,017.83 04/09/2021
METER - DEPOSIT ¤60.00 04/09/2021
WATER- TURN ON ¤25.00 04/09/2021
ADMIN FEE ¤20.00 04/09/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,929.43