I want to search for...
Permit #2021030707
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00390-0020 |
| CONDITIONED SPACE: 2117 sqft |
| OPENED PORCH (WITH ROOF) : 186 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| GARAGE: 431 sqft |
| Total Square Footage: 2772 sqft |
| Block: 00390 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: (386)437-1508 |
| Location Address: 121 PRITCHARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/09/2021 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: JM PROPERTIES X, LLC |
|
Address 29 COLUMBUS CT PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤190,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MICHAEL MATTHEW SANKOSWSKI
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3 SEAMANSHIP TRAIL PALM COAST, FL 32164 |
CAC1818816 (Exp: 08/31/2026) | 386-316-4401 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/16/2022 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 03/15/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Locking caps on AC not locked Installed climate control equipment does not match energy calcs. No insulation in attic spaces. Stopped inspection | |||
| BLD - BUILDING FINAL | 03/14/2022 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 03/14/2022 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/10/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 03/10/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 03/10/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/10/2022 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 12/17/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: 12/17/2021= correction were made AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. 12/16/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT SIDE END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – | |||
| ROW- PRE-APRON (PRE-POUR) | 12/16/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 12/16/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT SIDE END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – | |||
| ROW- PRE-APRON (PRE-POUR) | 12/15/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: CULVERT PIPE IS OUT OF TOLERANCE ON THE LEFT SIDE END. PLEASE RESET THE PIPE ACCORDING SWALE PLAN – | |||
| U-CROSS CONNECTION | 12/10/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation,no cross connections. | |||
| U - SEWER TIE IN | 12/10/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/10/2021 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/10/2021 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Workers still installing lath 10/14/21 Foam has been used at the window jambs. The detail for the window jamb sills does not show foam. submitt a revision to the building departmart for this change. Or remove the foam and follow the detail for exterio window jambs on page A-6 of the prints 10/15/21 - Submit revision for above noted change. | |||
| ELECTRIC - EARLY POWER | 12/03/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:52 am | |||
| LATH/BRICK/ WATER BARRIER | 10/15/2021 | Disapproved - NO FEE | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Workers still installing lath 10/14/21 Foam has been used at the window jambs. The detail for the window jamb sills does not show foam. submitt a revision to the building departmart for this change. Or remove the foam and follow the detail for exterio window jambs on page A-6 of the prints 10/15/21 - Submit revision for above noted change. | |||
| LATH/BRICK/ WATER BARRIER | 10/14/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Workers still installing lath 10/14/21 Foam has been used at the window jambs. The detail for the window jamb sills does not show foam. submitt a revision to the building departmart for this change. Or remove the foam and follow the detail for exterio window jambs on page A-6 of the prints | |||
| LATH/BRICK/ WATER BARRIER | 10/13/2021 | Disapproved - NO FEE | KSANDOE |
| Note: Workers still installing lath | |||
| INSULATION | 10/11/2021 | APPROVED | KSANDOE |
| ALL ROUGH | 09/24/2021 | APPROVED - AS NOTED | KSANDOE |
| Note: Dryer vent need sealed at the box. | |||
| ALL ROUGH | 09/14/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 08/26/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION synthetic underlayment needs to be nailed 12 inches on center in the field. Multiple rows missed have no 12" o.c. nailing | |||
| ROOF VALLEY & METAL | 08/23/2021 | Disapproved - NO FEE | JWALKER |
| Note: synthetic underlayment needs to be nailed 12 inches on center in the field. Multiple rows missed have no 12" o.c. nailing | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/11/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 08/10/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 07/06/2021 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 06/11/2021 | Disapproved - NO FEE | JWALKER |
| Note: Detail 2 on Page A-1 is not on the print. Please provide detail 2. | |||
| MONOLITHIC SLAB | 06/11/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Detail 2 on Page A-1 is not on the print. Please provide detail 2. Print at 9 rale same building. Contains the detail 2 on page a-1, Please have all drawings with all details on job site. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/07/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/07/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/16/2022 | 03/17/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/09/2021 | 08/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/09/2021 | 08/09/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/26/2021 | 06/03/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Correction to revision : changed product approval of (3) windows to Anderson & window sills. See Arch. lettter. | |||
| BLD | HOLD | 05/18/2021 | 05/25/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision - changed windows to Anderson (manufacturer). 1. Provide product approval of exterior windows to be changed to Anderson per F.S. 553.842. 2. Letter of the Architect of record regarding the change of window sills for different addresses/permits shall also be included in revision and shall be submitted to corresponding permits/addresses for clarity per FBC 7th Ed. Sec. 107.2.1. | |||
| MECH | COMPLETE | 04/08/2021 | 04/08/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/31/2021 | 04/01/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2020 7th edition code cycle. (Second Request) | |||
| SW1 | COMPLETE | 03/31/2021 | 04/07/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/31/2021 | 03/31/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | COMPLETE | 03/31/2021 | 03/31/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/10/2021 | 03/16/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/10/2021 | 03/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 03/10/2021 | 03/11/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/10/2021 | 03/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| LOCATE | COMPLETE | 03/10/2021 | 03/11/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/10/2021 | 03/11/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2020 7th edition code cycle | |||
| PLUM | COMPLETE | 03/10/2021 | 03/16/2021 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 03/10/2021 | 03/16/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM Survey Data: Site Plan must include survey data demonstrating existing conditions to the following criteria: . An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D) | |||
| ZON | COMPLETE | 03/10/2021 | 03/15/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/10/2021 | 06/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/16/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/15/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/15/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 03/15/2022 |
| BUILDING DISCOUNT 100% | (¤1,300.40) | 04/09/2021 |
| ELECTRIC FEE | ¤217.20 | 04/09/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 04/09/2021 |
| IMPACT FEE FIRE | ¤367.00 | 04/09/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 04/09/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/09/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 04/09/2021 |
| MECHANICAL FEE | ¤217.20 | 04/09/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/09/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 04/09/2021 |
| PLAN CHECK FEE | ¤104.80 | 04/09/2021 |
| PLUMBING FEE | ¤217.20 | 04/09/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤524.00 | 04/09/2021 |
| SITE PLAN 20 | ¤20.00 | 04/09/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/09/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/09/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/09/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 04/09/2021 |
| SEWER CREDIT | (¤1,342.00) | 04/09/2021 |
| SEWER INSPECTION | ¤25.00 | 04/09/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 04/09/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 04/09/2021 |
| CONNECTION FEES | ¤1,017.83 | 04/09/2021 |
| METER - DEPOSIT | ¤60.00 | 04/09/2021 |
| WATER- TURN ON | ¤25.00 | 04/09/2021 |
| ADMIN FEE | ¤20.00 | 04/09/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,929.43 |