Permit #2021030798
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00080-0010 |
| CONDITIONED SPACE: 2126 sqft |
| GARAGE: 541 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| OPENED PORCH (WITH ROOF) : 258 sqft |
| OPENED PORCH (WITH ROOF) : 219 sqft |
| Total Square Footage: 3187 sqft |
| Block: 00080 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 386-447-4151 |
| Location Address: 27 FAYY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/25/2021 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: COELHO NICHOLAS J & SHUYA Z COELHO H&W |
|
Address 19 FENWICK LANE PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/28/2023 | FINAL APPROVED | AGAETANO |
| Note: 4/26/2023 - PREVIOUS INSPECTION NOTES 04-26-2023 1. Outlet in entry on right not working. 2. Guest bath outlet next to kitchen loose. 3. Kitchen outlet spacing not per plans. Power strip installed on both left and right side of cook top. NEC 210.52. Spacing required. 24" on both sides of the stove, then 24" thereafter. 4. Garage entry to lanai at threshold is a tripping hazard. 5. Water heater needs condensate drain. Inspection stopped. 04-28-2023 As per Building Official outlet switched power strips are acceptable according to NEC 210.52. | |||
| BLD - BUILDING FINAL | 04/26/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 04-26-2023 1. Outlet in entry on right not working. 2. Guest bath outlet next to kitchen loose. 3. Kitchen outlet spacing not per plans. Power strip installed on both left and right side of cook top. NEC 210.52. Spacing required. 24" on both sides of the stove, then 24" thereafter. NM conductors are exposed at the power strip going into the wall. 4. Garage entry to lanai at threshold is a tripping hazard. Inspection stopped. | |||
| ROW - STORMWATER FINAL | 04/25/2023 | FINAL APPROVED | EMADISON |
| Note: ** 04/25/23 CORRECTIONS MADE 4/20/2023 - PREVIOUS INSPECTION NOTES 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 LEFT SIDE OF DRIVEWAY NEED TO REPAIR WASHOUT WHERE POP-UP DRAIN FLOWS INTO SWALE AND CLEAN OUT SEDIMENT FROM SWALE HIGH LIGHTED WITH PINK PAINT. ** RIGHT SIDE OF DRIVEWAY REPAIR WASHOUT AND SOD AREA FROM POP-UP DRAIN TO SWALE HIGH LIGHTED WITH PINK PAINT. ** NEED TO CLEAN "ALL" SEDIMENT FROM SWALE ON RIGHT SIDE AND SOD ** NEED TO CLEAN "ALL" SEDIMENT FROM CULVERT PIPE AS COMPLETELY PLUGGED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/20/2023 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 04/20/2023 | CANCELLED BY APPLICANT | EMADISON |
| Note: 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 LEFT SIDE OF DRIVEWAY NEED TO REPAIR WASHOUT WHERE POP-UP DRAIN FLOWS INTO SWALE AND CLEAN OUT SEDIMENT FROM SWALE HIGH LIGHTED WITH PINK PAINT. ** RIGHT SIDE OF DRIVEWAY REPAIR WASHOUT AND SOD AREA FROM POP-UP DRAIN TO SWALE HIGH LIGHTED WITH PINK PAINT. ** NEED TO CLEAN "ALL" SEDIMENT FROM SWALE ON RIGHT SIDE AND SOD ** NEED TO CLEAN "ALL" SEDIMENT FROM CULVERT PIPE AS COMPLETELY PLUGGED | |||
| U-CROSS CONNECTION | 04/20/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/03/2023 | FINAL APPROVED | EMADISON |
| Note: ** 04/03/23 CORRECTIONS MADE ________________________________________________________________________________________________________________________ 3/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE HOT PATCH FOR THE ROAD DAMAGE ALL AREAS ARE PAINTED WHITE THAT NEEDS REPAIRED. | |||
| ROW - STORMWATER FINAL | 04/03/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/03/23 LEFT SIDE OF DRIVEWAY NEED TO REPAIR WASHOUT WHERE POP-UP DRAIN FLOWS INTO SWALE AND CLEAN OUT SEDIMENT FROM SWALE HIGH LIGHTED WITH PINK PAINT. ** RIGHT SIDE OF DRIVEWAY REPAIR WASHOUT AND SOD AREA FROM POP-UP DRAIN TO SWALE HIGH LIGHTED WITH PINK PAINT. ** NEED TO CLEAN "ALL" SEDIMENT FROM SWALE ON RIGHT SIDE AND SOD ** NEED TO CLEAN "ALL" SEDIMENT FROM CULVERT PIPE AS COMPLETELY PLUGGED | |||
| ROW - FINAL APRON (AFTER POUR) | 03/06/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE HOT PATCH FOR THE ROAD DAMAGE ALL AREAS ARE PAINTED WHITE THAT NEEDS REPAIRED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/01/2023 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 03/01/2023 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 01/18/2023 | APPROVED | EMADISON |
| Note: ** 01/18/23 READY TO POUR IN THE EVENT OF RAIN OR WETNESS RECHECK CULVERT ELEVATION & COMPACTION ** LARGE WASHOUTS ALONG THE SEAWALL NEED TO BEE FILLED IN WITH COMPACTED MATERIAL AND SOD, THESE AREAS ARE A SAFETY HAZARD FOR A PERSON OR A PET _________________________________________________________________________________________________________________________ 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 TOO MUCH MATERIAL AROUND CULVERT NEEDS TO BE BURIED HALF WAY AND COMPACTED ** MATERIAL NEEDS TO GRADUALLY TRANSITION AWAY FROM CULVERT USING A 4 TO 1 SLOPE ** MATERIAL ALSO NEEDS TO BE COMPACTED AS THERE IS NO COMPACTION MATERIAL CAVES IN WHEN WALKING ON IT, WOOD WAS PARTIALLY BURIED IN MATERIAL NEEDS TO BE REMOVED. ** STRING LINES LEFT IN PLACE SEVERAL MEASUREMENTS YOU NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW. ** FOOTERS ARE FULL OF WATER, WATER ALSO FILLING CULVERT, MISSING REBAR ON RIGHT SIDE | |||
| ROW- PRE-APRON (PRE-POUR) | 01/11/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/11/23 TOO MUCH MATERIAL AROUND CULVERT NEEDS TO BE BURIED HALF WAY AND COMPACTED ** MATERIAL NEEDS TO GRADUALLY TRANSITION AWAY FROM CULVERT USING A 4 TO 1 SLOPE ** MATERIAL ALSO NEEDS TO BE COMPACTED AS THERE IS NO COMPACTION MATERIAL CAVES IN WHEN WALKING ON IT, WOOD WAS PARTIALLY BURIED IN MATERIAL NEEDS TO BE REMOVED. ** STRING LINES LEFT IN PLACE SEVERAL MEASUREMENTS YOU NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW. ** FOOTERS ARE FULL OF WATER, WATER ALSO FILLING CULVERT, MISSING REBAR ON RIGHT SIDE | |||
| U - SEWER TIE IN | 11/23/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/23/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 11/08/2022 | APPROVED | JMUNSON |
| Note: Inspector Notes from Inspection 2170 THIS IS A REINSPECTION No work done 12/2/21 Emailed FPL at 11:00 am | |||
| ROW - DRAINAGE | 09/26/2022 | APPROVED | EMADISON |
| Note: ** 09/26/22 CORRECTIONS MADE, EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION 9/23/2022 - PREVIOUS INSPECTION NOTES ** 09/23/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/26/22 *** SEE ATTACHED PHOTOS*** 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/23/22 *** SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 09/23/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/23/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/26/22 *** SEE ATTACHED PHOTOS*** 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/23/22 *** SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 09/21/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/21/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** FOLLOW UP INSPECTION ON 09/23/22 *** SEE ATTACHED PHOTOS*** | |||
| LATH/BRICK/ WATER BARRIER | 06/09/2022 | APPROVED | AGAETANO |
| INSULATION | 05/10/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 04/25/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 3/15/2022 10:24:10 AM THIS IS A REINSPECTION 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 04-06-2022 - 1. UFER ground not installed properly. Connection must be visible. 2. Seal concrete in all floor cut out plumbing lines ( right bathroom drain is not sealed). 3. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. Needs to be strapped 4' minimum and slopped. 2. | |||
| ALL ROUGH | 04/12/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 03-15-2022. 1. UFER ground not protected. 2.Head test does not hold water. 3.Seal concrete in all floor cut outs at plumbing lines ( right of front entry). 4. 2' Plumbing vent stack line in front bathroom at ceiling not supported properly (every 4'). 04-12-2022 - UFER ground not protected. NEC 250.62 (2). | |||
| ALL ROUGH | 04/06/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION ADDED ON 3/15/2022 10:24:10 AM THIS IS A REINSPECTION 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 04-06-2022 - 1. UFER ground not installed properly. Connection must be visible. 2. Seal concrete in all floor cut out plumbing lines ( right bathroom drain is not sealed). 3. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. Needs to be strapped 4' minimum and slopped. 2. | |||
| ALL ROUGH | 03/15/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Ground not connected to UFER. NEC 250.62 1 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 03-15-2022. 1. UFER ground not protected. NEC 250.64 (1 & 2). 2.Head test does not hold water. 3.Seal concrete in all floor cut outs at plumbing lines ( right of front entry). 4. 2' Plumbing vent stack line in front bathroom at ceiling not supported properly (every 4'). | |||
| ALL ROUGH | 03/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. | |||
| WALL SHEATHING | 03/03/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Please remove shiners at lanai area and nail properly. | |||
| WALL SHEATHING | 03/01/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please remove shiners at lanai area and nail properly. | |||
| ELECTRIC TEMP POLE | 12/02/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION No work done 12/2/21 Emailed FPL at 11:00 am | |||
| ELECTRIC TEMP POLE | 11/23/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: No work done | |||
| ROOF VALLEY & METAL | 10/21/2021 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION MULTIPLE TRUSS TIED DOWNS ARE MISSING FASTENERS, TRUSS #11 @ FRONT ENTRY MISSED STRAP, RETRO STRAP HAS ONLY 2 FASTENERS AND IS OVER ALLOWABLE TOLERANCE FOR "DOG LEGGING" OF STRAP | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/07/2021 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: MULTIPLE TRUSS TIED DOWNS ARE MISSING FASTENERS, TRUSS #11 @ FRONT ENTRY MISSED STRAP, RETRO STRAP HAS ONLY 2 FASTENERS AND IS OVER ALLOWABLE TOLERANCE FOR "DOG LEGGING" OF STRAP | |||
| TIE BEAM / LINTEL | 09/09/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 09/08/2021 | CANCELLED BY APPLICANT | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 08/19/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/04/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION need to have address on compaction report and place sticker on actual 8-4-21... notes above resolved | |||
| MONOLITHIC SLAB | 08/02/2021 | Disapproved - NO FEE | WMILLER |
| Note: need to have address on compaction report and place sticker on actual permit | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/20/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/08/2021 | APPROVED | CSTONE |
| WILDLIFE CHECK - ENVIRONMENTAL | 06/21/2021 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/21/2023 | 04/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/18/2021 | 06/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/18/2021 | 06/18/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/02/2021 | 06/02/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items | |||
| ZON | COMPLETE | 05/26/2021 | 05/26/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 05/26/2021 | 05/28/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 5/28/21 and did not find any Gopher Tortoise or their burrows. Staff suggests silt fencing the property as soon as possible to prevent any Gopher Tortoise from moving in prior to construction. | |||
| PLFM | COMPLETE | 05/26/2021 | 05/26/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM No comments | |||
| ENGIN1 | COMPLETE | 05/26/2021 | 05/26/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/04/2021 | 06/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/04/2021 | 05/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/04/2021 | 05/04/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/04/2021 | 05/05/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 05/04/2021 | 05/10/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 05/04/2021 | 05/04/2021 |
| Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The FEMA information on the Site Plan/Survey is incorrect. Please correct the effective date on both documents. | |||
| BLD | HOLD | 03/11/2021 | 03/16/2021 |
| Note: Held By: JPI 1. Soffit 23352 has not been approved for 2020 Code cycle. | |||
| CUSVC | COMPLETE | 03/11/2021 | 03/12/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 03/11/2021 | 03/12/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/11/2021 | 03/11/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US No benchmark on survey | |||
| LOCATE | COMPLETE | 03/11/2021 | 03/15/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/11/2021 | 03/12/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/11/2021 | 03/16/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 03/11/2021 | 03/17/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/11/2021 | 03/16/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Flat roofs shall be located at the rear of the building out of view from the public right-of-way Corrugated panels are prohibited in palm coast Please specify material of walkways and patio on site plan survey Please show setbacks from the walkways and driveway to property line on site plan survey Landscape must show and specify all required trees Foundation plantings must be located within 2-8ft of front foundation not just the garage area Please show width of driveway at its widest point |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 04/25/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 04/25/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/25/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/25/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/25/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/25/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/25/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2023 |
| CONNECTION FEES | ¤1,017.83 | 06/25/2021 |
| METER - DEPOSIT | ¤60.00 | 06/25/2021 |
| WATER- TURN ON | ¤25.00 | 06/25/2021 |
| ADMIN FEE | ¤20.00 | 06/25/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/25/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/25/2021 |
| SEWER INSPECTION | ¤25.00 | 06/25/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/25/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/25/2021 |
| BUILDING DISCOUNT 100% | (¤1,460.00) | 06/25/2021 |
| ELECTRIC FEE | ¤240.00 | 06/25/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/25/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/25/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/25/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/25/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/25/2021 |
| MECHANICAL FEE | ¤240.00 | 06/25/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/25/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/25/2021 |
| PLAN CHECK FEE | ¤120.00 | 06/25/2021 |
| PLUMBING FEE | ¤240.00 | 06/25/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤600.00 | 06/25/2021 |
| SITE PLAN 20 | ¤20.00 | 06/25/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/25/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/25/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,573.93 |