Permit #2021030798

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00080-0010
CONDITIONED SPACE: 2126 sqft
GARAGE: 541 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
OPENED PORCH (WITH ROOF) : 258 sqft
OPENED PORCH (WITH ROOF) : 219 sqft
Total Square Footage: 3187 sqft
Block: 00080
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 386-447-4151
Location Address: 27 FAYY LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/25/2021
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: COELHO NICHOLAS J & SHUYA Z COELHO H&W

Address

19 FENWICK LANE

PALM COAST, FL 32137

Lot: 0010
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
KERRY DWAIN AYLESWORTH II
Status Location Address Mailing Address State License Number Phone
ACTIVE

2820 LEWIS SPEEDWAY

ST AUGUSTINE, FL 32084

STE B

ST AUGUSTINE, FL 32084

CAC1820713 (Exp: 08/31/2026) 904-342-5709

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/28/2023 FINAL APPROVED AGAETANO
Note: 4/26/2023 - PREVIOUS INSPECTION NOTES 04-26-2023 1. Outlet in entry on right not working. 2. Guest bath outlet next to kitchen loose. 3. Kitchen outlet spacing not per plans. Power strip installed on both left and right side of cook top. NEC 210.52. Spacing required. 24" on both sides of the stove, then 24" thereafter. 4. Garage entry to lanai at threshold is a tripping hazard. 5. Water heater needs condensate drain. Inspection stopped. 04-28-2023 As per Building Official outlet switched power strips are acceptable according to NEC 210.52.
BLD - BUILDING FINAL 04/26/2023 Disapproved - NO FEE AGAETANO
Note: 04-26-2023 1. Outlet in entry on right not working. 2. Guest bath outlet next to kitchen loose. 3. Kitchen outlet spacing not per plans. Power strip installed on both left and right side of cook top. NEC 210.52. Spacing required. 24" on both sides of the stove, then 24" thereafter. NM conductors are exposed at the power strip going into the wall. 4. Garage entry to lanai at threshold is a tripping hazard. Inspection stopped.
ROW - STORMWATER FINAL 04/25/2023 FINAL APPROVED EMADISON
Note: ** 04/25/23 CORRECTIONS MADE 4/20/2023 - PREVIOUS INSPECTION NOTES 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 LEFT SIDE OF DRIVEWAY NEED TO REPAIR WASHOUT WHERE POP-UP DRAIN FLOWS INTO SWALE AND CLEAN OUT SEDIMENT FROM SWALE HIGH LIGHTED WITH PINK PAINT. ** RIGHT SIDE OF DRIVEWAY REPAIR WASHOUT AND SOD AREA FROM POP-UP DRAIN TO SWALE HIGH LIGHTED WITH PINK PAINT. ** NEED TO CLEAN "ALL" SEDIMENT FROM SWALE ON RIGHT SIDE AND SOD ** NEED TO CLEAN "ALL" SEDIMENT FROM CULVERT PIPE AS COMPLETELY PLUGGED
U -UTILITY RESIDENTIAL FINAL 04/20/2023 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 04/20/2023 CANCELLED BY APPLICANT EMADISON
Note: 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 LEFT SIDE OF DRIVEWAY NEED TO REPAIR WASHOUT WHERE POP-UP DRAIN FLOWS INTO SWALE AND CLEAN OUT SEDIMENT FROM SWALE HIGH LIGHTED WITH PINK PAINT. ** RIGHT SIDE OF DRIVEWAY REPAIR WASHOUT AND SOD AREA FROM POP-UP DRAIN TO SWALE HIGH LIGHTED WITH PINK PAINT. ** NEED TO CLEAN "ALL" SEDIMENT FROM SWALE ON RIGHT SIDE AND SOD ** NEED TO CLEAN "ALL" SEDIMENT FROM CULVERT PIPE AS COMPLETELY PLUGGED
U-CROSS CONNECTION 04/20/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 04/03/2023 FINAL APPROVED EMADISON
Note: ** 04/03/23 CORRECTIONS MADE ________________________________________________________________________________________________________________________ 3/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE HOT PATCH FOR THE ROAD DAMAGE ALL AREAS ARE PAINTED WHITE THAT NEEDS REPAIRED.
ROW - STORMWATER FINAL 04/03/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/03/23 LEFT SIDE OF DRIVEWAY NEED TO REPAIR WASHOUT WHERE POP-UP DRAIN FLOWS INTO SWALE AND CLEAN OUT SEDIMENT FROM SWALE HIGH LIGHTED WITH PINK PAINT. ** RIGHT SIDE OF DRIVEWAY REPAIR WASHOUT AND SOD AREA FROM POP-UP DRAIN TO SWALE HIGH LIGHTED WITH PINK PAINT. ** NEED TO CLEAN "ALL" SEDIMENT FROM SWALE ON RIGHT SIDE AND SOD ** NEED TO CLEAN "ALL" SEDIMENT FROM CULVERT PIPE AS COMPLETELY PLUGGED
ROW - FINAL APRON (AFTER POUR) 03/06/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE HOT PATCH FOR THE ROAD DAMAGE ALL AREAS ARE PAINTED WHITE THAT NEEDS REPAIRED.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/01/2023 APPROVED PFLANAGAN
FINAL SURVEY (OFFICE USE ONLY) 03/01/2023 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 01/18/2023 APPROVED EMADISON
Note: ** 01/18/23 READY TO POUR IN THE EVENT OF RAIN OR WETNESS RECHECK CULVERT ELEVATION & COMPACTION ** LARGE WASHOUTS ALONG THE SEAWALL NEED TO BEE FILLED IN WITH COMPACTED MATERIAL AND SOD, THESE AREAS ARE A SAFETY HAZARD FOR A PERSON OR A PET _________________________________________________________________________________________________________________________ 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 TOO MUCH MATERIAL AROUND CULVERT NEEDS TO BE BURIED HALF WAY AND COMPACTED ** MATERIAL NEEDS TO GRADUALLY TRANSITION AWAY FROM CULVERT USING A 4 TO 1 SLOPE ** MATERIAL ALSO NEEDS TO BE COMPACTED AS THERE IS NO COMPACTION MATERIAL CAVES IN WHEN WALKING ON IT, WOOD WAS PARTIALLY BURIED IN MATERIAL NEEDS TO BE REMOVED. ** STRING LINES LEFT IN PLACE SEVERAL MEASUREMENTS YOU NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW. ** FOOTERS ARE FULL OF WATER, WATER ALSO FILLING CULVERT, MISSING REBAR ON RIGHT SIDE
ROW- PRE-APRON (PRE-POUR) 01/11/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/11/23 TOO MUCH MATERIAL AROUND CULVERT NEEDS TO BE BURIED HALF WAY AND COMPACTED ** MATERIAL NEEDS TO GRADUALLY TRANSITION AWAY FROM CULVERT USING A 4 TO 1 SLOPE ** MATERIAL ALSO NEEDS TO BE COMPACTED AS THERE IS NO COMPACTION MATERIAL CAVES IN WHEN WALKING ON IT, WOOD WAS PARTIALLY BURIED IN MATERIAL NEEDS TO BE REMOVED. ** STRING LINES LEFT IN PLACE SEVERAL MEASUREMENTS YOU NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW. ** FOOTERS ARE FULL OF WATER, WATER ALSO FILLING CULVERT, MISSING REBAR ON RIGHT SIDE
U - SEWER TIE IN 11/23/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 11/23/2022 APPROVED MGIBSON
ELECTRIC - EARLY POWER 11/08/2022 APPROVED JMUNSON
Note: Inspector Notes from Inspection 2170 THIS IS A REINSPECTION No work done 12/2/21 Emailed FPL at 11:00 am
ROW - DRAINAGE 09/26/2022 APPROVED EMADISON
Note: ** 09/26/22 CORRECTIONS MADE, EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION 9/23/2022 - PREVIOUS INSPECTION NOTES ** 09/23/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/26/22 *** SEE ATTACHED PHOTOS*** 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/23/22 *** SEE ATTACHED PHOTOS***
ROW - DRAINAGE 09/23/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/23/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/26/22 *** SEE ATTACHED PHOTOS*** 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 09/23/22 *** SEE ATTACHED PHOTOS***
ROW - DRAINAGE 09/21/2022 Disapproved - NO FEE EMADISON
Note: ** 09/21/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL A TEMPORARY CULVERT 12 INCH MINIMUM AS SWALE IS COMPLETELY BLOCKED, CAUSING EROSION OF MATERIAL ONTO ROADWAY, ** BUILDER ALSO NEEDS TO REMOVE PORTA-JOHN FROM THE SWALE AND PUT ONTO JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE ACROOS SWALE ON LEFT SIDE TO PREVENT SEDIMENT FROM NEGATIVELY IMPACTING ADJACENT PROPERTY. ** BUILDER REQUIRED TO CLEAN ROADWAY OF MATERIAL THAT HAS BEEN WASHED ONTO IT. ** FOLLOW UP INSPECTION ON 09/23/22 *** SEE ATTACHED PHOTOS***
LATH/BRICK/ WATER BARRIER 06/09/2022 APPROVED AGAETANO
INSULATION 05/10/2022 APPROVED AGAETANO
ALL ROUGH 04/25/2022 APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 3/15/2022 10:24:10 AM THIS IS A REINSPECTION 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 04-06-2022 - 1. UFER ground not installed properly. Connection must be visible. 2. Seal concrete in all floor cut out plumbing lines ( right bathroom drain is not sealed). 3. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. Needs to be strapped 4' minimum and slopped. 2.
ALL ROUGH 04/12/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 03-15-2022. 1. UFER ground not protected. 2.Head test does not hold water. 3.Seal concrete in all floor cut outs at plumbing lines ( right of front entry). 4. 2' Plumbing vent stack line in front bathroom at ceiling not supported properly (every 4'). 04-12-2022 - UFER ground not protected. NEC 250.62 (2).
ALL ROUGH 04/06/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION ADDED ON 3/15/2022 10:24:10 AM THIS IS A REINSPECTION 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 04-06-2022 - 1. UFER ground not installed properly. Connection must be visible. 2. Seal concrete in all floor cut out plumbing lines ( right bathroom drain is not sealed). 3. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. Needs to be strapped 4' minimum and slopped. 2.
ALL ROUGH 03/15/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 1. Ground not connected to UFER. NEC 250.62 1 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly. 03-15-2022. 1. UFER ground not protected. NEC 250.64 (1 & 2). 2.Head test does not hold water. 3.Seal concrete in all floor cut outs at plumbing lines ( right of front entry). 4. 2' Plumbing vent stack line in front bathroom at ceiling not supported properly (every 4').
ALL ROUGH 03/07/2022 Disapproved - NO FEE AGAETANO
Note: 1. Ground not connected to UFER. 2. 10-2 in panel not phased out. 3. Head test does not hold water. 4. Seal concrete in all floor cut out @ plumbing lines. 5. 2" plumbing vent stack line in front bathroom at ceiling not supported properly.
WALL SHEATHING 03/03/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Please remove shiners at lanai area and nail properly.
WALL SHEATHING 03/01/2022 Disapproved - NO FEE AGAETANO
Note: Please remove shiners at lanai area and nail properly.
ELECTRIC TEMP POLE 12/02/2021 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION No work done 12/2/21 Emailed FPL at 11:00 am
ELECTRIC TEMP POLE 11/23/2021 Disapproved -FEE REQUIRED JMUNSON
Note: No work done
ROOF VALLEY & METAL 10/21/2021 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/11/2021 APPROVED DCUSHING
Note: THIS IS A REINSPECTION MULTIPLE TRUSS TIED DOWNS ARE MISSING FASTENERS, TRUSS #11 @ FRONT ENTRY MISSED STRAP, RETRO STRAP HAS ONLY 2 FASTENERS AND IS OVER ALLOWABLE TOLERANCE FOR "DOG LEGGING" OF STRAP
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/07/2021 Disapproved -FEE REQUIRED DCUSHING
Note: MULTIPLE TRUSS TIED DOWNS ARE MISSING FASTENERS, TRUSS #11 @ FRONT ENTRY MISSED STRAP, RETRO STRAP HAS ONLY 2 FASTENERS AND IS OVER ALLOWABLE TOLERANCE FOR "DOG LEGGING" OF STRAP
TIE BEAM / LINTEL 09/09/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 09/08/2021 CANCELLED BY APPLICANT LMILLER
FOUND SURVEY APPROVED (OFFICE) 08/19/2021 APPROVED TBAKER
MONOLITHIC SLAB 08/04/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION need to have address on compaction report and place sticker on actual 8-4-21... notes above resolved
MONOLITHIC SLAB 08/02/2021 Disapproved - NO FEE WMILLER
Note: need to have address on compaction report and place sticker on actual permit
PLUMBING 1ST ROUGH UNDERGROUND 07/20/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/08/2021 APPROVED CSTONE
WILDLIFE CHECK - ENVIRONMENTAL 06/21/2021 APPROVED JMYERS

Review History

Department Status Date In Date Out
MECH COMPLETE 04/21/2023 04/24/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/19/2021 08/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/19/2021 08/19/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 06/22/2021 06/22/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/18/2021 06/18/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2021 06/18/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 06/02/2021 06/02/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items
ZON COMPLETE 05/26/2021 05/26/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLENV COMPLETE 05/26/2021 05/28/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 5/28/21 and did not find any Gopher Tortoise or their burrows. Staff suggests silt fencing the property as soon as possible to prevent any Gopher Tortoise from moving in prior to construction.
PLFM COMPLETE 05/26/2021 05/26/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM No comments
ENGIN1 COMPLETE 05/26/2021 05/26/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
SWALE COMPLETE 05/04/2021 06/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/04/2021 05/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/04/2021 05/04/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 05/04/2021 05/05/2021
Note: Released By: JPI
SW1 COMPLETE 05/04/2021 05/10/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
PLFM HOLD 05/04/2021 05/04/2021
Note: Held By: JORDAN MYERS - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The FEMA information on the Site Plan/Survey is incorrect. Please correct the effective date on both documents.
BLD HOLD 03/11/2021 03/16/2021
Note: Held By: JPI 1. Soffit 23352 has not been approved for 2020 Code cycle.
CUSVC COMPLETE 03/11/2021 03/12/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 03/11/2021 03/12/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 03/11/2021 03/11/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US No benchmark on survey
LOCATE COMPLETE 03/11/2021 03/15/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/11/2021 03/12/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/11/2021 03/16/2021
Note: Released By: JPI
SW1 COMPLETE 03/11/2021 03/17/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 03/11/2021 03/16/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Flat roofs shall be located at the rear of the building out of view from the public right-of-way Corrugated panels are prohibited in palm coast Please specify material of walkways and patio on site plan survey Please show setbacks from the walkways and driveway to property line on site plan survey Landscape must show and specify all required trees Foundation plantings must be located within 2-8ft of front foundation not just the garage area Please show width of driveway at its widest point

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 04/25/2023
CONTRACTOR CHANGE ¤40.00 04/25/2023
SW ENG - INSPECTION 20 ¤20.00 04/25/2023
SW ENG - INSPECTION 20 ¤20.00 04/25/2023
SW ENG - INSPECTION 20 ¤20.00 04/25/2023
SW ENG REINSPECTION 20 ¤20.00 04/25/2023
SW ENG REINSPECTION 20 ¤20.00 04/25/2023
SW ENG REINSPECTION 30 ¤30.00 04/25/2023
PLAN REVIEW - REVISION ¤32.50 04/25/2023
REINSPECTION RESIDENTIAL ¤40.00 04/25/2023
REINSPECTION RESIDENTIAL ¤40.00 04/25/2023
REINSPECTION RESIDENTIAL ¤40.00 04/25/2023
REINSPECTION RESIDENTIAL ¤40.00 04/25/2023
REINSPECTION RESIDENTIAL ¤40.00 04/25/2023
CONNECTION FEES ¤1,017.83 06/25/2021
METER - DEPOSIT ¤60.00 06/25/2021
WATER- TURN ON ¤25.00 06/25/2021
ADMIN FEE ¤20.00 06/25/2021
STORM WATER PERMIT FEES ¤80.00 06/25/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/25/2021
SEWER INSPECTION ¤25.00 06/25/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/25/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/25/2021
BUILDING DISCOUNT 100% (¤1,460.00) 06/25/2021
ELECTRIC FEE ¤240.00 06/25/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/25/2021
IMPACT FEE FIRE ¤367.00 06/25/2021
IMPACT FEE PARKS ¤1,199.12 06/25/2021
IMPACT FEE SCHOOL ¤3,600.00 06/25/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/25/2021
MECHANICAL FEE ¤240.00 06/25/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/25/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/25/2021
PLAN CHECK FEE ¤120.00 06/25/2021
PLUMBING FEE ¤240.00 06/25/2021
NEW RESIDENTIAL INSPECTIONS ¤600.00 06/25/2021
SITE PLAN 20 ¤20.00 06/25/2021
SURCHARGE FS 533.721 ¤2.00 06/25/2021
SURCHARGE - FS 468.631 ¤2.00 06/25/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,573.93