I want to search for...

Permit #2021031031

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00080-0350
CONDITIONED SPACE: 2619 sqft
GARAGE: 686 sqft
OPENED PORCH (WITH ROOF) : 418 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
Total Square Footage: 3776 sqft
Block: 00080
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 386-447-4151
Location Address: 48 FARISTON PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/17/2021
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: COELHO JOSEPH E & MARIA J H&W

Address

97 BEAVERDAM LANE

PALM COAST, FL 32137

Lot: 0350
Contracted Stated Job Value: ¤450,000.00
Job Description: SINGLE FAMILY HOME
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
KERRY DWAIN AYLESWORTH II
Status Location Address Mailing Address State License Number Phone
ACTIVE

2820 LEWIS SPEEDWAY

ST AUGUSTINE, FL 32084

STE B

ST AUGUSTINE, FL 32084

CAC1820713 (Exp: 08/31/2026) 904-342-5709

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/01/2023 FINAL APPROVED AGAETANO
Note: 11/30/2023 - PREVIOUS INSPECTION NOTES 11/29/2023 - PREVIOUS INSPECTION NOTES 11/29/23- 1. hose bibb vaccum breakers multiple missing set screw and need sheared off.P2902.4 Protection of potable water outlets. 2. Outlets at outdoor kitchen need to be GFCI. NEC, 210.8-A, 3. Lanai bathroom outlet needs gfci NEC 210.8-A. 4. 3 outlets in Laundry room need to be GFCI NEC 210.8-A. 5. Master bath toilet room outlet needs to be GFCI NEC 210.8-A. 6. Please Identify heater installed for breaker size verification. 7. Please seal all ceiling penetration in garage and AHU Plenum ceiling penetration. 8. Please post Insulation certificate signed by installer. Inspector Notes from Inspection 2250 Monolithic slab in back yard shown on Site Plan with turned down, 8" x 8" thickened edge with one No. 4 bar throughout. Inspection administratively approved by CBO. 11-30-2023 1. Hose bib vaccum breaker multiple missing set screw and need sheared off.P2902.4. Left side of home. 2. Electrical panel not labeled completely.
BLD - BUILDING FINAL 11/30/2023 Disapproved - NO FEE AGAETANO
Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 11/29/23- 1. hose bibb vaccum breakers multiple missing set screw and need sheared off.P2902.4 Protection of potable water outlets. 2. Outlets at outdoor kitchen need to be GFCI. NEC, 210.8-A, 3. Lanai bathroom outlet needs gfci NEC 210.8-A. 4. 3 outlets in Laundry room need to be GFCI NEC 210.8-A. 5. Master bath toilet room outlet needs to be GFCI NEC 210.8-A. 6. Please Identify heater installed for breaker size verification. 7. Please seal all ceiling penetration in garage and AHU Plenum ceiling penetration. 8. Please post Insulation certificate signed by installer. Inspector Notes from Inspection 2250 Monolithic slab in back yard shown on Site Plan with turned down, 8" x 8" thickened edge with one No. 4 bar throughout. Inspection administratively approved by CBO. 11-30-2023 1. Hose bib vaccum breaker multiple missing set screw and need sheared off.P2902.4. Left side of home. 2. Electrical panel not labeled completely.
BLD - BUILDING FINAL 11/29/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 11/29/23- 1. hose bibb vaccum breakers multiple missing set screw and need sheared off.P2902.4 Protection of potable water outlets. 2. Outlets at outdoor kitchen need to be GFCI. NEC, 210.8-A, 3. Lanai bathroom outlet needs gfci NEC 210.8-A. 4. 3 outlets in Laundry room need to be GFCI NEC 210.8-A. 5. Master bath toilet room outlet needs to be GFCI NEC 210.8-A. 6. Please Identify heater installed for breaker size verification. 7. Please seal all ceiling penetration in garage and AHU Plenum ceiling penetration. 8. Please post Insulation certificate signed by installer. Inspector Notes from Inspection 2250 Monolithic slab in back yard shown on Site Plan with turned down, 8" x 8" thickened edge with one No. 4 bar throughout. Inspection administratively approved by CBO.
MONOLITHIC SLAB 11/07/2023 APPROVED - AS NOTED PBUCKLEY
Note: Monolithic slab in back yard shown on Site Plan with turned down, 8" x 8" thickened edge with one No. 4 bar throughout. Inspection administratively approved by CBO.
U-CROSS CONNECTION 10/20/2023 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 10/19/2023 APPROVED EMADISON
Note: ** 10/19/23 CORRECTIONS MADE ____________________________________________________________________________________________________________________ 10/16/2023 - PREVIOUS INSPECTION NOTES ** 10/16/23 ROW AT PROPERTY LINE WITH 27 FAY LN NEEDS REPAIRED AND MATCH THE EXISTING GRADE ** MATERIAL THAT HAS ERODED INTO SWALE NEEDS TO BE REMOVED AND BARE EARTH NEEDS TO BE COVERED WITH SOD AS INDICATED IN PREVIOUS INSPECTION ____________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 CORRECTIONS AS NOTED BELOW REQUIRED TO BE COMPLETED BEFORE FINAL ROW INSPECTION _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 10/06/23 BEFORE THE FINAL STORMWATER ROW INSPECTION ** BUILDER NEEDS TO REMOVED THE GUTTER DRAINS FROM THE RIGHT OF WAY MOVE BACKWARD TO TOP OD ROW AND RECOMMEND YOU INSTALL POP-UP DRAINS TO PREVENT FUTURE WASH-OUTS INTO THE ROW ** NEED TO REPAIR AND FILL WASHOUTS HIGH LIGHTED WITH WHITE PAINT AND SOD IN THE ROW AREA ** NEED TO COVER ALL BARE AREAS OF EARTH TO PREVENT EROSION OF BARE EARTH ** LEFT SIDE NEED TO REMOVE SILT FENCE AT NEIGHBORS CULVERT ** NEED TO CLEAN ALL ERODED SEDIMENT FROM ROAD SIDE SWALE AND SOD BARE EARTH ** CLEAN CULVERTS
ROW - STORMWATER FINAL 10/16/2023 Disapproved - NO FEE EMADISON
Note: ** 10/16/23 ROW AT PROPERTY LINE WITH 27 FAY LN NEEDS REPAIRED AND MATCH THE EXISTING GRADE ** MATERIAL THAT HAS ERODED INTO SWALE NEEDS TO BE REMOVED AND BARE EARTH NEEDS TO BE COVERED WITH SOD AS INDICATED IN PREVIOUS INSPECTION ____________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 CORRECTIONS AS NOTED BELOW REQUIRED TO BE COMPLETED BEFORE FINAL ROW INSPECTION _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 10/06/23 BEFORE THE FINAL STORMWATER ROW INSPECTION ** BUILDER NEEDS TO REMOVED THE GUTTER DRAINS FROM THE RIGHT OF WAY MOVE BACKWARD TO TOP OD ROW AND RECOMMEND YOU INSTALL POP-UP DRAINS TO PREVENT FUTURE WASH-OUTS INTO THE ROW ** NEED TO REPAIR AND FILL WASHOUTS HIGH LIGHTED WITH WHITE PAINT AND SOD IN THE ROW AREA ** NEED TO COVER ALL BARE AREAS OF EARTH TO PREVENT EROSION OF BARE EARTH ** LEFT SIDE NEED TO REMOVE SILT FENCE AT NEIGHBORS CULVERT ** NEED TO CLEAN ALL ERODED SEDIMENT FROM ROAD SIDE SWALE AND SOD BARE EARTH ** CLEAN CULVERTS
ROW - STORMWATER FINAL 10/11/2023 Disapproved - NO FEE EMADISON
Note: ** 10/11/23 CORRECTIONS AS NOTED BELOW REQUIRED TO BE COMPLETED BEFORE FINAL ROW INSPECTION _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 10/06/23 BEFORE THE FINAL STORMWATER ROW INSPECTION ** BUILDER NEEDS TO REMOVED THE GUTTER DRAINS FROM THE RIGHT OF WAY MOVE BACKWARD TO TOP OD ROW AND RECOMMEND YOU INSTALL POP-UP DRAINS TO PREVENT FUTURE WASH-OUTS INTO THE ROW ** NEED TO REPAIR AND FILL WASHOUTS HIGH LIGHTED WITH WHITE PAINT AND SOD IN THE ROW AREA ** NEED TO COVER ALL BARE AREAS OF EARTH TO PREVENT EROSION OF BARE EARTH ** LEFT SIDE NEED TO REMOVE SILT FENCE AT NEIGHBORS CULVERT ** NEED TO CLEAN ALL ERODED SEDIMENT FROM ROAD SIDE SWALE AND SOD BARE EARTH ** CLEAN CULVERTS
U -UTILITY RESIDENTIAL FINAL 10/11/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 10/11/2023 Disapproved - NO FEE EMADISON
Note: ** 10/11/23 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION REQUIRED ___________________________________________________________________________________________________________________ nspector Notes from Inspection 9465 ** 10/06/23 BEFORE THE FINAL STORMWATER ROW INSPECTION ** BUILDER NEEDS TO REMOVED THE GUTTER DRAINS FROM THE RIGHT OF WAY MOVE BACKWARD TO TOP OD ROW AND RECOMMEND YOU INSTALL POP-UP DRAINS TO PREVENT FUTURE WASH-OUTS INTO THE ROW ** NEED TO REPAIR AND FILL WASHOUTS HIGH LIGHTED WITH WHITE PAINT AND SOD IN THE ROW AREA ** NEED TO COVER ALL BARE AREAS OF EARTH TO PREVENT EROSION OF BARE EARTH ** LEFT SIDE NEED TO REMOVE SILT FENCE AT NEIGHBORS CULVERT ** NEED TO CLEAN ALL ERODED SEDIMENT FROM ROAD SIDE SWALE AND SOD BARE EARTH ** CLEAN CULVERTS
ROW - FINAL APRON (AFTER POUR) 10/11/2023 APPROVED EMADISON
Note: 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION REQUIRED ___________________________________________________________________________________________________________________ nspector Notes from Inspection 9465 ** 10/06/23 BEFORE THE FINAL STORMWATER ROW INSPECTION ** BUILDER NEEDS TO REMOVED THE GUTTER DRAINS FROM THE RIGHT OF WAY MOVE BACKWARD TO TOP OD ROW AND RECOMMEND YOU INSTALL POP-UP DRAINS TO PREVENT FUTURE WASH-OUTS INTO THE ROW ** NEED TO REPAIR AND FILL WASHOUTS HIGH LIGHTED WITH WHITE PAINT AND SOD IN THE ROW AREA ** NEED TO COVER ALL BARE AREAS OF EARTH TO PREVENT EROSION OF BARE EARTH ** LEFT SIDE NEED TO REMOVE SILT FENCE AT NEIGHBORS CULVERT ** NEED TO CLEAN ALL ERODED SEDIMENT FROM ROAD SIDE SWALE AND SOD BARE EARTH ** CLEAN CULVERTS
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/06/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/06/2023 APPROVED - AS NOTED EMADISON
Note: ** 10/06/23 BEFORE THE FINAL STORMWATER ROW INSPECTION ** BUILDER NEEDS TO REMOVED THE GUTTER DRAINS FROM THE RIGHT OF WAY MOVE BACKWARD TO TOP OD ROW AND RECOMMEND YOU INSTALL POP-UP DRAINS TO PREVENT FUTURE WASH-OUTS INTO THE ROW ** NEED TO REPAIR AND FILL WASHOUTS HIGH LIGHTED WITH WHITE PAINT AND SOD IN THE ROW AREA ** NEED TO COVER ALL BARE AREAS OF EARTH TO PREVENT EROSION OF BARE EARTH ** LEFT SIDE NEED TO REMOVE SILT FENCE AT NEIGHBORS CULVERT ** NEED TO CLEAN ALL ERODED SEDIMENT FROM ROAD SIDE SWALE AND SOD BARE EARTH ** CLEAN CULVERTS
FOOTER 08/16/2023 Disapproved - NO FEE AGAETANO
Note: 08-16-2023 Please have approvd drawings on site for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL.
ELECTRIC - EARLY POWER 05/26/2023 APPROVED - AS NOTED AGAETANO
Note: 5/17/2023 - PREVIOUS INSPECTION NOTES 5/10/2023 - PREVIOUS INSPECTION NOTES 4/25/2023 - PREVIOUS INSPECTION NOTES 4/20/2023 - PREVIOUS INSPECTION NOTES 04-20-2023 1. No inspection, doors locked, need access for inspection. FBC R110.1 2. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 04-25-2023 1. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 2. Electrical conduit not Schedule 80. 3. 10-2 wire with box is off of the ground at meter. Please identify what the wires are serving. Please submit a revision to the building department and have approved revised electrical drawings on site. 05-10-2023 1. Electrical conduit not schedule 80. 2. 10-2 wire for separate solar inspection. Check that it is secured at final. RV outlets in back of home - check that they are secured at final inspection. 3. outlet in living room not safe off. 4. Sub panel added in closet in lanai - please submit revision to the building department prior to final inspection. 05-17-2023 1. Field work completed but not on electrical revision dated 5/6/2023. Installed RV hook up, outlets, and sub panel not on 5/6/23 electrical revision. Approved drawings not on site. 05-26-2023 FPL notified at 11:22am Back of home, Swim spa, power hook for next door, future outlet, and irrigation outlets not on drawings. Please revise and submit to the building department prior to final.
ELECTRIC - EARLY POWER 05/17/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 5/10/2023 - PREVIOUS INSPECTION NOTES 4/25/2023 - PREVIOUS INSPECTION NOTES 4/20/2023 - PREVIOUS INSPECTION NOTES 04-20-2023 1. No inspection, doors locked, need access for inspection. FBC R110.1 2. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 04-25-2023 1. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 2. Electrical conduit not Schedule 80. 3. 10-2 wire with box is off of the ground at meter. Please identify what the wires are serving. Please submit a revision to the building department and have approved revised electrical drawings on site. 05-10-2023 1. Electrical conduit not schedule 80. 2. 10-2 wire for separate solar inspection. Check that it is secured at final. RV outlets in back of home - check that they are secured at final inspection. 3. outlet in living room not safe off. 4. Sub panel added in closet in lanai - please submit revision to the building department prior to final inspection. 05-17-2023 1. Field work completed but not on electrical revision dated 5/6/2023. Installed RV hook up, outlets, and sub panel not on 5/6/23 electrical revision. Approved drawings not on site.
ELECTRIC - EARLY POWER 05/10/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 4/25/2023 - PREVIOUS INSPECTION NOTES 4/20/2023 - PREVIOUS INSPECTION NOTES 04-20-2023 1. No inspection, doors locked, need access for inspection. FBC R110.1 2. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 04-25-2023 1. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 2. Electrical conduit not Schedule 80. 3. 10-2 wire with box is off of the ground at meter. Please identify what the wires are serving. Please submit a revision to the building department and have approved revised electrical drawings on site. 05-10-2023 1. Electrical conduit not schedule 80. 2. 10-2 wire for separate solar inspection. Check that it is secured at final. RV outlets in back of home - check that they are secured at final inspection. 3. outlet in living room not safe off. 4. Sub panel added in closet in lanai - please submit revision to the building department prior to final inspection.
ELECTRIC - EARLY POWER 04/25/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 4/20/2023 - PREVIOUS INSPECTION NOTES 04-20-2023 1. No inspection, doors locked, need access for inspection. FBC R110.1 2. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 04-25-2023 1. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. 2. Electrical conduit not Schedule 80. 3. 10-2 wire with box is off of the ground at meter. Please identify what the wires are serving. Please submit a revision to the building department and have approved revised electrical drawings on site.
ELECTRIC - EARLY POWER 04/20/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 04-20-2023 1. No inspection, doors locked, need access for inspection. FBC R110.1 2. R319.1 Address identification. Buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visiblen from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained.
ROW - DRAINAGE 04/12/2023 APPROVED GBERTOLA
Note: 4/12/23=correction were made 4/11/2023 - PREVIOUS INSPECTION NOTES ** 04/10/23 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** BUILDER HAS (2) TWO MORE INSPECTIONS IN WHICH TO MAKE THE NECESSARY CORRECTIONS REQUIRED TO FIX THE DRAINAGE ISSUE IF CORRECTIONS NOT MADE BY 04/13/23 INSPECTION A STOP WORK ORDER WILL BE IMPOSED UPON THE PROPERTY AND PROJECT SITE. UNTIL CORRECTIONS ARE MADE** ** FOLLOW UP INSPECTION ON 04/12/23 ______________________________________________________________________________________________________________________ 4/10/2023 - PREVIOUS INSPECTION NOTES ** 04/10/23 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/11/23 _______________________________________________________________________________________________________________________ 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/10/23
ROW - DRAINAGE 04/11/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/10/23 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** BUILDER HAS (2) TWO MORE INSPECTIONS IN WHICH TO MAKE THE NECESSARY CORRECTIONS REQUIRED TO FIX THE DRAINAGE ISSUE IF CORRECTIONS NOT MADE BY 04/13/23 INSPECTION A STOP WORK ORDER WILL BE IMPOSED UPON THE PROPERTY AND PROJECT SITE. UNTIL CORRECTIONS ARE MADE** ** FOLLOW UP INSPECTION ON 04/12/23 ______________________________________________________________________________________________________________________ 4/10/2023 - PREVIOUS INSPECTION NOTES ** 04/10/23 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/11/23 _______________________________________________________________________________________________________________________ 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/10/23
ROW - DRAINAGE 04/10/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/10/23 NO CORRECTIONS MADE SINCE PREVIOUS INSPECTION ** BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/11/23 _______________________________________________________________________________________________________________________ 4/3/2023 - PREVIOUS INSPECTION NOTES ** 04/03/23 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/10/23
ROW - DRAINAGE 04/03/2023 Disapproved - NO FEE EMADISON
Note: ** 04/03/23 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY BLOCKED NOT ALLOWING FOR STORMWATER TO FLOW IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE DAILY ** FOLLOW UP INSPECTION ON 04/10/23
ROW- PRE-APRON (PRE-POUR) 03/06/2023 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR THE DRIVEWAY. ---------------------------------------------------------------------------------------------------- 2/21/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE ALONG FARISTON PLACE IS STILL OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL 2) SEE PHOTOS DATED 2/21/2023 TO SEE WHERE YOUR MITER END FORMS SHOULD GO MATCH THE WHITE PAINT ON THE FROM BOARDS --------------------------------------------------------------------------------- 2/13/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION. 2) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 3) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED. 4) TO MUCH WATER IN THE FOOTERS AND IN THE CULVERT PIPE. 5) CULVERT PIPES HAVE TO MUCH SOIL AROUND THEM. NEED TO HAVE MAXIMUM OF HALF WAY UP THE CULVERT PIPE. PLEASE SEE PHOTOS OF THE INSPECTION RESULTS. --------------------------------------------------------------------------------------------------------- 5) ALL FOOTERS NEED TO BE DUG OUT DO TO SOIL WASHING IN THEM. 2/7/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION 2) THERE ARE AREAS IN POURING AREA THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. 3) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 4) NEED TO HAVE A MINIMUM OF 18" FROM MITER END CUT TO THE EDGE OF THE DRIVEWAY THIS MEAN THAT ALL YOUR PIPES ARE TO SMALL FOR THE DRIVEWAYS 5) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED 6) NEED TO COMPACT SOIL AROUND THE CULVERTS SOIL NEEDS TO BE A MINIMUM OF 95% COMPACTION IN THE ENTIRE POURING AREAS.
ROW- PROJECT STATUS 03/03/2023 APPROVED PFLANAGAN
Note: MEET WITH CONTRACTOR FOR PRE POUR REQUIREMENTS
ROW- PRE-APRON (PRE-POUR) 02/21/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THE CULVERT PIPE ALONG FARISTON PLACE IS STILL OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL 2) SEE PHOTOS DATED 2/21/2023 TO SEE WHERE YOUR MITER END FORMS SHOULD GO MATCH THE WHITE PAINT ON THE FROM BOARDS --------------------------------------------------------------------------------- 2/13/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION. 2) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 3) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED. 4) TO MUCH WATER IN THE FOOTERS AND IN THE CULVERT PIPE. 5) CULVERT PIPES HAVE TO MUCH SOIL AROUND THEM. NEED TO HAVE MAXIMUM OF HALF WAY UP THE CULVERT PIPE. PLEASE SEE PHOTOS OF THE INSPECTION RESULTS. --------------------------------------------------------------------------------------------------------- 5) ALL FOOTERS NEED TO BE DUG OUT DO TO SOIL WASHING IN THEM. 2/7/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION 2) THERE ARE AREAS IN POURING AREA THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. 3) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 4) NEED TO HAVE A MINIMUM OF 18" FROM MITER END CUT TO THE EDGE OF THE DRIVEWAY THIS MEAN THAT ALL YOUR PIPES ARE TO SMALL FOR THE DRIVEWAYS 5) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED 6) NEED TO COMPACT SOIL AROUND THE CULVERTS SOIL NEEDS TO BE A MINIMUM OF 95% COMPACTION IN THE ENTIRE POURING AREAS.
ROW- PRE-APRON (PRE-POUR) 02/13/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION. 2) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 3) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED. 4) TO MUCH WATER IN THE FOOTERS AND IN THE CULVERT PIPE. 5) CULVERT PIPES HAVE TO MUCH SOIL AROUND THEM. NEED TO HAVE MAXIMUM OF HALF WAY UP THE CULVERT PIPE. PLEASE SEE PHOTOS OF THE INSPECTION RESULTS. --------------------------------------------------------------------------------------------------------- 5) ALL FOOTERS NEED TO BE DUG OUT DO TO SOIL WASHING IN THEM. 2/7/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION 2) THERE ARE AREAS IN POURING AREA THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. 3) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 4) NEED TO HAVE A MINIMUM OF 18" FROM MITER END CUT TO THE EDGE OF THE DRIVEWAY THIS MEAN THAT ALL YOUR PIPES ARE TO SMALL FOR THE DRIVEWAYS 5) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED 6) NEED TO COMPACT SOIL AROUND THE CULVERTS SOIL NEEDS TO BE A MINIMUM OF 95% COMPACTION IN THE ENTIRE POURING AREAS.
ROW- PRE-APRON (PRE-POUR) 02/07/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE EVERYTHING FORMED UP AT TIME OF THE INSPECTION 2) THERE ARE AREAS IN POURING AREA THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. 3) THE MITER END FLAIRS NEED TO BE 18" FROM EDGE OF CULVERT PIPE AT THE TOP OF FLAIR AND 9" AT THE END OF MITER END OF PIPE. 4) NEED TO HAVE A MINIMUM OF 18" FROM MITER END CUT TO THE EDGE OF THE DRIVEWAY THIS MEAN THAT ALL YOUR PIPES ARE TO SMALL FOR THE DRIVEWAYS 5) BOTH CULVERTS ARE OUT OF TOLERANCE FROM THE SWALE PLAN DEATAIL THAT WAS PROVIDED 6) NEED TO COMPACT SOIL AROUND THE CULVERTS SOIL NEEDS TO BE A MINIMUM OF 95% COMPACTION IN THE ENTIRE POURING AREAS.
INSULATION 08/23/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION NEED INSULATION CERTIFICATE ENERGY CONSERVATION R303.1.1.2
INSULATION 08/12/2022 Disapproved - NO FEE LMILLER
Note: NEED INSULATION CERTIFICATE ENERGY CONSERVATION R303.1.1.2
LATH/BRICK/ WATER BARRIER 08/01/2022 APPROVED AGAETANO
Note: UFER ground will now need to be accessible at all times.
ALL ROUGH 07/26/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. 5' head test not installed. P2503.5.1 2. Ceiling lights grounds not connected. All grounds need to be connected – NEC 110.14A 3. Bath fans not wired. 4. UFER ground not visible. 07-22-2022 - 1. Head test not holding water. 2. UFER ground will now need to be accessible at all times.
ALL ROUGH 07/22/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 1. 5' head test not installed. P2503.5.1 2. Ceiling lights grounds not connected. All grounds need to be connected – NEC 110.14A 3. Bath fans not wired. 4. UFER ground not visible. 07-22-2022 - 1. Head test not holding water. 2. UFER ground will now need to be accessible at all times. NEC 250.52.
ALL ROUGH 07/21/2022 Disapproved - NO FEE AGAETANO
Note: 1. 5' head test not installed. P2503.5.1 2. Ceiling lights grounds not connected. All grounds need to be connected – NEC 110.14A 3. Bath fans not wired. 4. UFER ground not visible. UFER – NEC 250.68(A). Accessibility.
GRAVITY SEWER TEST 06/17/2022 APPROVED MGIBSON
U - SEWER TIE IN 06/17/2022 APPROVED MGIBSON
ROOF VALLEY & METAL 01/18/2022 APPROVED AGAETANO
ELECTRIC TEMP POLE 11/23/2021 Disapproved -FEE REQUIRED JMUNSON
Note: No work done
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2021 APPROVED DCUSHING
TIE BEAM / LINTEL 10/11/2021 APPROVED DCUSHING
Note: THIS IS A REINSPECTION NOT READY FOR INSPECTION, NO HORIZONTAL STEEL HAS BEEN PLACED, VERTICAL STEEL IN ROGRESS -11:15AM
TIE BEAM / LINTEL 10/08/2021 Disapproved -FEE REQUIRED DCUSHING
Note: NOT READY FOR INSPECTION, NO HORIZONTAL STEEL HAS BEEN PLACED, VERTICAL STEEL IN ROGRESS -11:15AM
FOUND SURVEY APPROVED (OFFICE) 08/19/2021 APPROVED TBAKER
MONOLITHIC SLAB 08/11/2021 APPROVED PBUCKLEY
PLUMBING 1ST ROUGH UNDERGROUND 07/27/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/29/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 11/28/2023 11/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SW1 HOLD 11/06/2023 11/16/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM need to resubmit a new site plan that show all drainage of the lots
ZON COMPLETE 11/06/2023 11/07/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 11/06/2023 11/07/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 11/06/2023 11/07/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 11/01/2023 11/01/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BLD HOLD 10/19/2023 10/24/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Engineer's letter not accepted. Apparently, this relates to a missed footing inspection of some type. The letter does not document location, date of inspection or provide any indication the presence of re-inforcing steel and that work was inspected prior to pouring concrete. Provide X-Ray or GPR imagry of inspection area that proves the location of requried re-inforcing steel is present, lapped and tied. Provide report by company performing X-Ray or GPR explaining where imagry is taking (what area of the foundation) and what is shown in the imagry. Expose small portion of thickened edge footing and provide photographs with tape measure in photo proving required minimum depth of turned down edge below grade and width / thickness of turned down edge.
MECH COMPLETE 09/28/2023 10/02/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 05/30/2023 05/30/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical load calcs need to inlcude the new swim spa
ELEC COMPLETE 05/17/2023 05/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/19/2021 08/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/19/2021 08/19/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 05/06/2021 05/11/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
SW1 COMPLETE 05/06/2021 05/12/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD COMPLETE 05/06/2021 05/07/2021
Note: Released By: JPI
ENGIN1 COMPLETE 05/06/2021 05/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 03/16/2021 03/23/2021
Note: Held By: JPI 1. Soffit, 23352 has not been approved for 2020 Code cycle. 2. Provide rafter to ridge attachment detail.
CUSVC COMPLETE 03/16/2021 03/22/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 03/16/2021 03/17/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/16/2021 03/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/16/2021 03/17/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/16/2021 03/17/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/16/2021 03/23/2021
Note: Released By: JPI
SW1 HOLD 03/16/2021 03/22/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See highlighted marking on the attached checklist in attachments
ZON HOLD 03/16/2021 03/22/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Driveway configuration is not allowed. See Land Development Code Chapter 5: 5.03.04.B. Driveways for single-family, duplex and townhouse units shall be provided as follows: 3. Residential driveways entering the public right-of-way shall be a minimum of ten feet wide at the right-of-way line and 16 feet wide at the roadway edge. On corner lots,driveways shall not enter the right-of-way within 25 feet of where the two rights-of-way lines would intersect if extended. 4. Driveways shall either lead to a garage (standard driveway), or a circular driveway may be constructed. Except for corner lots, one approach of a circular driveway shall double as the standard driveway. The maximum walkway width is 6 feet. If it is wider than 6 feet is a patio and has to meet the building setbacks. (Entry walkway, walkway on the right side, and the A/C pad) Six foundation plantings are required on the left side facing the public right of way. Need to show the placement of five credit trees on the landscape plan, including one shade tree. (I only see the palm trees and it states that the type is to be determined. Not all palms are credit or shade trees. Need to specify. A sweet bay can be an understory tree. Robellini palms are a non-credit planting.)
SWALE COMPLETE 03/16/2021 06/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/01/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
REINSPECTION RESIDENTIAL ¤40.00 10/25/2023
SW ENG - INSPECTION 20 ¤20.00 10/25/2023
SW ENG - INSPECTION 20 ¤20.00 10/25/2023
SW ENG - INSPECTION 20 ¤20.00 10/25/2023
SW ENG - INSPECTION 20 ¤20.00 10/25/2023
SW ENG REINSPECTION 20 ¤20.00 10/25/2023
SW ENG REINSPECTION 30 ¤30.00 10/25/2023
SW ENG REINSPECTION 30 ¤30.00 10/25/2023
SW ENG REINSPECTION 30 ¤30.00 10/25/2023
CONTRACTOR CHANGE ¤40.00 10/25/2023
PLAN REVIEW - REVISION ¤32.50 10/25/2023
METER - DEPOSIT ¤60.00 05/17/2021
WATER- TURN ON ¤25.00 05/17/2021
ADMIN FEE ¤20.00 05/17/2021
BUILDING DISCOUNT 100% (¤2,090.00) 05/17/2021
ELECTRIC FEE ¤330.00 05/17/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 05/17/2021
IMPACT FEE FIRE ¤367.00 05/17/2021
IMPACT FEE PARKS ¤1,199.12 05/17/2021
IMPACT FEE SCHOOL ¤3,600.00 05/17/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 05/17/2021
MECHANICAL FEE ¤330.00 05/17/2021
WATER -IRRIGATION INSPECTION ¤25.00 05/17/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 05/17/2021
PLAN CHECK FEE ¤180.00 05/17/2021
PLUMBING FEE ¤330.00 05/17/2021
NEW RESIDENTIAL INSPECTIONS ¤900.00 05/17/2021
SITE PLAN 20 ¤20.00 05/17/2021
SURCHARGE FS 533.721 ¤2.00 05/17/2021
SURCHARGE - FS 468.631 ¤2.00 05/17/2021
STORM WATER PERMIT FEES ¤80.00 05/17/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 05/17/2021
SEWER INSPECTION ¤25.00 05/17/2021
SEWER CAPITAL FACILITY ¤4,664.55 05/17/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 05/17/2021
CONNECTION FEES ¤1,017.83 05/17/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,713.93