Permit #2021031387

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00980-0260
CONDITIONED SPACE: 2117 sqft
GARAGE: 657 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
Total Square Footage: 2998 sqft
Block: 00980
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: (386)437-1508
Location Address: 105 BUD HOLLOW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/09/2021
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X LLC

Address

29 COLUMBUS CT

PALM COAST, FL 32137

Lot: 0260
Contracted Stated Job Value: ¤190,000.00
Job Description: single family residence
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/15/2022 FINAL APPROVED RMARTIN
U -UTILITY RESIDENTIAL FINAL 02/10/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 02/09/2022 APPROVED KRUTH
ROW - STORMWATER FINAL 02/09/2022 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 02/09/2022 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 02/09/2022 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 01/04/2022 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
GRAVITY SEWER TEST 12/17/2021 APPROVED - AS NOTED MGIBSON
Note: THIS WAS APPROVED ON 12/16/21
U-CROSS CONNECTION 12/16/2021 APPROVED - AS NOTED DHANEY
Note: Approved Yard/IRR. not installed yet no cross CN.
U - SEWER TIE IN 12/16/2021 APPROVED - AS NOTED MGIBSON
Note: U-SEWER TIE IN APPROVED AND GRAVITY SEWER IS SCHEDULED FOR 12/17/21 BOTH ARE APPROVED
ELECTRIC - EARLY POWER 11/22/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:08 am
INSULATION 10/08/2021 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 10/08/2021 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 10/06/2021 APPROVED FWILLIS
ALL ROUGH 09/23/2021 APPROVED - AS NOTED RMARTIN
Note: NEED TO STRAP TRUSS ABOVE MASTER BED ROOM DOOR HEADER
ROOF VALLEY & METAL 08/20/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/28/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION PLANS IN CONSTRUCTION BOX NOT STAMPED BY THE CITY. POST IN GARAGE IS THE WRONG SIDE (highlighted on plans) COULDN'T LOCATE HEADER SCHEDULE OR DETAIL. NEED TO SEE A INTERIOR BEARING WALL DETAIL. INSPECTION STOPPED! 7/27/21 - STAMPED SET OF PLANS IS MISSING PAGE 3, WHICH IS THE FLOOR PLAN. STILL NEED TO SEE HEADER SCHEDULE AND ANY DETAIL. 7/28/21 - FYI - MINI PRINTS HAVE A BLUE STAMP ON TOP WHICH SHOWS THEY HAVE BEEN REVIEWED BY THE CITY. LARGE PRINTS DO NOT THEREFORE THEY CAN NOT BE USED BY STATE LISCENED INSPECTORS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/27/2021 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION PLANS IN CONSTRUCTION BOX NOT STAMPED BY THE CITY. POST IN GARAGE IS THE WRONG SIDE (highlighted on plans) COULDN'T LOCATE HEADER SCHEDULE OR DETAIL. NEED TO SEE A INTERIOR BEARING WALL DETAIL. INSPECTION STOPPED! 7/27/21 - STAMPED SET OF PLANS IS MISSING PAGE 3, WHICH IS THE FLOOR PLAN. STILL NEED TO SEE HEADER SCHEDULE AND ANY DETAIL. CALLED AND LEFT MESSAGE.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/23/2021 Disapproved - NO FEE FWILLIS
Note: PLANS IN CONSTRUCTION BOX NOT STAMPED BY THE CITY. POST IN GARAGE IS THE WRONG SIDE (highlighted on plans) COULDN'T LOCATE HEADER SCHEDULE OR DETAIL. NEED TO SEE A INTERIOR BEARING WALL DETAIL. INSPECTION STOPPED!
FOUND SURVEY APPROVED (OFFICE) 07/22/2021 APPROVED TBAKER
TIE BEAM / LINTEL 06/28/2021 APPROVED - AS NOTED FWILLIS
Note: INSTALL WINDOW SILLS BEFORE NEXT INSPECTION. THEY WILL BE CHECKED AT THAT TIME.
MONOLITHIC SLAB 06/11/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 06/01/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 05/10/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/22/2021 07/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/22/2021 07/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/22/2021 07/28/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 07/22/2021 07/22/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 07/19/2021 07/20/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on Foundation Survey is 1.2' higher than approved Site Plan. Please revise the appropriate drawing so they are in agreement and resubmit.
ZON COMPLETE 07/19/2021 07/19/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 05/26/2021 06/03/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Correction to revision: - changed product approval of (3) windows to Anderson and window sills. See Arch. letter.
BLD HOLD 05/18/2021 05/25/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision - changed windows to Anderson (manufacturer). 1. Provide product approval of exterior windows to be changed to Anderson per F.S. 553.842. 2. Letter of the Architect of record regarding the change of window sills for different addresses/permits shall also be included in revision and shall be submitted to corresponding permits/addresses for clarity per FBC 7th Ed. Sec. 107.2.1.
ZON COMPLETE 04/08/2021 04/08/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 04/01/2021 04/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 04/01/2021 04/01/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM No new Landscape plan provided showing three car garage
ENGIN1 COMPLETE 04/01/2021 04/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
SW1 COMPLETE 04/01/2021 04/07/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
SWALE COMPLETE 03/23/2021 06/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 03/22/2021 03/26/2021
Note: Released By: JPI
CUSVC COMPLETE 03/22/2021 03/23/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 03/22/2021 03/23/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit Electrical plan, electric load calcs and riser diagram.
ENGIN1 COMPLETE 03/22/2021 03/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/22/2021 03/24/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/22/2021 03/23/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 03/22/2021 03/26/2021
Note: Released By: JPI
SW1 COMPLETE 03/22/2021 03/29/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 03/22/2021 03/29/2021
Note: Held By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM Plans do not match site and landscape plans Plans are for a 3 car garage and site and landscape are for a 2 car garage Please correct whichever is wrong

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 04/09/2021
WATER- TURN ON ¤25.00 04/09/2021
ADMIN FEE ¤20.00 04/09/2021
CONNECTION FEES ¤1,017.83 04/09/2021
BUILDING DISCOUNT 100% (¤1,338.20) 04/09/2021
ELECTRIC FEE ¤222.60 04/09/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/09/2021
IMPACT FEE FIRE ¤367.00 04/09/2021
IMPACT FEE PARKS ¤1,199.12 04/09/2021
IMPACT FEE SCHOOL ¤3,600.00 04/09/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/09/2021
MECHANICAL FEE ¤222.60 04/09/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/09/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/09/2021
PLAN CHECK FEE ¤108.40 04/09/2021
PLUMBING FEE ¤222.60 04/09/2021
NEW RESIDENTIAL INSPECTIONS ¤542.00 04/09/2021
SITE PLAN 20 ¤20.00 04/09/2021
SURCHARGE FS 533.721 ¤2.00 04/09/2021
SURCHARGE - FS 468.631 ¤2.00 04/09/2021
STORM WATER PERMIT FEES ¤80.00 04/09/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/09/2021
SEWER CREDIT (¤850.00) 04/09/2021
SEWER INSPECTION ¤25.00 04/09/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/09/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/09/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,281.43