I want to search for...

Permit #2021031461

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00250-0010
CONDITIONED SPACE: 2173 sqft
GARAGE: 506 sqft
OPENED PORCH (WITH ROOF) : 216 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
Total Square Footage: 2983 sqft
Block: 00250
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 386-931-5395
Location Address: 2 FRENEAU LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/22/2021
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: BARARDO OLIVIO E & NYDIA M H&W

Address

14 COLLEGE COURT

PALM COAST, FL 32137

Lot: 0010
Contracted Stated Job Value: ¤375,000.00
Job Description: single family residence
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/14/2022 FINAL APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Energy calculations not on site. 2. Laundry fawcett hot water not hot. 3. Family room outlet not installed. 4. Outdoor GFI cover not installed. 1/13/2022 - Energy calculations do not match with the units.
BLD - BUILDING FINAL 01/13/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 1. Energy calculations not on site. 2. Laundry fawcett hot water not hot. 3. Family room outlet not installed. 4. Outdoor GFI cover not installed. 1/13/2022 - Energy calculations do not match with the units.
BLD - BUILDING FINAL 01/12/2022 Disapproved - NO FEE AGAETANO
Note: 1. Energy calculations not on site. 2. Laundry fawcett hot water not hot. 3. Family room outlet not installed. 4. Outdoor GFI cover not installed.
ELECTRIC - EARLY POWER 01/05/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION 1. Load side conductors can not be landed and power can not be on before this inspection. 2. Island wire and floor outlet need to be safed off Emailed FPL @ 11:00 AM
ELECTRIC - EARLY POWER 01/04/2022 Disapproved -FEE REQUIRED JMUNSON
Note: 1. Load side conductors can not be landed and power can not be on before this inspection. 2. Island wire and floor outlet need to be safed off
U -UTILITY RESIDENTIAL FINAL 01/04/2022 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 12/29/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 12/29/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 12/29/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 12/29/2021 APPROVED KRUTH
U-CROSS CONNECTION 12/28/2021 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 11/19/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
GRAVITY SEWER TEST 10/27/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 10/25/2021 APPROVED MGIBSON
U - SEWER TIE IN 10/25/2021 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 08/11/2021 APPROVED PBUCKLEY
Note: THIS IS A REINSPECTION incomplete need doors and windows trimmed with corner beads, stucco stops, banding etc. for inspection
INSULATION 08/06/2021 APPROVED PBUCKLEY
Note: need the following by insulation 1. DRYER DUCT NAIL PLATE M1502. 2. still need Dryer Exhaust seams and connections, sealed…Need to seal dryer exhaust duct per FBC M, 1502.4.2 and 1601.4.1 (check windows at insulation)
LATH/BRICK/ WATER BARRIER 07/30/2021 Disapproved - NO FEE WMILLER
Note: incomplete need doors and windows trimmed with corner beads, stucco stops, banding etc. for inspection
ALL ROUGH 07/27/2021 APPROVED - AS NOTED WMILLER
Note: THIS IS A REINSPECTION 1. NOTCHING AND DRILLING STUDS R 602.6(2) INTERIOR NON BEARING WALLS NOT MORE THAN 40 percent FOR NOTCHING, AND 60 percent WITH A MINIMUM OF 5/8 inch TO THE EDGE (dryer vent) 2. ALL RECEPTACLES IN GARAGES CIRCUITS NEED TO BE A MINIMUM OF 20 AMP AND GFCI PROTECTED, (Minimum 12-2 conduit) NEC 210.10 3. Dryer Exhaust seams and connections, sealed…Need to seal dryer exhaust duct per FBC M, 1502.4.2 and 1601.4.1 (check windows at insulation) 7-27-21... need the following by insulation 1. DRYER DUCT NAIL PLATE M1502. 2. still need Dryer Exhaust seams and connections, sealed…Need to seal dryer exhaust duct per FBC M, 1502.4.2 and 1601.4.1 (check windows at insulation)
ALL ROUGH 07/26/2021 Disapproved -FEE REQUIRED WMILLER
Note: 1. NOTCHING AND DRILLING STUDS R 602.6(2) INTERIOR NON BEARING WALLS NOT MORE THAN 40 percent FOR NOTCHING, AND 60 percent WITH A MINIMUM OF 5/8 inch TO THE EDGE (dryer vent) 2. ALL RECEPTACLES IN GARAGES CIRCUITS NEED TO BE A MINIMUM OF 20 AMP AND GFCI PROTECTED, (Minimum 12-2 conduit) NEC 210.10 3. Dryer Exhaust seams and connections, sealed…Need to seal dryer exhaust duct per FBC M, 1502.4.2 and 1601.4.1 (check windows at insulation)
ROOF VALLEY & METAL 07/01/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION need double coverage installed or proof of seam taper per code section 7-1-21... Inspection added to meet with construction rep. on site.Met with construction rep. on site for distructive inspcetion to veerify seams taped for single coverage underlayment. Inspector chose several areas to explor and it was determined that in all areas checked seams were taped. (result id approved)
ROOF VALLEY & METAL 06/29/2021 Disapproved - NO FEE WMILLER
Note: need double coverage installed or proof of seam taper per code section R905.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/25/2021 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/25/2021 APPROVED BGREVE
ELECTRIC-TUG 06/03/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:05
LATH/BRICK/ WATER BARRIER 05/27/2021 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 05/26/2021 APPROVED BGREVE
TIE BEAM / LINTEL 05/25/2021 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 05/22/2021 APPROVED TDOAK
MONOLITHIC SLAB 05/14/2021 APPROVED BGREVE
PLUMBING 1ST ROUGH UNDERGROUND 05/11/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 04/20/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/14/2022 01/14/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 05/21/2021 05/22/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/21/2021 05/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 04/15/2021 04/15/2021
Note: Released By: BARBIE BEMBRY - - BUILDINGDIVISION@PALMCOASTGOV.COM Held By: BARBIE BEMBRY - - BUILDINGDIVISION@PALMCOASTGOV.COM We had a returned payment of $14,984.43 made on 4/8/21 for the above permit for Waterside Homes. The checking account information was entered incorrectly in the portal.
MECH COMPLETE 04/06/2021 04/06/2021
Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/30/2021 03/30/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of Heat Load does not match the site plan. Energy calc can be at worst case but heatload is site specific. Revise to match site plan. (Second Request) Dirrection is SE
BLD COMPLETE 03/30/2021 03/30/2021
Note: Released By: JPI
ZON COMPLETE 03/30/2021 04/05/2021
Note: Released By: ESTELLE LENS - (386)986-2655 -
BLD HOLD 03/23/2021 03/29/2021
Note: Held By: JPI 1. Provide conventional roof framing details. Area behind trussed portion of entry is not illustrated as trusses.
CUSVC COMPLETE 03/23/2021 03/24/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 03/23/2021 03/24/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/23/2021 03/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
LOCATE COMPLETE 03/23/2021 03/25/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/23/2021 03/24/2021
Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Orientation of Heat Load does not match the site plan. Energy calc can be at worst case but heatload is site specific. Revise to match site plan
PLUM COMPLETE 03/23/2021 03/29/2021
Note: Released By: JPI
SW1 COMPLETE 03/23/2021 03/30/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 03/23/2021 03/30/2021
Note: Held By: ESTELLE LENS - (386)986-2655 - Nine trees are required for this site. The legend just has 2 oaks and 1 credit palm. Add a note to the color sheet stating that the siding and the stucco will be the same color.
SWALE COMPLETE 03/23/2021 06/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/14/2022
REINSPECTION RESIDENTIAL ¤40.00 01/14/2022
REINSPECTION FEE ¤40.00 01/14/2022
NEW RESIDENTIAL INSPECTIONS ¤750.00 04/22/2021
PLAN CHECK FEE ¤150.00 04/22/2021
PLUMBING FEE ¤285.00 04/22/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/22/2021
ADMIN FEE ¤20.00 04/22/2021
SITE PLAN 20 ¤20.00 04/22/2021
SURCHARGE FS 533.721 ¤2.00 04/22/2021
SURCHARGE - FS 468.631 ¤2.00 04/22/2021
STORM WATER PERMIT FEES ¤80.00 04/22/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/22/2021
SEWER CREDIT (¤1,147.00) 04/22/2021
SEWER INSPECTION ¤25.00 04/22/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/22/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/22/2021
METER - DEPOSIT ¤60.00 04/22/2021
WATER- TURN ON ¤25.00 04/22/2021
CONNECTION FEES ¤1,017.83 04/22/2021
BUILDING DISCOUNT 100% (¤1,775.00) 04/22/2021
ELECTRIC FEE ¤285.00 04/22/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/22/2021
IMPACT FEE FIRE ¤367.00 04/22/2021
IMPACT FEE PARKS ¤1,199.12 04/22/2021
IMPACT FEE SCHOOL ¤3,600.00 04/22/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/22/2021
MECHANICAL FEE ¤285.00 04/22/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/22/2021
3% PARKS IMPACT FEE CREDIT ¤35.97 04/15/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/15/2021
WATER -IRRIGATION INSPECTION (¤25.00) 04/15/2021
MECHANICAL FEE ¤285.00 04/15/2021
MECHANICAL FEE (¤285.00) 04/15/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/15/2021
IMPACT FEE TRANSPORTATION (¤1,718.00) 04/15/2021
IMPACT FEE SCHOOL (¤3,600.00) 04/15/2021
IMPACT FEE PARKS ¤1,199.12 04/15/2021
IMPACT FEE PARKS (¤1,199.12) 04/15/2021
IMPACT FEE SCHOOL ¤3,600.00 04/15/2021
IMPACT FEE FIRE (¤367.00) 04/15/2021
IMPACT FEE FIRE ¤367.00 04/15/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/15/2021
3% FIRE IMPACT FEE CREDIT ¤11.01 04/15/2021
ELECTRIC FEE ¤285.00 04/15/2021
ELECTRIC FEE (¤285.00) 04/15/2021
BUILDING DISCOUNT 100% (¤1,775.00) 04/15/2021
BUILDING DISCOUNT 100% ¤1,775.00 04/15/2021
CONNECTION FEES ¤1,017.83 04/15/2021
WATER- TURN ON (¤25.00) 04/15/2021
METER - DEPOSIT ¤60.00 04/15/2021
METER - DEPOSIT (¤60.00) 04/15/2021
CONNECTION FEES (¤1,017.83) 04/15/2021
ADMIN FEE ¤20.00 04/15/2021
ADMIN FEE (¤20.00) 04/15/2021
WATER- TURN ON ¤25.00 04/15/2021
PLUMBING FEE ¤285.00 04/15/2021
WATER CAPITAL FACILITY FEE (¤3,424.45) 04/15/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/15/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/15/2021
SEWER CAPITAL FACILITY (¤4,664.55) 04/15/2021
SEWER INSPECTION ¤25.00 04/15/2021
SEWER INSPECTION (¤25.00) 04/15/2021
SEWER CREDIT ¤1,147.00 04/15/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/15/2021
3% TRANS IMPACT FEE CREDIT ¤51.54 04/15/2021
SEWER CREDIT (¤1,147.00) 04/15/2021
STORM WATER PERMIT FEES (¤80.00) 04/15/2021
STORM WATER PERMIT FEES ¤80.00 04/15/2021
SURCHARGE - FS 468.631 ¤2.00 04/15/2021
SURCHARGE - FS 468.631 (¤2.00) 04/15/2021
SURCHARGE FS 533.721 ¤2.00 04/15/2021
SURCHARGE FS 533.721 (¤2.00) 04/15/2021
SITE PLAN 20 ¤20.00 04/15/2021
SITE PLAN 20 (¤20.00) 04/15/2021
NEW RESIDENTIAL INSPECTIONS ¤750.00 04/15/2021
PLAN CHECK FEE (¤150.00) 04/15/2021
PLAN CHECK FEE ¤150.00 04/15/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/15/2021
PLUMBING FEE (¤285.00) 04/15/2021
NEW RESIDENTIAL INSPECTIONS (¤750.00) 04/15/2021
NEW RESIDENTIAL INSPECTIONS (¤750.00) 04/08/2021
PLUMBING FEE ¤285.00 04/08/2021
PLUMBING FEE (¤285.00) 04/08/2021
PLAN CHECK FEE (¤150.00) 04/08/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 04/08/2021
3% PARKS IMPACT FEE CREDIT ¤35.97 04/08/2021
PLAN CHECK FEE ¤150.00 04/08/2021
NEW RESIDENTIAL INSPECTIONS ¤750.00 04/08/2021
SITE PLAN 20 ¤20.00 04/08/2021
SITE PLAN 20 (¤20.00) 04/08/2021
SURCHARGE FS 533.721 ¤2.00 04/08/2021
SURCHARGE - FS 468.631 ¤2.00 04/08/2021
SURCHARGE - FS 468.631 (¤2.00) 04/08/2021
SURCHARGE FS 533.721 (¤2.00) 04/08/2021
STORM WATER PERMIT FEES ¤80.00 04/08/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 04/08/2021
3% TRANS IMPACT FEE CREDIT ¤51.54 04/08/2021
STORM WATER PERMIT FEES (¤80.00) 04/08/2021
SEWER CREDIT (¤1,147.00) 04/08/2021
SEWER INSPECTION ¤25.00 04/08/2021
SEWER INSPECTION (¤25.00) 04/08/2021
SEWER CREDIT ¤1,147.00 04/08/2021
SEWER CAPITAL FACILITY ¤4,664.55 04/08/2021
SEWER CAPITAL FACILITY (¤4,664.55) 04/08/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 04/08/2021
WATER CAPITAL FACILITY FEE (¤3,424.45) 04/08/2021
WATER- TURN ON ¤25.00 04/08/2021
ADMIN FEE ¤20.00 04/08/2021
ADMIN FEE (¤20.00) 04/08/2021
METER - DEPOSIT ¤60.00 04/08/2021
METER - DEPOSIT (¤60.00) 04/08/2021
WATER- TURN ON (¤25.00) 04/08/2021
BUILDING DISCOUNT 100% (¤1,775.00) 04/08/2021
BUILDING DISCOUNT 100% ¤1,775.00 04/08/2021
CONNECTION FEES ¤1,017.83 04/08/2021
CONNECTION FEES (¤1,017.83) 04/08/2021
ELECTRIC FEE ¤285.00 04/08/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 04/08/2021
3% FIRE IMPACT FEE CREDIT ¤11.01 04/08/2021
ELECTRIC FEE (¤285.00) 04/08/2021
IMPACT FEE FIRE ¤367.00 04/08/2021
IMPACT FEE PARKS ¤1,199.12 04/08/2021
IMPACT FEE PARKS (¤1,199.12) 04/08/2021
IMPACT FEE FIRE (¤367.00) 04/08/2021
IMPACT FEE SCHOOL ¤3,600.00 04/08/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 04/08/2021
IMPACT FEE TRANSPORTATION (¤1,718.00) 04/08/2021
IMPACT FEE SCHOOL (¤3,600.00) 04/08/2021
MECHANICAL FEE (¤285.00) 04/08/2021
MECHANICAL FEE ¤285.00 04/08/2021
WATER -IRRIGATION INSPECTION ¤25.00 04/08/2021
WATER -IRRIGATION INSPECTION (¤25.00) 04/08/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,104.43